EP2821947 - Method and system to support technical tasks in distributed control systems [Right-click to bookmark this link] | Status | The application has been refused Status updated on 29.01.2018 Database last updated on 03.06.2024 | |
Former | Examination is in progress Status updated on 23.01.2017 | Most recent event Tooltip | 11.05.2018 | Refusal of application | published on 13.06.2018 [2018/24] | Applicant(s) | For all designated states ABB Schweiz AG Brown Boveri Strasse 6 5400 Baden / CH | [2016/44] |
Former [2015/02] | For all designated states ABB Technology AG Affolternstrasse 44 8050 Zürich / CH | Inventor(s) | 01 /
Schulz, Dirk Hauptstr. 128 67149 Meckenheim / DE | 02 /
Drath, Rainer Freiburger Str. 54 68239 Mannheim / DE | [2015/02] | Representative(s) | Marks, Frank, et al ABB AG GF-IP Wallstadter Strasse 59 68526 Ladenburg / DE | [N/P] |
Former [2015/02] | Kock, Ina ABB AG GF-IP Wallstadter Straße 59 68526 Ladenburg / DE | Application number, filing date | 13003340.0 | 02.07.2013 | [2015/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2821947 | Date: | 07.01.2015 | Language: | EN | [2015/02] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.11.2013 | Classification | IPC: | G06Q10/10 | [2015/02] | CPC: |
G06Q10/0633 (EP,US);
G05B19/41865 (CN);
G05B11/01 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | Verfahren und System zur Unterstützung von technischen Aufgaben in verteilten Steuersystemen | [2015/02] | English: | Method and system to support technical tasks in distributed control systems | [2015/02] | French: | Procédé et système pour prendre en charge des tâches techniques dans des systèmes de commande répartis | [2015/02] | Examination procedure | 07.07.2015 | Amendment by applicant (claims and/or description) | 07.07.2015 | Examination requested [2015/34] | 23.09.2016 | Despatch of a communication from the examining division (Time limit: M04) | 20.01.2017 | Reply to a communication from the examining division | 24.01.2018 | Cancellation of oral proceeding that was planned for 08.03.2018 | 30.01.2018 | Despatch of communication that the application is refused, reason: substantive examination [2018/24] | 09.02.2018 | Application refused, date of legal effect [2018/24] | 08.03.2018 | Date of oral proceedings (cancelled) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.09.2016 | Fees paid | Renewal fee | 23.07.2015 | Renewal fee patent year 03 | 22.07.2016 | Renewal fee patent year 04 | 24.07.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [ ] - No relevant documents disclosed |