blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2817135

EP2817135 - METHOD FOR INTEGRALLY MOLDING METAL AND RESIN AND METAL-RESIN COMPOSITE STRUCTURE OBTAINABLE BY THE SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.07.2018
Database last updated on 27.07.2024
FormerThe patent has been granted
Status updated on  11.08.2017
FormerGrant of patent is intended
Status updated on  10.05.2017
FormerExamination is in progress
Status updated on  23.12.2016
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Shenzhen BYD Auto R&D Company Limited
Part B, 1/F, Bldg Nº B2, Yucan Industrial Area
Lanzhu Road, Shenzhen Export Processing Zone
Shenzhen Grand Industrial Zone
Shenzhen, Guangdong 518118 / CN
For all designated states
BYD Company Limited
No. 3009, BYD Road Pingshan
Shenzhen 518118 / CN
[2015/01]
Inventor(s)01 / GONG, Qing
No. 3009 BYD Road
Pingshan
Shenzhen Guangdong 518118 / CN
02 / ZHANG, Xiong
No. 3009 BYD Road
Pingshan
Shenzhen Guangdong 518118 / CN
03 / ZHANG, Yihu
No. 3009 BYD Road
Pingshan
Shenzhen Guangdong 518118 / CN
04 / ZHOU, Wei
No. 3009 BYD Road
Pingshan
Shenzhen Guangdong 518118 / CN
 [2015/01]
Representative(s)Gulde & Partner
Patent- und Rechtsanwaltskanzlei mbB
Wallstraße 58/59
10179 Berlin / DE
[2015/01]
Application number, filing date12869562.418.07.2012
[2017/37]
WO2012CN78830
Priority number, dateCN2012104364824.02.2012         Original published format: CN201210043648
[2015/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013123754
Date:29.08.2013
Language:EN
[2013/35]
Type: A1 Application with search report 
No.:EP2817135
Date:31.12.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 29.08.2013 takes the place of the publication of the European patent application.
[2015/01]
Type: B1 Patent specification 
No.:EP2817135
Date:13.09.2017
Language:EN
[2017/37]
Search report(s)International search report - published on:CN29.08.2013
(Supplementary) European search report - dispatched on:EP25.09.2015
ClassificationIPC:B29C45/14, B32B15/08, B32B27/28, B32B27/32, B32B27/34, C23F1/16, C25D11/08, C25D11/16, C25D11/18, C25D11/24, // B29K105/00, B29K71/00, B29K705/02, B29L9/00
[2017/21]
CPC:
B32B15/08 (EP,US); B29C45/14 (KR); B29C45/14795 (US);
B29C45/14311 (EP,US); B29C45/14778 (EP,US); B32B27/28 (EP,US);
B32B27/32 (EP,US); B32B27/34 (EP,US); C25D11/08 (EP,US);
C25D11/16 (EP,US); C25D11/18 (US); C25D11/24 (EP,US);
C25D11/246 (EP,US); B29C2045/14803 (EP,US); B29C2045/14868 (US);
B29K2071/12 (EP,US); B29K2105/0067 (EP,US); B29K2105/0088 (EP,US);
B29K2705/02 (EP,US); B29K2715/003 (EP,US); B29K2995/0097 (EP,US);
B29L2009/003 (EP,US); B32B2270/00 (EP,US); Y10T428/24997 (EP,US) (-)
Former IPC [2015/01]B29C45/14, B32B15/08, C23F1/16
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/01]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN ZUR INTEGRALEN FORMUNG VON METALL UND HARZ UND DAMIT GEWINNBARER METALL-HARZ-VERBUNDWERKSTOFF[2015/01]
English:METHOD FOR INTEGRALLY MOLDING METAL AND RESIN AND METAL-RESIN COMPOSITE STRUCTURE OBTAINABLE BY THE SAME[2015/01]
French:PROCÉDÉ POUR MOULER INTÉGRALEMENT DU MÉTAL ET DE LA RÉSINE ET UNE STRUCTURE COMPOSITE DE RÉSINE ET DE MÉTAL POUVANT ÊTRE OBTENUE PAR LEDIT PROCÉDÉ[2015/01]
Entry into regional phase23.07.2014National basic fee paid 
23.07.2014Search fee paid 
23.07.2014Designation fee(s) paid 
23.07.2014Examination fee paid 
Examination procedure23.07.2014Examination requested  [2015/01]
20.04.2016Amendment by applicant (claims and/or description)
19.09.2016Despatch of a communication from the examining division (Time limit: M04)
22.12.2016Reply to a communication from the examining division
11.05.2017Communication of intention to grant the patent
03.08.2017Fee for grant paid
03.08.2017Fee for publishing/printing paid
03.08.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.09.2016
Opposition(s)14.06.2018No opposition filed within time limit [2018/34]
Fees paidRenewal fee
30.07.2014Renewal fee patent year 03
23.07.2015Renewal fee patent year 04
22.07.2016Renewal fee patent year 05
24.07.2017Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.07.2012
AL13.09.2017
AT13.09.2017
CY13.09.2017
CZ13.09.2017
DK13.09.2017
EE13.09.2017
ES13.09.2017
FI13.09.2017
HR13.09.2017
IT13.09.2017
LT13.09.2017
LV13.09.2017
MC13.09.2017
MK13.09.2017
PL13.09.2017
PT13.09.2017
RO13.09.2017
RS13.09.2017
SE13.09.2017
SI13.09.2017
SK13.09.2017
SM13.09.2017
TR13.09.2017
BG13.12.2017
NO13.12.2017
GR14.12.2017
IS13.01.2018
[2020/34]
Former [2020/31]HU18.07.2012
AT13.09.2017
CY13.09.2017
CZ13.09.2017
DK13.09.2017
EE13.09.2017
ES13.09.2017
FI13.09.2017
HR13.09.2017
IT13.09.2017
LT13.09.2017
LV13.09.2017
MC13.09.2017
MK13.09.2017
PL13.09.2017
PT13.09.2017
RO13.09.2017
RS13.09.2017
SE13.09.2017
SI13.09.2017
SK13.09.2017
SM13.09.2017
TR13.09.2017
BG13.12.2017
NO13.12.2017
GR14.12.2017
IS13.01.2018
Former [2020/28]HU18.07.2012
AT13.09.2017
CZ13.09.2017
DK13.09.2017
EE13.09.2017
ES13.09.2017
FI13.09.2017
HR13.09.2017
IT13.09.2017
LT13.09.2017
LV13.09.2017
MC13.09.2017
PL13.09.2017
PT13.09.2017
RO13.09.2017
RS13.09.2017
SE13.09.2017
SI13.09.2017
SK13.09.2017
SM13.09.2017
TR13.09.2017
BG13.12.2017
NO13.12.2017
GR14.12.2017
IS13.01.2018
Former [2020/16]AT13.09.2017
CZ13.09.2017
DK13.09.2017
EE13.09.2017
ES13.09.2017
FI13.09.2017
HR13.09.2017
IT13.09.2017
LT13.09.2017
LV13.09.2017
MC13.09.2017
PL13.09.2017
RO13.09.2017
RS13.09.2017
SE13.09.2017
SI13.09.2017
SK13.09.2017
SM13.09.2017
TR13.09.2017
BG13.12.2017
NO13.12.2017
GR14.12.2017
IS13.01.2018
Former [2019/15]AT13.09.2017
CZ13.09.2017
DK13.09.2017
EE13.09.2017
ES13.09.2017
FI13.09.2017
HR13.09.2017
IT13.09.2017
LT13.09.2017
LV13.09.2017
MC13.09.2017
PL13.09.2017
RO13.09.2017
RS13.09.2017
SE13.09.2017
SI13.09.2017
SK13.09.2017
SM13.09.2017
BG13.12.2017
NO13.12.2017
GR14.12.2017
IS13.01.2018
Former [2018/52]AT13.09.2017
CZ13.09.2017
DK13.09.2017
EE13.09.2017
ES13.09.2017
FI13.09.2017
HR13.09.2017
IT13.09.2017
LT13.09.2017
LV13.09.2017
PL13.09.2017
RO13.09.2017
RS13.09.2017
SE13.09.2017
SI13.09.2017
SK13.09.2017
SM13.09.2017
BG13.12.2017
NO13.12.2017
GR14.12.2017
IS13.01.2018
Former [2018/35]AT13.09.2017
CZ13.09.2017
DK13.09.2017
EE13.09.2017
ES13.09.2017
FI13.09.2017
HR13.09.2017
IT13.09.2017
LT13.09.2017
LV13.09.2017
PL13.09.2017
RO13.09.2017
RS13.09.2017
SE13.09.2017
SK13.09.2017
SM13.09.2017
BG13.12.2017
NO13.12.2017
GR14.12.2017
IS13.01.2018
Former [2018/24]AT13.09.2017
CZ13.09.2017
EE13.09.2017
ES13.09.2017
FI13.09.2017
HR13.09.2017
IT13.09.2017
LT13.09.2017
LV13.09.2017
PL13.09.2017
RO13.09.2017
RS13.09.2017
SE13.09.2017
SK13.09.2017
SM13.09.2017
BG13.12.2017
NO13.12.2017
GR14.12.2017
IS13.01.2018
Former [2018/21]CZ13.09.2017
ES13.09.2017
FI13.09.2017
HR13.09.2017
LT13.09.2017
LV13.09.2017
RS13.09.2017
SE13.09.2017
BG13.12.2017
NO13.12.2017
GR14.12.2017
Former [2018/12]ES13.09.2017
FI13.09.2017
HR13.09.2017
LT13.09.2017
LV13.09.2017
RS13.09.2017
SE13.09.2017
BG13.12.2017
NO13.12.2017
GR14.12.2017
Former [2018/11]ES13.09.2017
FI13.09.2017
HR13.09.2017
LT13.09.2017
RS13.09.2017
SE13.09.2017
BG13.12.2017
NO13.12.2017
GR14.12.2017
Former [2018/09]FI13.09.2017
LT13.09.2017
SE13.09.2017
NO13.12.2017
Former [2018/08]FI13.09.2017
LT13.09.2017
NO13.12.2017
Former [2018/07]LT13.09.2017
NO13.12.2017
Documents cited:SearchJP2006001216  [ ] (TAISEI PLAS CO LTD);
 [Y]EP1958763  (TAISEI PLAS CO LTD [JP]) [Y] 1-13 * figures 1,2; claims 1-16 *;
 [Y]EP2154203  (ASAHI KASEI CHEMICALS CORP [JP]) [Y] 1-13 * paragraphs [0006] , [0054] , [0102] , [0104]; claims 1,20 *;
 [Y]  - Taisei Plas Co., Ltd., Japan, "Composite materials of anodized aluminum alloys and thermoplastic resins, and their manufacture by injection molding", CA, CHEMICAL ABSTRACTS SERVICE, COLUMBUS, OHIO, US, (20060126), Database accession no. 144:89290, XP002743882 [Y] 1-13 * abstract *
 [Y]  - JIE GONG ET AL, "Electrochemical/chemical synthesis of nanostructured arrays of oxide cones or rings", JOURNAL OF MATERIALS CHEMISTRY, (20080312), vol. 18, no. 15, doi:10.1039/b719097b, ISSN 0959-9428, page 1741, XP055211319 [Y] 1-13 * page 1742, column r - page 1743, column r; figures 2a,2b *

DOI:   http://dx.doi.org/10.1039/b719097b
 [Y]  - WONBAE LEE ET AL, "Nanostructure-Dependent Water-Droplet Adhesiveness Change in Superhydrophobic Anodic Aluminum Oxide Surfaces: From Highly Adhesive to Self-Cleanable", LANGMUIR, (20100202), vol. 26, no. 3, doi:10.1021/la904095x, ISSN 0743-7463, pages 1412 - 1415, XP055211376 [Y] 1-13 * the whole document *

DOI:   http://dx.doi.org/10.1021/la904095x
 [Y]  - "Supporting Information: Nanostructure-Dependent Water-Droplet Adhesiveness Change in Superhydrophobic Anodic Aluminum Oxide Surfaces: From Highly Adhesive to Self-Cleanable", (20091229), URL: http://pubs.acs.org/doi/suppl/10.1021/la904095x/suppl_file/la904095x_si_001.pdf, (20150904), XP055211428 [Y] 1-13 * the whole document *
International search[Y]CN101578170  (TAISEI PLAS CO LTD [JP]);
 [Y]CN101941271  (SHENZHEN FUTAIHONG PREC IND CO)
by applicantCN1492804
 CN1717323
 JP2006001216
 CN101341023
 CN101631671
 EP2154203
 CN101941271
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.