blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2784934

EP2784934 - Electronic biasing circuit for constant transconductance [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.07.2021
Database last updated on 08.10.2024
FormerThe patent has been granted
Status updated on  21.08.2020
FormerGrant of patent is intended
Status updated on  15.04.2020
FormerExamination is in progress
Status updated on  07.03.2020
FormerGrant of patent is intended
Status updated on  23.10.2019
FormerExamination is in progress
Status updated on  18.11.2016
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Dialog Semiconductor B.V.
Het Zuiderkruis 53
5215 MV 's-Hertogenbosch / NL
[2014/40]
Inventor(s)01 / Papamichail, Michail
Het Zuiderkruis 53
5215 MV 's-Hertogenbosch / NL
 [2014/40]
Representative(s)Nederlandsch Octrooibureau
P.O. Box 29720
2502 LS The Hague / NL
[2014/40]
Application number, filing date13160860.625.03.2013
[2014/40]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2784934
Date:01.10.2014
Language:EN
[2014/40]
Type: B1 Patent specification 
No.:EP2784934
Date:23.09.2020
Language:EN
[2020/39]
Search report(s)(Supplementary) European search report - dispatched on:EP12.09.2013
ClassificationIPC:H03F1/30, G05F3/24
[2014/40]
CPC:
H03F1/301 (EP,US); G05F3/24 (EP,US); H03F1/223 (EP,US);
H03F3/16 (US); H03F2200/18 (EP,US); H03F2200/447 (EP,US);
H03F2200/456 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/19]
Former [2014/40]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Elektronische Vorspannungsschaltung für konstante Steilheit[2014/40]
English:Electronic biasing circuit for constant transconductance[2014/40]
French:Circuit de polarisation électronique destiné à transconductance constante[2014/40]
Examination procedure31.03.2015Amendment by applicant (claims and/or description)
31.03.2015Examination requested  [2015/19]
24.09.2015Despatch of a communication from the examining division (Time limit: M06)
01.04.2016Reply to a communication from the examining division
06.07.2016Despatch of a communication from the examining division (Time limit: M04)
16.11.2016Reply to a communication from the examining division
17.02.2017Despatch of a communication from the examining division (Time limit: M06)
05.12.2017Reply to a communication from the examining division
02.03.2018Despatch of a communication from the examining division (Time limit: M06)
11.10.2018Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
21.12.2018Reply to a communication from the examining division
28.03.2019Despatch of a communication from the examining division (Time limit: M04)
06.08.2019Reply to a communication from the examining division
24.10.2019Communication of intention to grant the patent
24.02.2020Fee for grant paid
24.02.2020Fee for publishing/printing paid
24.02.2020Receipt of the translation of the claim(s)
03.03.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
16.04.2020Communication of intention to grant the patent
10.08.2020Fee for grant paid
10.08.2020Fee for publishing/printing paid
10.08.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  24.09.2015
Opposition(s)24.06.2021No opposition filed within time limit [2021/35]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
21.12.2018Request for further processing filed
21.12.2018Full payment received (date of receipt of payment)
Request granted
10.01.2019Decision despatched
The application is deemed to be withdrawn due to failure to reply to the examination report
05.12.2017Request for further processing filed
05.12.2017Full payment received (date of receipt of payment)
Request granted
13.12.2017Decision despatched
Fees paidRenewal fee
15.01.2015Renewal fee patent year 03
12.01.2016Renewal fee patent year 04
10.01.2017Renewal fee patent year 05
31.12.2017Renewal fee patent year 06
27.02.2019Renewal fee patent year 07
13.03.2020Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.03.2013
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
MK23.09.2020
MT23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
TR23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
GB25.03.2021
IE25.03.2021
LU25.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
[2024/41]
Former [2024/29]HU25.03.2013
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
MK23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
TR23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
GB25.03.2021
IE25.03.2021
LU25.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2024/22]HU25.03.2013
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
MK23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
GB25.03.2021
IE25.03.2021
LU25.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2023/30]HU25.03.2013
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
GB25.03.2021
IE25.03.2021
LU25.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2023/27]HU25.03.2013
AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
GB25.03.2021
IE25.03.2021
LU25.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2022/34]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
GB25.03.2021
IE25.03.2021
LU25.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2022/11]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
GB25.03.2021
IE25.03.2021
LU25.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2022/08]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
GB25.03.2021
IE25.03.2021
LU25.03.2021
FR31.03.2021
Former [2022/07]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
IE25.03.2021
Former [2021/48]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/45]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/37]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/36]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/28]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/25]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/24]AT23.09.2020
CZ23.09.2020
EE23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
NL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/23]CZ23.09.2020
EE23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
NL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/22]CZ23.09.2020
EE23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
NL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/21]FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
NL23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/20]FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
NL23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
Former [2021/18]FI23.09.2020
HR23.09.2020
LV23.09.2020
NL23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
Former [2021/10]FI23.09.2020
HR23.09.2020
LV23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
Former [2021/09]FI23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
Former [2021/08]FI23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
Former [2021/07]FI23.09.2020
NO23.12.2020
Documents cited:Search[A]US2007229158  (MOJARRADI MOHAMMAD [US], et al) [A] 1,2,5,6 * paragraph [0053]; figure 4 *;
 [A]US2010237950  (CAO ZHIHENG [US]) [A] 1,2,5,6 * paragraph [0005]; figure 1 *;
 [A]DE102004042354  (AUSTRIAMICROSYSTEMS AG [AT]) [A] 1,2,5,6 * paragraph [0004] - paragraph [0006]; figure 1 *;
 [A]JPS5671313  (MITSUBISHI ELECTRIC CORP) [A] 1-17 * abstract *;
 [A]JP2007148530  (RENESAS TECH CORP) [A] 1-17 * abstract *;
 [A]US2009108941  (OISHI KAZUAKI [JP]) [A] 1-17 * figures 2,4,6 *;
 [A]US6194886  (D AQUINO STEFANO I [US], et al) [A] 1 * the whole document *;
 [A]US6124705  (KWONG PAMELA C [US]) [A] 1 * figure 1 *
 [X]  - teem (Pseudonym), "Current mirror questions", (20091117), EDAboard electronic discussion forum, URL: http://www.edaboard.com/thread162984.html, (20130904), XP002712215 [X] 1,2,5,6 * the whole document *
ExaminationEP0596653
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.