blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2849507

EP2849507 - REFERENCE SIGNAL MEASUREMENT METHOD, BASE STATION, AND USER EQUIPMENT [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  29.04.2016
Database last updated on 12.07.2024
Most recent event   Tooltip29.04.2016Withdrawal of applicationpublished on 01.06.2016  [2016/22]
Applicant(s)For all designated states
Fujitsu Limited
1-1, Kamikodanaka 4-chome
Nakahara-ku
Kawasaki-shi, Kanagawa 211-8588 / JP
[N/P]
Former [2015/12]For all designated states
Fujitsu Limited
1-1, Kamikondanaka 4-chome
Nakahara-ku
Kawasaki-shi, Kanagawa 211-8588 / JP
Inventor(s)01 / WU, Lianhai
Fujitsu Research and Development Center Co. Ltd.
13F Tower A
Ocean International Center
No.56 Dong Si Huan Zhong Rd, Chaoyang District
Beijing 100025 / CN
02 / LI, Hongchao
Fujitsu Research and Development Center Co. Ltd.
13F Tower A
Ocean International Center
No.56 Dong Si Huan Zhong Rd, Chaoyang District
Beijing 100025 / CN
03 / CHANG, Ningjuan
Fujitsu Research and Development Center Co. Ltd.
13F Tower A
Ocean International Center
No.56 Dong Si Huan Zhong Rd, Chaoyang District
Beijing 100025 / CN
04 / ZHOU, Hua
Fujitsu Research and Development Center Co. Ltd.
13F Tower A
Ocean International Center
No.56 Dong Si Huan Zhong Rd, Chaoyang District
Beijing 100025 / CN
 [2015/12]
Representative(s)Ward, James Norman, et al
Haseltine Lake Kempner LLP
Bürkleinstrasse 10
80538 München / DE
[N/P]
Former [2015/12]Ward, James Norman
Haseltine Lake LLP Lincoln House, 5th Floor 300 High Holborn
London WC1V 7JH / GB
Application number, filing date12876200.208.05.2012
WO2012CN75189
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013166657
Date:14.11.2013
Language:ZH
[2013/46]
Type: A1 Application with search report 
No.:EP2849507
Date:18.03.2015
Language:EN
[2015/12]
Search report(s)International search report - published on:CN14.11.2013
(Supplementary) European search report - dispatched on:EP24.11.2015
ClassificationIPC:H04W72/04
[2015/12]
CPC:
H04L5/0073 (EP,US); H04L5/0032 (US); H04L5/0048 (US);
H04W24/08 (US); H04W48/16 (EP,US); H04W84/045 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/12]
TitleGerman:REFERENZSIGNALMESSVERFAHREN, BASISSTATION UND BENUTZERVORRICHTUNG[2015/12]
English:REFERENCE SIGNAL MEASUREMENT METHOD, BASE STATION, AND USER EQUIPMENT[2015/12]
French:PROCÉDÉ DE MESURE DE SIGNAL DE RÉFÉRENCE, STATION DE BASE, ET ÉQUIPEMENT UTILISATEUR[2015/12]
Entry into regional phase22.10.2014Translation filed 
01.12.2014National basic fee paid 
01.12.2014Search fee paid 
01.12.2014Designation fee(s) paid 
01.12.2014Examination fee paid 
Examination procedure22.10.2014Amendment by applicant (claims and/or description)
01.12.2014Examination requested  [2015/12]
22.04.2016Application withdrawn by applicant  [2016/22]
Fees paidRenewal fee
01.12.2014Renewal fee patent year 03
05.03.2015Renewal fee patent year 04
03.03.2016Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]US2009196162  (SAMBHWANI SHARAD DEEPAK [US], et al) [A] 1-16 * abstract ** paragraph [8], [12]-[16], [44], [53];; claim 1 *;
 [XYI]WO2011122833  (LG ELECTRONICS INC [KR], et al) [X] 15 * abstract * * page 3, line 22 - page 4, line 19; page 4, line 30 - page 6, line 26; page 6, line 12 - page 8, line 2; page 55, lines 4-15;; claims 1-8 * [Y] 12 [I] 1-11,13,14,16;
 [XYI]WO2011130451  (QUALCOMM INC [US], et al) [X] 1,5,10 * abstract * * paragraphs [5]-[8], [33], [40]-[41], [58]-[59], [62]-[67], [70]-[74];; figure 3; claims 1-8 * [Y] 12 [I] 2-4,6-9,11-16;
 [A]  - 3GPP DRAFT; GP-023100, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20021114), vol. TSG GERAN, no. Sophia; 20021114, XP050006932 [A] 1-16 * the whole document *
 [A]  - NTT DOCOMO ET AL, "Addition of the default value of Carrier Aggregation parameters", 3GPP DRAFT; R5-120438 36508 CARRIER_AGGREGATION PARAMETERS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120127), vol. RAN WG5, no. Dresden, Germany; 20120206 - 20120210, XP050570604 [A] 1-16 * page 7 *
International search[Y]CN101322337  (QUALCOMM INC [US]);
 [A]CN101784116  (HUAWEI TECH CO LTD);
 [Y]CN101889471  (PANASONIC CORP);
 [A]CN102300244  (ZTE CORPORATION)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.