EP2708674 - Plastering strip and plaster chamfer [Right-click to bookmark this link] | |||
Former [2014/12] | Plastering strip, final rail and plaster chamfer | ||
[2019/23] | Status | Patent revoked Status updated on 23.09.2022 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 30.08.2019 | ||
Former | Grant of patent is intended Status updated on 21.05.2019 | ||
Former | Examination is in progress Status updated on 06.07.2018 | ||
Former | Request for examination was made Status updated on 19.01.2018 | Most recent event Tooltip | 23.09.2022 | Revocation of patent | published on 26.10.2022 [2022/43] | Applicant(s) | For all designated states Braun, August Ceske Vrbne 2390 37011 Ceske Budejovice / CZ | [2017/43] |
Former [2014/12] | For all designated states Braun, August Quellenstrasse 22 8200 Schaffhausen / CH | Inventor(s) | 01 /
see applicant ... | [2014/12] | Representative(s) | Schmitt-Nilson Schraud Waibel Wohlfrom Patentanwälte Partnerschaft mbB Pelkovenstraße 143 80992 München / DE | [2019/40] |
Former [2014/12] | Klunker . Schmitt-Nilson . Hirsch Patentanwälte Destouchesstrasse 68 80796 München / DE | Application number, filing date | 13165040.0 | 24.04.2013 | [2014/12] | Priority number, date | DE20122007697U | 10.08.2012 Original published format: DE 202012007697 U | [2014/12] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2708674 | Date: | 19.03.2014 | Language: | DE | [2014/12] | Type: | A3 Search report | No.: | EP2708674 | Date: | 23.08.2017 | Language: | DE | [2017/34] | Type: | B1 Patent specification | No.: | EP2708674 | Date: | 02.10.2019 | Language: | DE | [2019/40] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.07.2017 | Classification | IPC: | E04F13/06, E06B1/62 | [2014/12] | CPC: |
E04F13/068 (EP);
E04F13/06 (EP);
E06B1/62 (EP);
E04F2013/063 (EP);
E04F2013/065 (EP);
E06B2001/624 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/08] |
Former [2014/12] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Anputzleiste und Putz-Eckleiste | [2019/23] | English: | Plastering strip and plaster chamfer | [2019/23] | French: | Bande de crépissage et baguette d'angle pour enduit | [2019/23] |
Former [2014/12] | Anputzleiste, Abschlussschiene und Putz-Eckleiste | ||
Former [2014/12] | Plastering strip, final rail and plaster chamfer | ||
Former [2014/12] | Bande de crépissage, rail de terminaison et baguette d'angle pour enduit | Examination procedure | 24.04.2013 | Date on which the examining division has become responsible | 09.01.2018 | Amendment by applicant (claims and/or description) | 09.01.2018 | Examination requested [2018/08] | 05.07.2018 | Despatch of a communication from the examining division (Time limit: M06) | 14.01.2019 | Reply to a communication from the examining division | 22.05.2019 | Communication of intention to grant the patent | 22.08.2019 | Fee for grant paid | 22.08.2019 | Fee for publishing/printing paid | 22.08.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.07.2018 | Opposition(s) | Opponent(s) | 01
29.06.2020
01.07.2020
ADMISSIBLE Protektorwerk Florenz Maisch GmbH & Co. KG Viktoriastrasse 58 76571 Gaggenau / DE Opponent's representative Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Martin-Greif-Strasse 1 80336 München / DE | [2020/32] | 14.07.2020 | Invitation to proprietor to file observations on the notice of opposition | 23.11.2020 | Reply of patent proprietor to notice(s) of opposition | 08.02.2022 | Date of oral proceedings | 13.06.2022 | Despatch of minutes of oral proceedings | 13.06.2022 | Despatch of communication that the patent will be revoked | 22.09.2022 | Legal effect of revocation of patent [2022/43] | Fees paid | Renewal fee | 28.04.2015 | Renewal fee patent year 03 | 29.03.2016 | Renewal fee patent year 04 | 31.03.2017 | Renewal fee patent year 05 | 25.04.2018 | Renewal fee patent year 06 | 18.04.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 02.10.2019 | CY | 02.10.2019 | DK | 02.10.2019 | EE | 02.10.2019 | ES | 02.10.2019 | FI | 02.10.2019 | HR | 02.10.2019 | LV | 02.10.2019 | MC | 02.10.2019 | MK | 02.10.2019 | MT | 02.10.2019 | NL | 02.10.2019 | RO | 02.10.2019 | RS | 02.10.2019 | SE | 02.10.2019 | SI | 02.10.2019 | SK | 02.10.2019 | SM | 02.10.2019 | TR | 02.10.2019 | BG | 02.01.2020 | NO | 02.01.2020 | GR | 03.01.2020 | IS | 02.02.2020 | PT | 03.02.2020 | IE | 24.04.2020 | LU | 24.04.2020 | BE | 30.04.2020 | [2022/32] |
Former [2022/27] | AL | 02.10.2019 | |
CY | 02.10.2019 | ||
DK | 02.10.2019 | ||
EE | 02.10.2019 | ||
ES | 02.10.2019 | ||
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
MC | 02.10.2019 | ||
MT | 02.10.2019 | ||
NL | 02.10.2019 | ||
RO | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
SI | 02.10.2019 | ||
SK | 02.10.2019 | ||
SM | 02.10.2019 | ||
TR | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
IS | 02.02.2020 | ||
PT | 03.02.2020 | ||
IE | 24.04.2020 | ||
LU | 24.04.2020 | ||
BE | 30.04.2020 | ||
Former [2022/26] | AL | 02.10.2019 | |
DK | 02.10.2019 | ||
EE | 02.10.2019 | ||
ES | 02.10.2019 | ||
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
MC | 02.10.2019 | ||
NL | 02.10.2019 | ||
RO | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
SI | 02.10.2019 | ||
SK | 02.10.2019 | ||
SM | 02.10.2019 | ||
TR | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
IS | 02.02.2020 | ||
PT | 03.02.2020 | ||
IE | 24.04.2020 | ||
LU | 24.04.2020 | ||
BE | 30.04.2020 | ||
Former [2021/20] | AL | 02.10.2019 | |
DK | 02.10.2019 | ||
EE | 02.10.2019 | ||
ES | 02.10.2019 | ||
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
MC | 02.10.2019 | ||
NL | 02.10.2019 | ||
RO | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
SI | 02.10.2019 | ||
SK | 02.10.2019 | ||
SM | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
IS | 02.02.2020 | ||
PT | 03.02.2020 | ||
IE | 24.04.2020 | ||
LU | 24.04.2020 | ||
BE | 30.04.2020 | ||
Former [2021/12] | AL | 02.10.2019 | |
DK | 02.10.2019 | ||
EE | 02.10.2019 | ||
ES | 02.10.2019 | ||
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
MC | 02.10.2019 | ||
NL | 02.10.2019 | ||
RO | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
SI | 02.10.2019 | ||
SK | 02.10.2019 | ||
SM | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
IS | 02.02.2020 | ||
PT | 03.02.2020 | ||
LU | 24.04.2020 | ||
BE | 30.04.2020 | ||
Former [2021/08] | AL | 02.10.2019 | |
DK | 02.10.2019 | ||
EE | 02.10.2019 | ||
ES | 02.10.2019 | ||
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
MC | 02.10.2019 | ||
NL | 02.10.2019 | ||
RO | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
SI | 02.10.2019 | ||
SK | 02.10.2019 | ||
SM | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
IS | 02.02.2020 | ||
PT | 03.02.2020 | ||
LU | 24.04.2020 | ||
Former [2020/52] | AL | 02.10.2019 | |
DK | 02.10.2019 | ||
EE | 02.10.2019 | ||
ES | 02.10.2019 | ||
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
MC | 02.10.2019 | ||
NL | 02.10.2019 | ||
RO | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
SI | 02.10.2019 | ||
SK | 02.10.2019 | ||
SM | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
IS | 02.02.2020 | ||
PT | 03.02.2020 | ||
Former [2020/51] | AL | 02.10.2019 | |
DK | 02.10.2019 | ||
EE | 02.10.2019 | ||
ES | 02.10.2019 | ||
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
NL | 02.10.2019 | ||
RO | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
SI | 02.10.2019 | ||
SK | 02.10.2019 | ||
SM | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
IS | 02.02.2020 | ||
PT | 03.02.2020 | ||
Former [2020/37] | AL | 02.10.2019 | |
DK | 02.10.2019 | ||
EE | 02.10.2019 | ||
ES | 02.10.2019 | ||
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
NL | 02.10.2019 | ||
RO | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
SK | 02.10.2019 | ||
SM | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
IS | 02.02.2020 | ||
PT | 03.02.2020 | ||
Former [2020/36] | AL | 02.10.2019 | |
DK | 02.10.2019 | ||
EE | 02.10.2019 | ||
ES | 02.10.2019 | ||
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
NL | 02.10.2019 | ||
RO | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
IS | 02.02.2020 | ||
PT | 03.02.2020 | ||
Former [2020/35] | AL | 02.10.2019 | |
ES | 02.10.2019 | ||
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
NL | 02.10.2019 | ||
RO | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
PT | 03.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/32] | AL | 02.10.2019 | |
ES | 02.10.2019 | ||
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
NL | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
PT | 03.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/26] | ES | 02.10.2019 | |
FI | 02.10.2019 | ||
HR | 02.10.2019 | ||
LV | 02.10.2019 | ||
NL | 02.10.2019 | ||
RS | 02.10.2019 | ||
SE | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
PT | 03.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/24] | ES | 02.10.2019 | |
FI | 02.10.2019 | ||
LV | 02.10.2019 | ||
NL | 02.10.2019 | ||
SE | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
PT | 03.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | ES | 02.10.2019 | |
FI | 02.10.2019 | ||
LV | 02.10.2019 | ||
NL | 02.10.2019 | ||
SE | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
GR | 03.01.2020 | ||
PT | 03.02.2020 | ||
Former [2020/22] | FI | 02.10.2019 | |
NL | 02.10.2019 | ||
SE | 02.10.2019 | ||
BG | 02.01.2020 | ||
NO | 02.01.2020 | ||
PT | 03.02.2020 | ||
Former [2020/21] | NL | 02.10.2019 | |
NO | 02.01.2020 | ||
Former [2020/20] | NL | 02.10.2019 | Documents cited: | Search | [XY]EP1873325 (UNDER COVER [BE]) [X] 10-13 * paragraphs [0032] - [0035]; figures 1-2 * [Y] 1-9,14,15; | [YDA]EP0875641 (BRAUN AUGUST [CH]) [YD] 1-5 * column 5, lines 11-39; figure 2 * [A] 14,15; | [YDA]DE19539526 (BRAUN AUGUST [CH]) [YD] 6-9 * the whole document * [A] 14,15; | [YD]DE10038279 (BRAUN AUGUST [CH]) [YD] 10-13 * column 2, line 68 - column 3, line 20; figure 1 *; | [Y]EP1992776 (ZAHNER ROMAN [DE]) [Y] 10-13 * paragraph [0037]; figure 13 * | [YP] - © Sachverständigenbüro Holzmann-Bauberatung, "Bauplatten & Terrassen aus Reis", (20130527), Sachverständigenbüro Holzmann-Bauberatung Blog, URL: http://www.baubegriffe.com/Bausachverstandiger_Holzmann-Bauberatung/Blog/Eintrage/2013/5/27_Reisspelzen_ersetzen_Holzfasern.html, (20170706), XP002771797 [YP] 14,15 * the whole document * | Examination | EP1669514 | by applicant | EP0875641 | DE19539526 | DE10038279 | Opposition | DE102010044680 | DE102010044679 | WO2007131695 | DE102008036656 | DE19605467 | EP1022406 | DE19718450 | DE10038279 | US6341458 | DE202010017534U | EP0586213 |