EP2680319 - Method for manufacturing a solar cell array [Right-click to bookmark this link] | |||
Former [2014/01] | Solar cell assembly, solar panel, and method for manufacturing the same | ||
[2019/15] | Status | No opposition filed within time limit Status updated on 17.07.2020 Database last updated on 28.05.2024 | |
Former | The patent has been granted Status updated on 09.08.2019 | ||
Former | Grant of patent is intended Status updated on 26.03.2019 | ||
Former | Examination is in progress Status updated on 09.12.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states SolAero Technologies Corp. 10420 Research Road SE Albuquerque, NM 87123 / US | [2019/37] |
Former [2015/35] | For all designated states SolAero Technologies Corp. 10420 Research Road SE Albuquerque, NM 87123 / US | ||
Former [2014/01] | For all designated states Emcore Solar Power, Inc. 10420 Research Road SE Albuquerque NM 87123 / US | Inventor(s) | 01 /
Tourino, Cory 7 Blue Jay Way Edgewood, NM 87015 / US | [2014/01] | Representative(s) | adares Patent- und Rechtsanwälte Reininger & Partner GmbB Tauentzienstraße 7 b/c 10789 Berlin / DE | [2019/37] |
Former [2014/01] | Wagner, Karl H. Wagner & Geyer Gewürzmühlstrasse 5 80538 Munich / DE | Application number, filing date | 13020021.5 | 22.05.2013 | [2014/01] | Priority number, date | US201213535570 | 28.06.2012 Original published format: US201213535570 | [2014/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2680319 | Date: | 01.01.2014 | Language: | EN | [2014/01] | Type: | B1 Patent specification | No.: | EP2680319 | Date: | 11.09.2019 | Language: | EN | [2019/37] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 30.09.2013 | Classification | IPC: | H01L31/05, B64G1/44, H01L31/048, H02S30/20, H01L31/041, B64G1/54 | [2019/14] | CPC: |
H01L31/0508 (EP,US);
B64G1/443 (EP,US);
H01L31/02008 (EP,US);
H01L31/041 (US);
H01L31/048 (US);
H01L31/0512 (US);
|
Former IPC [2014/01] | H01L31/045, H01L31/05, B64G1/44 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/37] |
Former [2014/01] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Herstellungsverfahren für eine Solarzellenanordnung | [2019/15] | English: | Method for manufacturing a solar cell array | [2019/15] | French: | Procédé de fabrication d'un ensemble solaire | [2019/15] |
Former [2014/01] | Solarzellenanordnung, Solarpanel, und Herstellungsverfahren dafür | ||
Former [2014/01] | Solar cell assembly, solar panel, and method for manufacturing the same | ||
Former [2014/01] | Ensemble solaire, panneau solaire et son procédé de fabrication | Examination procedure | 01.07.2014 | Amendment by applicant (claims and/or description) | 01.07.2014 | Examination requested [2014/33] | 09.12.2016 | Despatch of a communication from the examining division (Time limit: M06) | 19.06.2017 | Reply to a communication from the examining division | 11.04.2018 | Despatch of a communication from the examining division (Time limit: M06) | 19.10.2018 | Reply to a communication from the examining division | 27.03.2019 | Communication of intention to grant the patent | 29.07.2019 | Fee for grant paid | 29.07.2019 | Fee for publishing/printing paid | 29.07.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.12.2016 | Opposition(s) | 15.06.2020 | No opposition filed within time limit [2020/34] | Fees paid | Renewal fee | 12.05.2015 | Renewal fee patent year 03 | 10.05.2016 | Renewal fee patent year 04 | 10.05.2017 | Renewal fee patent year 05 | 11.05.2018 | Renewal fee patent year 06 | 15.05.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.05.2013 | AL | 11.09.2019 | AT | 11.09.2019 | CY | 11.09.2019 | CZ | 11.09.2019 | DK | 11.09.2019 | EE | 11.09.2019 | ES | 11.09.2019 | FI | 11.09.2019 | HR | 11.09.2019 | LT | 11.09.2019 | LV | 11.09.2019 | MC | 11.09.2019 | MK | 11.09.2019 | MT | 11.09.2019 | PL | 11.09.2019 | RO | 11.09.2019 | RS | 11.09.2019 | SE | 11.09.2019 | SI | 11.09.2019 | SK | 11.09.2019 | SM | 11.09.2019 | TR | 11.09.2019 | BG | 11.12.2019 | NO | 11.12.2019 | GR | 12.12.2019 | IS | 12.01.2020 | PT | 13.01.2020 | IE | 22.05.2020 | LU | 22.05.2020 | CH | 31.05.2020 | LI | 31.05.2020 | [2022/32] |
Former [2022/27] | HU | 22.05.2013 | |
AL | 11.09.2019 | ||
AT | 11.09.2019 | ||
CY | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
MT | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
TR | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
IE | 22.05.2020 | ||
LU | 22.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2022/26] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
TR | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
IE | 22.05.2020 | ||
LU | 22.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/20] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
IE | 22.05.2020 | ||
LU | 22.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/15] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
LU | 22.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/12] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/08] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2020/37] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2020/36] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2020/27] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SK | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
Former [2020/22] | AL | 11.09.2019 | |
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
Former [2020/15] | AL | 11.09.2019 | |
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
Former [2020/11] | ES | 11.09.2019 | |
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
Former [2020/10] | FI | 11.09.2019 | |
LT | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
Former [2020/09] | FI | 11.09.2019 | |
LT | 11.09.2019 | ||
NO | 11.12.2019 | ||
Former [2020/08] | LT | 11.09.2019 | |
NO | 11.12.2019 | Documents cited: | Search | [IY]US3375141 (JULIUS RICHARD F) [I] 1-4,6-12,14,15 * abstract * * column 3, line 8 - column 6, line 20 * * column 7, lines 3-42 * [Y] 5,13; | [Y]JP2003318430 (FUJI ELECTRIC CO LTD) [Y] 5,13 * Abstract; figs. 4, 6,7 and their description *; | [A]US6543725 (MEURER RENE [DE], et al) [A] 1-3,7-9,14,15 * Abstract; paragraphs [0030] , [0 31]; figure 5 * | Examination | US7419377 | GB1328324 | US5180442 | JP2008227085 |