EP2621175 - Methods and devices for context modeling to enable modular processing [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.10.2020 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 22.11.2019 | ||
Former | Grant of patent is intended Status updated on 15.11.2019 | ||
Former | Examination is in progress Status updated on 04.11.2019 | ||
Former | Grant of patent is intended Status updated on 04.07.2019 | ||
Former | Examination is in progress Status updated on 26.06.2019 | ||
Former | Grant of patent is intended Status updated on 13.02.2019 | ||
Former | Examination is in progress Status updated on 24.02.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states BlackBerry Limited 2200 University Avenue East Waterloo, ON N2K 0A7 / CA | [2019/52] |
Former [2013/48] | For all designated states BlackBerry Limited 2200 University Avenue East Waterloo, ON N2K 0A7 / CA | ||
Former [2013/36] | For all designated states BlackBerry Limited 295 Phillip Street Waterloo ON N2L 3W8 / CA | ||
Former [2013/31] | For all designated states Research In Motion Limited 295 Phillip Street Waterloo, ON N2L 3W8 / CA | Inventor(s) | 01 /
Nguyen, Nguyen c/o Research In Motion Limited 295 Phillip Street Extension 78776 Waterloo, Ontario N2L 3W8 / CA | 02 /
Ji, Tianying c/o Research In Motion Limited 295 Phillip Street Extension 78765 Waterloo, Ontario N2L 3W8 / CA | 03 /
He, Dake c/o Research In Motion Limited 295 Phillip Street Extension 78760 Waterloo, Ontario N2L 3W8 / CA | [2013/31] | Representative(s) | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Strasse 29 80336 München / DE | [2019/52] |
Former [2013/31] | Patel, Binesh Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham West Midlands B16 8QQ / GB | Application number, filing date | 13165646.4 | 20.01.2012 | [2013/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2621175 | Date: | 31.07.2013 | Language: | EN | [2013/31] | Type: | A3 Search report | No.: | EP2621175 | Date: | 12.02.2014 | Language: | EN | [2014/07] | Type: | A9 Corrected patent application | No.: | EP2621175 | Date: | 05.03.2014 | [2014/10] | Type: | B1 Patent specification | No.: | EP2621175 | Date: | 25.12.2019 | Language: | EN | [2019/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.01.2014 | Classification | IPC: | H04N19/61, H04N19/91, H04N19/18 | [2019/11] | CPC: |
H04N19/18 (EP);
H04N19/61 (EP);
H04N19/91 (EP)
|
Former IPC [2013/31] | H04N7/26, H04N7/50 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/31] | Title | German: | Verfahren und Vorrichtungen zur Kontextmodellierung zur Ermöglichung einer modularen Verarbeitung | [2013/31] | English: | Methods and devices for context modeling to enable modular processing | [2013/31] | French: | Procédés et dispositifs de modelage de contexte pour permettre un traitement modulaire | [2013/31] | Examination procedure | 26.04.2013 | Examination requested [2013/31] | 12.08.2014 | Amendment by applicant (claims and/or description) | 27.02.2017 | Despatch of a communication from the examining division (Time limit: M04) | 27.06.2017 | Reply to a communication from the examining division | 14.02.2019 | Communication of intention to grant the patent | 14.06.2019 | Fee for grant paid | 14.06.2019 | Fee for publishing/printing paid | 14.06.2019 | Receipt of the translation of the claim(s) | 19.06.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 05.07.2019 | Communication of intention to grant the patent | 30.10.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 14.11.2019 | Information about intention to grant a patent | 14.11.2019 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP12151980.5 / EP2618573 | Divisional application(s) | EP19207711.3 / EP3691269 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20120151980) is 09.09.2013 | Opposition(s) | 28.09.2020 | No opposition filed within time limit [2020/49] | Fees paid | Renewal fee | 21.01.2014 | Renewal fee patent year 03 | 27.01.2015 | Renewal fee patent year 04 | 27.01.2016 | Renewal fee patent year 05 | 27.01.2017 | Renewal fee patent year 06 | 29.01.2018 | Renewal fee patent year 07 | 28.01.2019 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.01.2012 | AL | 25.12.2019 | AT | 25.12.2019 | CY | 25.12.2019 | CZ | 25.12.2019 | DK | 25.12.2019 | EE | 25.12.2019 | ES | 25.12.2019 | FI | 25.12.2019 | HR | 25.12.2019 | IT | 25.12.2019 | LT | 25.12.2019 | LV | 25.12.2019 | MC | 25.12.2019 | MK | 25.12.2019 | MT | 25.12.2019 | PL | 25.12.2019 | RO | 25.12.2019 | RS | 25.12.2019 | SE | 25.12.2019 | SI | 25.12.2019 | SK | 25.12.2019 | SM | 25.12.2019 | TR | 25.12.2019 | IE | 20.01.2020 | LU | 20.01.2020 | BE | 31.01.2020 | CH | 31.01.2020 | LI | 31.01.2020 | BG | 25.03.2020 | NO | 25.03.2020 | GR | 26.03.2020 | IS | 25.04.2020 | PT | 20.05.2020 | [2022/32] |
Former [2022/27] | HU | 20.01.2012 | |
AL | 25.12.2019 | ||
AT | 25.12.2019 | ||
CY | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
IT | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
MT | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
TR | 25.12.2019 | ||
IE | 20.01.2020 | ||
LU | 20.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2022/26] | AL | 25.12.2019 | |
AT | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
IT | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
TR | 25.12.2019 | ||
IE | 20.01.2020 | ||
LU | 20.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2021/10] | AL | 25.12.2019 | |
AT | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
IT | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
IE | 20.01.2020 | ||
LU | 20.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2021/08] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
IE | 20.01.2020 | ||
LU | 20.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/51] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
LU | 20.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/47] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
LU | 20.01.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/46] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
LU | 20.01.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/45] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/40] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/37] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
PT | 20.05.2020 | ||
Former [2020/36] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
PT | 20.05.2020 | ||
Former [2020/35] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/32] | AL | 25.12.2019 | |
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/25] | FI | 25.12.2019 | |
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/23] | FI | 25.12.2019 | |
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/22] | FI | 25.12.2019 | |
LT | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
Former [2020/21] | NO | 25.03.2020 | Documents cited: | Search | [A]WO2011128303 (FRAUNHOFER GES FORSCHUNG [DE], et al) [A] 1-6,8,9,12,13 * page 21 - page 27; figures 9-11 *; | [Y] - BROSS B ET AL, "High Efficiency Video Coding (HEVC) text specification Working Draft 5", 7. JCT-VC MEETING; 98. MPEG MEETING; GENEVA; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ), (20111219), no. JCTVC-G1103, XP030111032 [Y] 1-6,8,9,12,13 * abstract * * page 1 * * section 9.2.3.1.1.4 * | [Y] - NGUYEN N ET AL, "Multi-level Significant Maps for Large Transform Units", 7. JCT-VC MEETING; 98. MPEG MEETING; GENEVA; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ), (20111109), no. JCTVC-G644, XP030110628 [Y] 1-6,8,9,12,13 * abstract * * sections 1 and 4 * | [A] - KANG J ET AL, "Parallelizable context for significance coding of large transform blocks", 7. JCT-VC MEETING; 98. MPEG MEETING; GENEVA; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ), (20111108), no. JCTVC-G586, XP030110570 [A] 1-6,8,9,12,13 * abstract * |