EP2775531 - Method and arrangement for operating photovoltaic system and photovoltaic system [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 09.10.2015 Database last updated on 15.06.2024 | Most recent event Tooltip | 09.10.2015 | Change or deletion - application deemed withdrawn | published on 11.11.2015 [2015/46] | Applicant(s) | For all designated states ABB Oy Strömbergintie 1 00380 Helsinki / FI | [2014/37] | Inventor(s) | 01 /
Puukko, Joonas ABB Oy Hiomotie 13 00380 Helsinki / FI | 02 /
Nousiainen, Lari ABB Oy Hiomotie 13 00380 Helsinki / FI | [2014/37] | Representative(s) | Kolster Oy Ab (Salmisaarenaukio 1) P.O. Box 204 00181 Helsinki / FI | [N/P] |
Former [2014/37] | Kolster Oy Ab Iso Roobertinkatu 23 PO Box 148 00121 Helsinki / FI | Application number, filing date | 13158139.9 | 07.03.2013 | [2014/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2775531 | Date: | 10.09.2014 | Language: | EN | [2014/37] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.07.2013 | Classification | IPC: | H01L31/02 | [2014/37] | CPC: |
H01L31/02021 (EP,US);
H02M3/156 (US);
Y02E10/50 (US);
Y02E10/56 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | Verfahren und Anordnung zum Betrieb eines photovoltaischen Systems und photovoltaisches System | [2014/37] | English: | Method and arrangement for operating photovoltaic system and photovoltaic system | [2014/37] | French: | Procédé et dispositif pour faire fonctionner un système photovoltaïque et système photovoltaïque | [2014/37] | Examination procedure | 10.04.2014 | Amendment by applicant (claims and/or description) | 30.04.2014 | Examination requested [2014/37] | 16.06.2014 | Despatch of a communication from the examining division (Time limit: M04) | 02.10.2014 | Reply to a communication from the examining division | 21.01.2015 | Despatch of a communication from the examining division (Time limit: M04) | 02.06.2015 | Application deemed to be withdrawn, date of legal effect [2015/46] | 29.06.2015 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time [2015/46] | 01.10.2015 | Application deemed to be withdrawn, date of legal effect [2015/45] | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.06.2014 | Fees paid | Renewal fee | 24.03.2015 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [Y]EP2284973 (SMA SOLAR TECHNOLOGY AG [DE]) [Y] 1-16 * paragraphs [0030] , [0038] , [0039]; figures 2,3,7 *; | [Y]EP2437387 (ASTEC INT LTD [CN]) [Y] 1-16 * claims 1-4 * | by applicant | US2012139347 |