EP2875073 - A LINEAR LOW DENSITY POLYETHYLENE COMPOSITION SUITABLE FOR CAST FILM [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 22.12.2017 Database last updated on 14.05.2024 | |
Former | Grant of patent is intended Status updated on 06.08.2017 | ||
Former | Examination is in progress Status updated on 20.01.2017 | Most recent event Tooltip | 27.02.2024 | Change: Despatch of interlocutory decision | Applicant(s) | For all designated states Dow Global Technologies LLC 2040 Dow Center Midland, MI 48674 / US | [2015/22] | Inventor(s) | 01 /
BENSASON, Selim Alte Landstrasse 114 AU, ZH, 8804 / CH | 02 /
DEMIRORS, Mehmet 2319 Bending Spring Dr. Pearland, Texas 77584 / US | 03 /
YUN, Xiao B. Number 8 Nanxiangge Street Xuanwu District Beijing 100053 / CN | [2015/25] |
Former [2015/22] | 01 /
BENSASON, Selim Im Ruehrets 4 Wohnung 7 Rueschlikon, 8803 / CH | ||
02 /
DEMIRORS, Mehmet 2319 Bending Spring Dr. Pearland, Texas 77584 / US | |||
03 /
YUN, Xiao B. Number 8 Nanxiangge Street Xuanwu District Beijing 100053 / CN | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [N/P] |
Former [2015/22] | Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | Application number, filing date | 12881172.6 | 20.07.2012 | [2018/04] | WO2012CN78951 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014012250 | Date: | 23.01.2014 | Language: | EN | [2014/04] | Type: | A1 Application with search report | No.: | EP2875073 | Date: | 27.05.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.01.2014 takes the place of the publication of the European patent application. | [2015/22] | Type: | B1 Patent specification | No.: | EP2875073 | Date: | 24.01.2018 | Language: | EN | [2018/04] | Search report(s) | International search report - published on: | CN | 23.01.2014 | (Supplementary) European search report - dispatched on: | EP | 08.01.2016 | Classification | IPC: | C08L23/08, C08F210/16, B29K23/00, B32B27/20, B32B27/32, B29C55/02, B29L9/00, C08J5/18, C08F4/659, C08L23/06 | [2016/04] | CPC: |
C08J5/18 (EP,KR,US);
C08L23/08 (KR);
C08L23/0815 (EP,CN,US);
B29C55/02 (US);
B32B27/205 (EP,US);
B32B27/32 (EP,US);
B29K2023/0625 (EP,US);
B29L2009/00 (EP,US);
B32B2307/31 (EP,US);
B32B2307/542 (EP,US);
B32B2307/558 (EP,US);
B32B2307/5825 (EP,US);
B32B2439/70 (EP,US);
B32B2555/00 (EP,US);
C08F4/659 (EP,US);
C08F4/65908 (EP,US);
C08F4/65912 (EP,US);
C08J2301/00 (EP,US);
C08J2323/08 (EP,US);
C08L2203/16 (EP,CN,KR,US);
C08L2207/066 (KR);
C08L23/06 (EP,US)
(-)
| C-Set: |
C08F210/16, C08F2/001 (US,EP);
C08F210/16, C08F4/64193 (US,EP);
C08F210/16, C08F210/14, C08F2500/03, C08F2500/07, C08F2500/12, C08F2500/17, C08F2500/26 (EP,US)
|
Former IPC [2015/22] | C08L23/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | LINEARES POLYETHYLEN VON NIEDRIGER DICHTE FÜR EINEN GUSSFILM | [2015/22] | English: | A LINEAR LOW DENSITY POLYETHYLENE COMPOSITION SUITABLE FOR CAST FILM | [2015/22] | French: | COMPOSITION DE POLYÉTHYLÈNE LINÉAIRE BASSE DENSITÉ APPROPRIÉE POUR UN FILM MOULÉ | [2015/22] | Entry into regional phase | 28.01.2015 | National basic fee paid | 28.01.2015 | Search fee paid | 28.01.2015 | Designation fee(s) paid | 28.01.2015 | Examination fee paid | Examination procedure | 28.01.2015 | Examination requested [2015/22] | 03.08.2016 | Amendment by applicant (claims and/or description) | 06.09.2016 | Despatch of a communication from the examining division (Time limit: M04) | 16.01.2017 | Reply to a communication from the examining division | 07.08.2017 | Communication of intention to grant the patent | 13.12.2017 | Fee for grant paid | 13.12.2017 | Fee for publishing/printing paid | 13.12.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.09.2016 | Opposition(s) | Opponent(s) | 01
23.10.2018
26.10.2018
ADMISSIBLE Borealis AG Trabrennstrasse 6-8 1020 Vienna / AT Opponent's representative Borealis AG Borealis Polyolefine GmbH IPR-Department St.-Peter-Straße 25 4021 Linz / AT | 02
24.10.2018
31.10.2018
ADMISSIBLE TotalEnergies OneTech Belgium Zone Industrielle C 7181 Seneffe / BE | [2023/06] |
Former [2022/10] | |||
Opponent(s) | 01
23.10.2018
26.10.2018
ADMISSIBLE Borealis AG Trabrennstrasse 6-8 1020 Vienna / AT Opponent's representative Borealis AG Borealis Polyolefine GmbH IPR-Department St.-Peter-Straße 25 4021 Linz / AT | ||
02
24.10.2018
31.10.2018
ADMISSIBLE Total Research & Technology Feluy Zone Industrielle C 7181 Seneffe / BE | |||
Former [2018/52] | |||
Opponent(s) | 01
23.10.2018
26.10.2018
ADMISSIBLE Borealis AG IZD Tower Wagramerstrasse 17-19 1220 Wien / AT Opponent's representative Borealis AG Borealis Polyolefine GmbH IPR-Department St.-Peter-Straße 25 4021 Linz / AT | ||
02
24.10.2018
31.10.2018
ADMISSIBLE Total Research & Technology Feluy Zone Industrielle C 7181 Seneffe / BE | |||
Former [2018/48] | |||
Opponent(s) | 01
23.10.2018
Borealis AG IZD Tower Wagramerstrasse 17-19 1220 Wien / AT | ||
02
24.10.2018
ADMISSIBLE Total Research & Technology Feluy Zone Industrielle C 7181 Seneffe / BE | 13.11.2018 | Invitation to proprietor to file observations on the notice of opposition | 22.03.2019 | Reply of patent proprietor to notice(s) of opposition | 03.02.2020 | Date of oral proceedings | 10.03.2020 | Despatch of minutes of oral proceedings | 03.07.2023 | Despatch of a communication from the opposition division (Time limit: M04) | 02.11.2023 | Reply to a communication from the opposition division | 22.11.2023 | Despatch of a communication from the opposition division (Time limit: M02) | 05.03.2024 | Despatch of interlocutory decision in opposition | Appeal following opposition | 08.05.2020 | Appeal received No. T1178/20 | 20.07.2020 | Statement of grounds filed | 24.03.2023 | Result of appeal procedure: maintenance in amended form | 14.06.2023 | Despatch of the decision of the Board of Appeal | 20.05.2020 | Appeal received No. T1178/20 | 14.07.2020 | Statement of grounds filed | 24.03.2023 | Result of appeal procedure: maintenance in amended form | 14.06.2023 | Despatch of the decision of the Board of Appeal | 24.03.2023 | Date of oral proceedings | Fees paid | Renewal fee | 28.01.2015 | Renewal fee patent year 03 | 10.07.2015 | Renewal fee patent year 04 | 11.07.2016 | Renewal fee patent year 05 | 12.07.2017 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.07.2012 | AL | 24.01.2018 | AT | 24.01.2018 | CY | 24.01.2018 | CZ | 24.01.2018 | DK | 24.01.2018 | EE | 24.01.2018 | FI | 24.01.2018 | HR | 24.01.2018 | IT | 24.01.2018 | LT | 24.01.2018 | LV | 24.01.2018 | MC | 24.01.2018 | MK | 24.01.2018 | NL | 24.01.2018 | PL | 24.01.2018 | PT | 24.01.2018 | RO | 24.01.2018 | RS | 24.01.2018 | SE | 24.01.2018 | SI | 24.01.2018 | SK | 24.01.2018 | SM | 24.01.2018 | TR | 24.01.2018 | BG | 24.04.2018 | NO | 24.04.2018 | GR | 25.04.2018 | IS | 24.05.2018 | GB | 20.07.2018 | IE | 20.07.2018 | LU | 20.07.2018 | MT | 20.07.2018 | BE | 31.07.2018 | CH | 31.07.2018 | LI | 31.07.2018 | [2020/31] |
Former [2020/28] | HU | 20.07.2012 | |
AL | 24.01.2018 | ||
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
PT | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
GB | 20.07.2018 | ||
IE | 20.07.2018 | ||
LU | 20.07.2018 | ||
MT | 20.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2020/16] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
GB | 20.07.2018 | ||
IE | 20.07.2018 | ||
LU | 20.07.2018 | ||
MT | 20.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2020/08] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
GB | 20.07.2018 | ||
IE | 20.07.2018 | ||
LU | 20.07.2018 | ||
MT | 20.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2019/24] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
GB | 20.07.2018 | ||
IE | 20.07.2018 | ||
LU | 20.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2019/21] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
GB | 20.07.2018 | ||
IE | 20.07.2018 | ||
LU | 20.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2019/19] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 20.07.2018 | ||
LU | 20.07.2018 | ||
Former [2019/17] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
LU | 20.07.2018 | ||
Former [2019/15] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2019/13] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/52] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/51] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/50] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/47] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/46] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/40] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/39] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/37] | CY | 24.01.2018 | |
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
Former [2018/36] | CY | 24.01.2018 | |
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
Former [2018/35] | CY | 24.01.2018 | |
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
NO | 24.04.2018 | ||
Former [2018/34] | FI | 24.01.2018 | |
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
NO | 24.04.2018 | Documents cited: | Search | [I]WO2011002868 (DOW GLOBAL TECHNOLOGIES INC [US], et al) [I] 1-12 * claims 1,3,12,13 * * examples 1,2 * * page 1, line 24 - line 25 * * page 6, line 7 - line 10 * * page 9, line 8 - line 10 * * page 34, line 5 - line 10 * * page 36, paragraph 1 * * page 37, paragraph 1 *; | [XI]WO2012061168 (DOW GLOBAL TECHNOLOGIES LLC [US], et al) [X] 1,3 * table 1 * * page 7, line 3 - page 9, line 4; claims 1,6,10,13 *[I] 2,4-12 | International search | [A]WO2011109563 (DOW GLOBAL TECHNOLOGIES LLC [US], et al); | [A]WO2011150193 (DOW GLOBAL TECHNOLOGIES LLC [US], et al); | [A]WO2011159376 (DOW GLOBAL TECHNOLOGIES LLC [US], et al); | [A]WO2012061168 (DOW GLOBAL TECHNOLOGIES LLC [US], et al) | by applicant | - WILLIAMS; WARD, J. POLYM. SCI., POLYM. LETTERS, (1968), vol. 6, page 621 | - B MONRABAL ET AL., MACROMOL. SYMP., (2007), vol. 257, pages 71 - 79 | Opposition | WO2011109563 | WO2011002868 | WO2012061168 | EP2752509 | EP2798003 | EP2864103 | EP2449025 | - "Exceed mPE Exceed 3518 Series Datasheet", ExxonMobil Chemical, (20080000), pages 1 - 2, XP055525220 | - NANTIYA INWONG et al., "Mathematical Modeling of Crystallization Elution Fractination of Ethyle/1-Octene Copolymers", Macromol. Chem. Phys., (20140000), vol. 6, pages 621 - 635, XP055472235 | - B.H. GREGORY, Polyethylene film extrusion a process manual, (20090000), page 96, XP055525228 | - ANDREW J. PEACOK, Handbook Polyethylene, Structure, Properties and Applications, Marcel Dekker, (20000000), pages 17, 461 - 462, XP055526967 | - "Chapter 15: PE based multilayer film structures", BUTLER et al., Multilayer Flexible Packaging, Elsevier Inc, (20090000), pages 205 - 230, ISBN 9780815520214, XP055526970 |