blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2658112

EP2658112 - Methods and Systems for Controlling a Power Converter [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.07.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  24.07.2020
FormerGrant of patent is intended
Status updated on  22.03.2020
FormerRequest for examination was made
Status updated on  10.02.2020
FormerGrant of patent is intended
Status updated on  29.09.2019
FormerRequest for examination was made
Status updated on  02.03.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
General Electric Company
1 River Road
Schenectady, NY 12345 / US
[2020/35]
Former [2013/44]For all designated states
General Electric Company
1 River Road
Schenectady, New York 12345 / US
Inventor(s)01 / Larsen, Einar Vaughn
1 River Road
Schenectady, NY 12345 / US
 [2013/44]
Representative(s)Zimmermann & Partner Patentanwälte mbB
Postfach 330 920
80069 München / DE
[2020/35]
Former [2013/44]Bedford, Grant Richard
GPO Europe
GE International Inc. The Ark
201 Talgarth Road
Hammersmith
London W6 8BJ / GB
Application number, filing date13164778.622.04.2013
[2013/44]
Priority number, dateUS20121345464724.04.2012         Original published format: US201213454647
[2013/44]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2658112
Date:30.10.2013
Language:EN
[2013/44]
Type: A3 Search report 
No.:EP2658112
Date:23.08.2017
Language:EN
[2017/34]
Type: B1 Patent specification 
No.:EP2658112
Date:26.08.2020
Language:EN
[2020/35]
Search report(s)(Supplementary) European search report - dispatched on:EP26.07.2017
ClassificationIPC:H02P9/00, H02P9/10, H02P21/05, F03D7/02
[2017/34]
CPC:
H02P9/00 (EP,BR,US); F03D7/0284 (EP,US); H02J3/24 (BR);
H02P21/05 (EP,US); H02P9/10 (EP,US); H03L7/06 (BR);
Y02E10/72 (EP) (-)
Former IPC [2013/44]H02P9/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/14]
Former [2013/44]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren und Systeme zur Steuerung eines Stromwandlers[2013/44]
English:Methods and Systems for Controlling a Power Converter[2013/44]
French:Procédés et systèmes permettant de commander un convertisseur de puissance[2013/44]
Examination procedure22.04.2013Date on which the examining division has become responsible
19.02.2018Amendment by applicant (claims and/or description)
23.02.2018Examination requested  [2018/14]
30.09.2019Communication of intention to grant the patent
10.02.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
23.03.2020Communication of intention to grant the patent
15.07.2020Fee for grant paid
15.07.2020Fee for publishing/printing paid
15.07.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  30.09.2019
Opposition(s)27.05.2021No opposition filed within time limit [2021/31]
Fees paidRenewal fee
30.04.2015Renewal fee patent year 03
02.05.2016Renewal fee patent year 04
02.05.2017Renewal fee patent year 05
30.04.2018Renewal fee patent year 06
18.04.2019Renewal fee patent year 07
21.04.2020Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.04.2013
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
[2024/29]
Former [2024/22]HU22.04.2013
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2023/30]HU22.04.2013
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2023/29]HU22.04.2013
AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/34]AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/23]AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB22.04.2021
IE22.04.2021
LU22.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/21]AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
PT28.12.2020
GB22.04.2021
IE22.04.2021
LU22.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/10]AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
PT28.12.2020
GB22.04.2021
LU22.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/09]AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB22.04.2021
LU22.04.2021
FR30.04.2021
Former [2022/04]AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
LU22.04.2021
Former [2021/50]AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/36]AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/34]AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/28]AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/25]AL26.08.2020
AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/24]AT26.08.2020
CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/23]CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/22]CZ26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/12]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/10]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/09]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
PT28.12.2020
Former [2021/08]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
PT28.12.2020
Former [2021/07]FI26.08.2020
LT26.08.2020
NO26.11.2020
Documents cited:Search[Y]WO2011121049  (NUOVO PIGNONE SPA [IT], et al) [Y] 1-4,8,10 * column 20, paragraph 2 - column 24, paragraph 1 * * page 7, line 16 - page 8, line 15 * * page 8, paragraph last - page 10, paragraph 1 * * figures 3, 4, 18, 19 *;
 [XY]US2012010759  (LARSEN EINAR VAUGHN [US], et al) [X] 6,7 * paragraphs [0001] , [00 2] , [00 5] - [0007] - [0 31] - [0041] - [0 52] , [0 53] * * figures 1, 2, 3, 4, 5 * [Y] 1-5,8-10;
 [Y]WO2012039034  (TOSHIBA MITSUBISHI ELEC INC [JP], et al) [Y] 5,9 * figures 1, 2 *;
 [Y]  - MARTINEZ C ET AL, "Power system stabilizers in variable speed wind farms", POWER&ENERGY SOCIETY GENERAL MEETING, 2009. PES '09. IEEE, IEEE, PISCATAWAY, NJ, USA, (20090726), ISBN 978-1-4244-4241-6, pages 1 - 7, XP031538578 [Y] 5,9 * page 1 - page 6 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.