blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2642662

EP2642662 - HBAR resonator comprising a structure for amplifying the amplitude of at least one resonance of said resonator and methods for producing said resonator [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.08.2021
Database last updated on 27.07.2024
FormerThe patent has been granted
Status updated on  04.09.2020
FormerGrant of patent is intended
Status updated on  12.07.2020
FormerExamination is in progress
Status updated on  29.09.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
COMMISSARIAT À L'ÉNERGIE ATOMIQUE ET AUX ÉNERGIES ALTERNATIVES
Bâtiment "Le Ponant D"
25, rue Leblanc
75015 Paris / FR
For all designated states
Centre National de la Recherche Scientifique
3, rue Michel-Ange
75016 Paris / FR
[2020/41]
Former [2013/39]For all designated states
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES
Bâtiment "Le Ponant D" 25, rue Leblanc
75015 Paris / FR
For all designated states
Centre National de la Recherche Scientifique
3, rue Michel Ange
75016 Paris / FR
Inventor(s)01 / Reinhardt, Alexandre
4, rue de la Distillerie
38400 Saint Martin d'Heres / FR
02 / Ballandras, Sylvain
9, rue Alexandre Estignard
25000 Besancon / FR
03 / Perruchot, François
75, rue Ampère
38000 Grenoble / FR
 [2013/39]
Representative(s)Atout PI Laplace
Immeuble Up On
25 Boulevard Romain Rolland
CS 40072
75685 Paris Cedex 14 / FR
[N/P]
Former [2020/41]Esselin, Sophie, et al
Marks & Clerk France
Conseils en Propriété Industrielle
Immeuble Visium
22 avenue Aristide Briand
94117 Arcueil Cedex / FR
Former [2013/39]Esselin, Sophie, et al
Marks & Clerk France
Conseils en Propriété Industrielle
Immeuble Visium
22, Avenue Aristide Briand
94117 Arcueil Cedex / FR
Application number, filing date13159872.419.03.2013
[2013/39]
Priority number, dateFR2012005246220.03.2012         Original published format: FR 1252462
[2013/39]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2642662
Date:25.09.2013
Language:FR
[2013/39]
Type: B1 Patent specification 
No.:EP2642662
Date:07.10.2020
Language:FR
[2020/41]
Search report(s)(Supplementary) European search report - dispatched on:EP24.04.2013
ClassificationIPC:H03H9/17, H03H9/02
[2013/39]
CPC:
H03H9/02078 (EP,US); H03H9/17 (US); H03H3/04 (US);
H03H9/172 (EP,US); H03H9/175 (EP); Y10T29/42 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/41]
Former [2013/39]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:HBAR-Resonator, der eine Amplitudenverstärkungsstruktur von mindestens einer Resonanz des entsprechenden Resonators umfasst, und Verfahren zur Herstellung dieses Resonators[2013/39]
English:HBAR resonator comprising a structure for amplifying the amplitude of at least one resonance of said resonator and methods for producing said resonator[2013/39]
French:Résonateur HBAR comportant une structure d'amplification de l'amplitude d'au moins une résonance dudit résonateur et procédés de réalisation de ce résonateur[2013/39]
Examination procedure12.03.2014Amendment by applicant (claims and/or description)
12.03.2014Examination requested  [2014/17]
27.09.2017Despatch of a communication from the examining division (Time limit: M06)
26.03.2018Reply to a communication from the examining division
12.12.2018Despatch of a communication from the examining division (Time limit: M06)
18.06.2019Reply to a communication from the examining division
08.06.2020Cancellation of oral proceeding that was planned for 10.06.2020
10.06.2020Date of oral proceedings (cancelled)
13.07.2020Communication of intention to grant the patent
28.08.2020Fee for grant paid
28.08.2020Fee for publishing/printing paid
28.08.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  27.09.2017
Opposition(s)08.07.2021No opposition filed within time limit [2021/37]
Fees paidRenewal fee
24.02.2015Renewal fee patent year 03
26.02.2016Renewal fee patent year 04
28.02.2017Renewal fee patent year 05
27.02.2018Renewal fee patent year 06
26.02.2019Renewal fee patent year 07
27.02.2020Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.03.2013
AL07.10.2020
AT07.10.2020
CY07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
MK07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
TR07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
IE19.03.2021
LU19.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
[2024/29]
Former [2024/22]HU19.03.2013
AL07.10.2020
AT07.10.2020
CY07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
MK07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
IE19.03.2021
LU19.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/30]HU19.03.2013
AL07.10.2020
AT07.10.2020
CY07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
IE19.03.2021
LU19.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/27]HU19.03.2013
AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
IE19.03.2021
LU19.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/34]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
IE19.03.2021
LU19.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/23]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
IE19.03.2021
LU19.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/10]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
PT08.02.2021
IE19.03.2021
LU19.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/09]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
IE19.03.2021
LU19.03.2021
Former [2022/07]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
IE19.03.2021
Former [2021/49]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/48]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/45]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/37]AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/36]AT07.10.2020
CZ07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/35]AT07.10.2020
CZ07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/34]AT07.10.2020
CZ07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/33]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/32]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/28]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/25]AT07.10.2020
ES07.10.2020
FI07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/24]AT07.10.2020
FI07.10.2020
LV07.10.2020
NL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
PT08.02.2021
Former [2021/23]FI07.10.2020
LV07.10.2020
NL07.10.2020
RS07.10.2020
SE07.10.2020
NO07.01.2021
GR08.01.2021
PT08.02.2021
Former [2021/22]FI07.10.2020
NL07.10.2020
RS07.10.2020
NO07.01.2021
PT08.02.2021
Former [2021/21]FI07.10.2020
NL07.10.2020
PT08.02.2021
Former [2021/20]FI07.10.2020
Documents cited:Search[A]DE102009047807  (SIEMENS AG [DE]) [A] 1-29* paragraph [0059] - paragraph [0060]; figure 3 *;
 [XI]  - PIJOLAT M ET AL, "LiNbO3 Film Bulk Acoustic Resonator", FREQUENCY CONTROL SYMPOSIUM (FCS), 2010 IEEE INTERNATIONAL, IEEE, PISCATAWAY, NJ, USA, (20100601), ISBN 978-1-4244-6399-2, pages 661 - 664, XP031738433 [X] 1,4,5,8,10,11,13,16,18-20,22,23 * the whole document * [I] 2,3,6,7,9,12,14,15,17,21,24-29
 [XI]  - PIJOLAT M ET AL, "High quality factor lithium niobate electrostrictive HBAR resonators", FREQUENCY CONTROL AND THE EUROPEAN FREQUENCY AND TIME FORUM (FCS), 2011 JOINT CONFERENCE OF THE IEEE INTERNATIONAL, IEEE, (20110502), doi:10.1109/FCS.2011.5977743, ISBN 978-1-61284-111-3, pages 1 - 3, XP032009268 [X] 1,4,8,10,11,13,16,18-23 * the whole document * [I] 2,3,5-7,9,12,14,15,17,24-29

DOI:   http://dx.doi.org/10.1109/FCS.2011.5977743
ExaminationUS5864261
 US2006119453
 US2006170519
    - ALIEV G ET AL, "Hypersonic acoustic mirrors and microcavities in porous silicon", APPLIED PHYSICS LETTERS, A I P PUBLISHING LLC, US, (20100322), vol. 96, no. 12, doi:10.1063/1.3367747, ISSN 0003-6951, pages 124101 - 124101, XP012130564

DOI:   http://dx.doi.org/10.1063/1.3367747
by applicantFR1058402
 FR2938136
    - H. ZHANG; W. PANG; H. YU; E.S. KIM, "High-tone bulk acoustic resonators on sapphire, crystal quartz, fused silica and silicon substrates", J. APPL. PHYS., (2006), vol. 99, page 124911, XP012083562
    - H.L. SALVO; M. GOTTLIEB; B.R. MCAVOY, "Shear mode transducers for high-Q bulk microwave resonators", PROCEEDINGS OF THE 41 ST ANNUAL FREQUENCY CONTROL SYMPOSIUM, (1982), pages 388 - 390
    - D. GACHON; E. COURJON; J. MASSON; V. PETRINI; J.Y. RAUCH; S. BALLANDRAS, "LiNb03-LiNb03 high overtone bulk acoustic resonator exhibiting high Q.f product", PROCEEDINGS OF THE 2007 IEEE ULTRASONICS SYMPOSIUM, pages 1417 - 1420
    - K.M. LAKIN; G.R. KLINE; K.T. MCCARRON, "High-Q microwave acoustic resonators and filters", IEEE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES, (1993), vol. 41, no. 2, doi:doi:10.1109/22.260698, pages 2139 - 2146, XP000426128

DOI:   http://dx.doi.org/10.1109/22.260698
    - G.R. KLINE; K.M. LAKIN; K.T. MCCARRON, "Overmoded high-Q resonators for microwave oscillators", PROCEEDINGS OF THE 1993 IEEE INTERNATIONAL FREQUENCY CONTROL SYMPOSIUM, (1993), doi:doi:10.1109/FREQ.1993.367467, page 718, XP010126168

DOI:   http://dx.doi.org/10.1109/FREQ.1993.367467
    - M. PIJOLAT; S. LOUBRIAT; S. QUESTE; D. MERCIER; A. REINHARDT; E. DEFAÿ; C. DEGUET; L. CLAVELIER; H. MORICEAU; M. AÏD, "Large electromechanical coupling factor film bulk acoustic resonator with X-cut LiNb03 layer transfer", APPL. PHYS. LETT., (2009), vol. 95, doi:doi:10.1063/1.3258496, page 182106, XP012126324

DOI:   http://dx.doi.org/10.1063/1.3258496
    - W. PANG; H. ZHANG; J.J. KIM; H. YU; E.S. KIM, "High-Q single mode high-tone bulk acoustic resonator integrated with surface- micromachined FBAR filter", PROCEEDINGS OF THE 2005 MTT-S INTERNATIONAL MICROWAVE SYMPOSIUM, (2005), page 413, XP010844755
    - A. REINHARDT; T. PASTUREAUD; S. BALLANDRAS; V. LAUDE, "Scattering matrix method for modeling acoustic waves in piezoelectric, fluid and metallic multilayers", JOURN. APPL. PHYS., (2003), vol. 94, no. 10, pages 6923 - 6931
    - M. PIJOLAT; D. MERCIER; A. REINHARDT; E. DEFAÿ; C. DEGUET; M. AÏD; J. S. MOULET; B. GHYSELEN; S. BALLANDRAS, "Mode conversion in high overtone bulk acoustic wave resonators", PROCEEDINGS OF THE 2009 INTERNATIONAL FREQUENCY CONTROL SYMPOSIUM, (2009), pages 290 - 294, XP031492385
    - G.N. ALIEV; B. GOLLER; D. KOVALEV; P.A. SNOW, "Hypersonic acoustic mirrors and microcavities in porous silicon", APPLIED PHYSICS LETTERS, (2010), vol. 96, doi:doi:10.1063/1.3367747, page 124101, XP012130564

DOI:   http://dx.doi.org/10.1063/1.3367747
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.