EP2799207 - BLOW-MOLDING DEVICE AND METHOD FOR MANUFACTURING A BLOW-MOLDED CONTAINER [Right-click to bookmark this link] | |||
Former [2014/45] | BLOW-MOLDING DEVICE AND PRODUCTION METHOD FOR BLOW-MOLDED CONTAINER | ||
[2020/02] | Status | No opposition filed within time limit Status updated on 05.03.2021 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 27.03.2020 | ||
Former | Grant of patent is intended Status updated on 17.12.2019 | ||
Former | Examination is in progress Status updated on 17.02.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Discma AG Thurgauerstrasse 34 8050 Zürich / CH | [2018/36] |
Former [2015/23] | For all designated states Discma AG c/o SIDEL INTERNATIONAL AG Bösch 67 6331 Hünenberg / CH | ||
Former [2014/45] | For all designated states Yoshino Kogyosho Co., Ltd. 2-6 Ojima 3-chome Koto-ku Tokyo 136-8531 / JP | Inventor(s) | 01 /
SATO, Sumito c/o Yoshino Kogyosho Co., Ltd. Kanagawa Technical Center 380, Sannomiya Isehara-shi Kanagawa 259-1103 / JP | 02 /
TAMURA, Nobuyuki c/o Yoshino Kogyosho Co., Ltd. Kanagawa Technical Center 380, Sannomiya Isehara-shi Kanagawa 259-1103 / JP | 03 /
NAGASHIMA, Takeshi c/o Yoshino Kogyosho Co., Ltd. Kanagawa Technical Center 380, Sannomiya Isehara-shi Kanagawa 259-1103 / JP | [2014/45] | Representative(s) | Lavoix 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | [2020/18] |
Former [2014/45] | Uno, Jennifer Elizabeth Hayes HGF Limited Saviour House 9 St Saviourgate York, YO1 8NQ / GB | Application number, filing date | 12861467.4 | 22.10.2012 | [2020/18] | WO2012JP06739 | Priority number, date | JP20110286343 | 27.12.2011 Original published format: JP 2011286343 | JP20110285564 | 27.12.2011 Original published format: JP 2011285564 | [2014/45] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013099073 | Date: | 04.07.2013 | Language: | JA | [2013/27] | Type: | A1 Application with search report | No.: | EP2799207 | Date: | 05.11.2014 | Language: | EN | [2014/45] | Type: | B1 Patent specification | No.: | EP2799207 | Date: | 29.04.2020 | Language: | EN | [2020/18] | Search report(s) | International search report - published on: | JP | 04.07.2013 | (Supplementary) European search report - dispatched on: | EP | 30.09.2015 | Classification | IPC: | B29C49/58, // B29C49/06, B29C49/12, B29K101/12, B29L31/00 | [2015/44] | CPC: |
B29C49/58 (EP,US);
B29C49/4802 (US);
B29C49/28 (US);
B29C2949/0715 (EP);
B29C49/06 (EP,US);
B29C49/12 (EP,US);
|
Former IPC [2014/45] | B29C49/28, B29C49/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | BLASFORMVORRICHTUNG UND VERFAHREN ZUR HERSTELLUNG EINES BLASGEFORMTEN BEHÄLTERS | [2020/02] | English: | BLOW-MOLDING DEVICE AND METHOD FOR MANUFACTURING A BLOW-MOLDED CONTAINER | [2020/02] | French: | DISPOSITIF DE MOULAGE PAR SOUFFLAGE ET PROCÉDÉ DE FABRICATION POUR CONTENANT MOULÉ PAR SOUFFLAGE | [2014/45] |
Former [2014/45] | BLASFORMVORRICHTUNG UND VERFAHREN ZUR HERSTELLUNG BLASGEFORMTER BEHÄLTER | ||
Former [2014/45] | BLOW-MOLDING DEVICE AND PRODUCTION METHOD FOR BLOW-MOLDED CONTAINER | Entry into regional phase | 25.06.2014 | Translation filed | 25.06.2014 | National basic fee paid | 25.06.2014 | Search fee paid | 25.06.2014 | Designation fee(s) paid | 25.06.2014 | Examination fee paid | Examination procedure | 25.06.2014 | Examination requested [2014/45] | 03.06.2016 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 03.08.2016 | Amendment by applicant (claims and/or description) | 17.02.2017 | Despatch of a communication from the examining division (Time limit: M06) | 16.08.2017 | Reply to a communication from the examining division | 06.02.2018 | Despatch of a communication from the examining division (Time limit: M04) | 18.05.2018 | Reply to a communication from the examining division | 05.09.2018 | Despatch of a communication from the examining division (Time limit: M06) | 08.02.2019 | Reply to a communication from the examining division | 10.05.2019 | Despatch of a communication from the examining division (Time limit: M04) | 05.09.2019 | Reply to a communication from the examining division | 18.12.2019 | Communication of intention to grant the patent | 20.03.2020 | Fee for grant paid | 20.03.2020 | Fee for publishing/printing paid | 20.03.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.02.2017 | Opposition(s) | 01.02.2021 | No opposition filed within time limit [2021/14] | Request for further processing for: | The application is deemed to be withdrawn due to failure to indicate the wish to proceed further with the application | 03.08.2016 | Request for further processing filed | 03.08.2016 | Full payment received (date of receipt of payment) Request granted | 24.08.2016 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 03.08.2016 | Request for further processing filed | 03.08.2016 | Full payment received (date of receipt of payment) Request granted | 24.08.2016 | Decision despatched | Fees paid | Renewal fee | 18.08.2014 | Renewal fee patent year 03 | 26.10.2015 | Renewal fee patent year 04 | 25.10.2016 | Renewal fee patent year 05 | 23.10.2017 | Renewal fee patent year 06 | 26.10.2018 | Renewal fee patent year 07 | 21.10.2019 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.10.2012 | AL | 29.04.2020 | AT | 29.04.2020 | CY | 29.04.2020 | CZ | 29.04.2020 | DK | 29.04.2020 | EE | 29.04.2020 | ES | 29.04.2020 | FI | 29.04.2020 | HR | 29.04.2020 | LT | 29.04.2020 | LV | 29.04.2020 | MC | 29.04.2020 | MK | 29.04.2020 | MT | 29.04.2020 | NL | 29.04.2020 | PL | 29.04.2020 | RO | 29.04.2020 | RS | 29.04.2020 | SE | 29.04.2020 | SI | 29.04.2020 | SK | 29.04.2020 | SM | 29.04.2020 | TR | 29.04.2020 | BG | 29.07.2020 | NO | 29.07.2020 | GR | 30.07.2020 | IS | 29.08.2020 | PT | 31.08.2020 | GB | 22.10.2020 | IE | 22.10.2020 | LU | 22.10.2020 | BE | 31.10.2020 | [2022/32] |
Former [2022/27] | HU | 22.10.2012 | |
AL | 29.04.2020 | ||
AT | 29.04.2020 | ||
CY | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
MT | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
TR | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
GB | 22.10.2020 | ||
IE | 22.10.2020 | ||
LU | 22.10.2020 | ||
BE | 31.10.2020 | ||
Former [2022/26] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
TR | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
GB | 22.10.2020 | ||
IE | 22.10.2020 | ||
LU | 22.10.2020 | ||
BE | 31.10.2020 | ||
Former [2021/46] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
GB | 22.10.2020 | ||
IE | 22.10.2020 | ||
LU | 22.10.2020 | ||
BE | 31.10.2020 | ||
Former [2021/38] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
GB | 22.10.2020 | ||
LU | 22.10.2020 | ||
BE | 31.10.2020 | ||
Former [2021/36] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
LU | 22.10.2020 | ||
BE | 31.10.2020 | ||
Former [2021/31] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
LU | 22.10.2020 | ||
Former [2021/24] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/10] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/09] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/08] | AL | 29.04.2020 | |
DK | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/04] | AL | 29.04.2020 | |
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/01] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/51] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/50] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/48] | FI | 29.04.2020 | |
LT | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/47] | LT | 29.04.2020 | |
NO | 29.07.2020 | ||
IS | 29.08.2020 | ||
Former [2020/46] | IS | 29.08.2020 | Documents cited: | Search | [X]JP2009166482 (TOYO SEIKAN KAISHA LTD) [X] 1-15 * paragraphs [0009] - [0031] * * abstract *; | [E]JP2013132861 (YOSHINO KOGYOSHO CO LTD) [E] 1-15* figures 1-11 *; | [E]EP2799208 (YOSHINO KOGYOSHO CO LTD [JP]) [E] 1-15 * abstract *; | [E]EP2810763 (YOSHINO KOGYOSHO CO LTD [JP]) [E] 1-15 * abstract *; | [E]EP2832524 (YOSHINO KOGYOSHO CO LTD [JP]) [E] 1-15 * abstract *; | [E]EP2832682 (YOSHINO KOGYOSHO CO LTD [JP]) [E] 1-15 * abstract *; | [E]EP2902169 (DISCMA AG [CH]) [E] 1-15 * abstract * | International search | [A]JPH04173131 (NISSEI ASB MACHINE CO LTD); | [A]JP2003201129 (EMHART GLASS SA); | [X]JP2009166482 (TOYO SEIKAN KAISHA LTD); | [A]JP2011105019 (NAKAZAWA NAMIO, et al) | by applicant | JP2003251685 |