| EP2814129 - Method and means for complex, universal earth fault protection in power high and medium voltage system [Right-click to bookmark this link] | Status | Patent maintained as amended Status updated on 12.07.2024 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 17.09.2021 | ||
| Former | Grant of patent is intended Status updated on 19.07.2021 | ||
| Former | Examination is in progress Status updated on 15.06.2021 | ||
| Former | Grant of patent is intended Status updated on 22.02.2021 | ||
| Former | Examination is in progress Status updated on 20.04.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states ABB Schweiz AG Bruggerstrasse 66 5400 Baden / CH | [2021/42] |
| Former [2016/42] | For all designated states ABB Schweiz AG Brown Boveri Strasse 6 5400 Baden / CH | ||
| Former [2014/51] | For all designated states ABB Technology AG Affolternstrasse 44 8050 Zürich / CH | Inventor(s) | 01 /
Kalina, Emil Strnadova 9 628 00 Brno / CZ | 02 /
Prokop, Vaclav Prizrenicka 1030 664 42 Modrice / CZ | [2014/51] | Representative(s) | Maiwald GmbH Grünstraße 25 40212 Düsseldorf / DE | [2024/33] |
| Former [2021/42] | Maiwald Patent- und Rechtsanwaltsgesellschaft mbH Grünstraße 25 40212 Düsseldorf / DE | ||
| Former [2014/51] | Schmidt, Karl Michael ABB AG GF-IP Oberhausener Strasse 33 40472 Ratingen / DE | Application number, filing date | 13002965.5 | 10.06.2013 | [2014/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2814129 | Date: | 17.12.2014 | Language: | EN | [2014/51] | Type: | B1 Patent specification | No.: | EP2814129 | Date: | 20.10.2021 | Language: | EN | [2021/42] | Type: | B2 New European patent specification | No.: | EP2814129 | Date: | 14.08.2024 | Language: | EN | [2024/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.04.2014 | Classification | IPC: | H02H3/16, H02H3/33 | [2014/51] | CPC: |
H02H3/165 (EP,US);
H02H7/222 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/31] |
| Former [2014/51] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | Verfahren und Vorrichtung für komplexen, universellen Erdungsfehlerschutz in Hoch- und Mittelspannungssystemen | [2014/51] | English: | Method and means for complex, universal earth fault protection in power high and medium voltage system | [2014/51] | French: | Procédé et supports pour protection contre les défauts de terre universels complexes dans un système à haute et moyenne tension | [2014/51] | Examination procedure | 15.06.2015 | Examination requested [2015/31] | 30.06.2015 | Amendment by applicant (claims and/or description) | 18.04.2018 | Despatch of a communication from the examining division (Time limit: M06) | 22.11.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 30.01.2019 | Reply to a communication from the examining division | 04.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 19.02.2020 | Reply to a communication from the examining division | 23.02.2021 | Communication of intention to grant the patent | 15.06.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 20.07.2021 | Communication of intention to grant the patent | 09.09.2021 | Fee for grant paid | 09.09.2021 | Fee for publishing/printing paid | 09.09.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.04.2018 | Opposition(s) | Opponent(s) | 01
07.04.2022
11.04.2022
ADMISSIBLE Siemens Aktiengesellschaft Werner-von-Siemens-Straße 1 80333 München / DE | [2024/05] |
| Former [2023/10] | |||
| Opponent(s) | 01
07.04.2022
11.04.2022
ADMISSIBLE Siemens Aktiengesellschaft Werner-von-Siemens-Straße 1 80333 München / DE Opponent's representative Siemens Patent Attorneys Postfach 22 16 34 80506 München / DE | ||
| Former [2022/19] | |||
| Opponent(s) | 01
07.04.2022
Siemens Aktiengesellschaft Werner-von-Siemens-Straße 1 80333 München / DE | 03.08.2022 | Invitation to proprietor to file observations on the notice of opposition | 16.11.2022 | Reply of patent proprietor to notice(s) of opposition | 06.12.2023 | Legal effect of interlocutory decision in opposition | 06.12.2023 | Date of oral proceedings | 04.01.2024 | Despatch of interlocutory decision in opposition | 04.01.2024 | Despatch of minutes of oral proceedings | 08.05.2024 | Despatch of communication that the patent will be maintained as amended | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 30.01.2019 | Request for further processing filed | 30.01.2019 | Full payment received (date of receipt of payment) Request granted | 07.02.2019 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 15.07.2015 | Request for further processing filed | 15.07.2015 | Full payment received (date of receipt of payment) Request granted | 29.07.2015 | Decision despatched | Fees paid | Renewal fee | 19.06.2015 | Renewal fee patent year 03 | 27.06.2016 | Renewal fee patent year 04 | 27.06.2017 | Renewal fee patent year 05 | 27.06.2018 | Renewal fee patent year 06 | 25.06.2019 | Renewal fee patent year 07 | 24.06.2020 | Renewal fee patent year 08 | 22.06.2021 | Renewal fee patent year 09 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.06.2013 | AL | 20.10.2021 | AT | 20.10.2021 | CY | 20.10.2021 | DK | 20.10.2021 | EE | 20.10.2021 | FI | 20.10.2021 | HR | 20.10.2021 | LT | 20.10.2021 | LV | 20.10.2021 | MC | 20.10.2021 | MK | 20.10.2021 | MT | 20.10.2021 | NL | 20.10.2021 | PL | 20.10.2021 | RO | 20.10.2021 | RS | 20.10.2021 | SE | 20.10.2021 | SI | 20.10.2021 | SK | 20.10.2021 | SM | 20.10.2021 | TR | 20.10.2021 | BG | 20.01.2022 | NO | 20.01.2022 | GR | 21.01.2022 | IS | 20.02.2022 | PT | 21.02.2022 | IE | 10.06.2022 | LU | 10.06.2022 | BE | 30.06.2022 | CH | 30.06.2022 | LI | 30.06.2022 | [2026/04] |
| Former [2024/41] | HU | 10.06.2013 | |
| AL | 20.10.2021 | ||
| AT | 20.10.2021 | ||
| CY | 20.10.2021 | ||
| DK | 20.10.2021 | ||
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| MC | 20.10.2021 | ||
| MK | 20.10.2021 | ||
| MT | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SI | 20.10.2021 | ||
| SK | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| IE | 10.06.2022 | ||
| LU | 10.06.2022 | ||
| BE | 30.06.2022 | ||
| CH | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2024/22] | HU | 10.06.2013 | |
| AL | 20.10.2021 | ||
| AT | 20.10.2021 | ||
| CY | 20.10.2021 | ||
| DK | 20.10.2021 | ||
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| MC | 20.10.2021 | ||
| MK | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SI | 20.10.2021 | ||
| SK | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| IE | 10.06.2022 | ||
| LU | 10.06.2022 | ||
| BE | 30.06.2022 | ||
| CH | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2024/20] | HU | 10.06.2013 | |
| AL | 20.10.2021 | ||
| AT | 20.10.2021 | ||
| CY | 20.10.2021 | ||
| DK | 20.10.2021 | ||
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| MC | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SI | 20.10.2021 | ||
| SK | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| IE | 10.06.2022 | ||
| LU | 10.06.2022 | ||
| BE | 30.06.2022 | ||
| CH | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2024/18] | HU | 10.06.2013 | |
| AL | 20.10.2021 | ||
| AT | 20.10.2021 | ||
| DK | 20.10.2021 | ||
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| MC | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SI | 20.10.2021 | ||
| SK | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| IE | 10.06.2022 | ||
| LU | 10.06.2022 | ||
| BE | 30.06.2022 | ||
| CH | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2023/25] | AL | 20.10.2021 | |
| AT | 20.10.2021 | ||
| DK | 20.10.2021 | ||
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| MC | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SI | 20.10.2021 | ||
| SK | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| IE | 10.06.2022 | ||
| LU | 10.06.2022 | ||
| BE | 30.06.2022 | ||
| CH | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2023/21] | AL | 20.10.2021 | |
| AT | 20.10.2021 | ||
| DK | 20.10.2021 | ||
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| MC | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SI | 20.10.2021 | ||
| SK | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| IE | 10.06.2022 | ||
| LU | 10.06.2022 | ||
| CH | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2023/20] | AL | 20.10.2021 | |
| AT | 20.10.2021 | ||
| DK | 20.10.2021 | ||
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| MC | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SI | 20.10.2021 | ||
| SK | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| IE | 10.06.2022 | ||
| Former [2023/08] | AL | 20.10.2021 | |
| AT | 20.10.2021 | ||
| DK | 20.10.2021 | ||
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| MC | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SI | 20.10.2021 | ||
| SK | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| Former [2023/01] | AL | 20.10.2021 | |
| AT | 20.10.2021 | ||
| DK | 20.10.2021 | ||
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SI | 20.10.2021 | ||
| SK | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| Former [2022/49] | AL | 20.10.2021 | |
| AT | 20.10.2021 | ||
| DK | 20.10.2021 | ||
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SK | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| Former [2022/35] | AT | 20.10.2021 | |
| DK | 20.10.2021 | ||
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SK | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| Former [2022/34] | AT | 20.10.2021 | |
| EE | 20.10.2021 | ||
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RO | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| Former [2022/33] | AT | 20.10.2021 | |
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| SM | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| Former [2022/25] | AT | 20.10.2021 | |
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| NO | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| Former [2022/24] | AT | 20.10.2021 | |
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| NL | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| SE | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| GR | 21.01.2022 | ||
| IS | 20.02.2022 | ||
| PT | 21.02.2022 | ||
| Former [2022/23] | AT | 20.10.2021 | |
| FI | 20.10.2021 | ||
| HR | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| LV | 20.10.2021 | ||
| PL | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| PT | 21.02.2022 | ||
| Former [2022/22] | AT | 20.10.2021 | |
| FI | 20.10.2021 | ||
| LT | 20.10.2021 | ||
| RS | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| Former [2022/21] | AT | 20.10.2021 | |
| RS | 20.10.2021 | ||
| BG | 20.01.2022 | ||
| Former [2022/19] | BG | 20.01.2022 | Documents cited: | Search | [X] WO2004008600 (MC GRAW EDISON CO et al.) * , im Folgenden D2; * | [A] US2001029433 (SCOTT GARY W et al.) * , im Folgenden D3; * | Opposition | US2011043190 | US2011050154 | US2011043190 | US2011050154 | ABB: "Feeder Protection REF601 Application Manual", ABB APPLICATION MANUAL, 27 March 2012 (2012-03-27), pages 1 - 68, XP055914272 * , im Folgenden D1; * | LJUBOMIR A. KOJOVIC ET AL., PRACTICAL ASPECTS OF ROGOWSKI COIL APPLICATIONS TO RELAYING, September 2010 (2010-09-01), XP055112118 * im Folgenden D4; * | DVORAK MILOS: "PPMV Instrument transformers", ABB PRODUCT PRESENTATION, 20 January 2008 (2008-01-20), pages 1 - 80, XP055914266 * im Folgenden D5; * | ABB: "Feeder Protection REF601 Application Manual", ABB APPLICATION MANUAL, 27 March 2012 (2012-03-27), pages 1 - 68, XP055914272 | LJUBOMIR A. KOJOVIC ET AL., PRACTICAL ASPECTS OF ROGOWSKI COIL APPLICATIONS TO RELAYING, September 2010 (2010-09-01) * im Folgenden D4; * | DVORAK MILOS: "PPMV Instrument transformers", ABB PRODUCT PRESENTATION, 20 January 2008 (2008-01-20), pages 1 - 80, XP055914266 * im Folgenden D5; * |