blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2663030

EP2663030 - Redundant multistate signaling [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.11.2018
Database last updated on 13.07.2024
FormerThe patent has been granted
Status updated on  24.11.2017
FormerGrant of patent is intended
Status updated on  17.07.2017
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Tesla, Inc.
3500 Deer Creek Road
Palo Alto, CA 94304 / US
[2017/52]
Former [2013/46]For all designated states
Tesla Motors, Inc.
3500 Deer Creek Road
Palo Alto, CA 94304 / US
Inventor(s)01 / Martin, Nathaniel Brian
441 Linden AVE
San Bruno, CA California 94066 / US
02 / Dimen, Ian Casimir
3274 26th ST
San Francisco, CA California 94110 / US
03 / Crowder, Samuel Douglas
169 Charles AVE
Sunnyvale, CA California 94086 / US
 [2013/46]
Representative(s)Liesegang, Eva, et al
Boehmert & Boehmert
Anwaltspartnerschaft mbB
Pettenkoferstrasse 22
80336 München / DE
[2017/52]
Former [2013/46]Eisenführ, Speiser & Partner
Postfach 31 02 60
80102 München / DE
Application number, filing date13166307.202.05.2013
[2013/46]
Priority number, dateUS201261643794P07.05.2012         Original published format: US 201261643794 P
[2013/46]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2663030
Date:13.11.2013
Language:EN
[2013/46]
Type: B1 Patent specification 
No.:EP2663030
Date:27.12.2017
Language:EN
[2017/52]
Search report(s)(Supplementary) European search report - dispatched on:EP27.09.2013
ClassificationIPC:H04L12/423, B60R16/023, H01M10/42, H04L12/42
[2013/46]
CPC:
B60L3/0023 (EP,US); B60L3/0092 (EP,US); B60L3/04 (EP,US);
B60R16/023 (EP,US); G01R31/006 (US); G01R31/28 (US);
G01R31/54 (EP,US); G01R31/58 (EP); G01R31/59 (US);
G06F1/3203 (EP,US); G06F13/4247 (EP,US); H04L12/12 (EP,US);
H04L12/40039 (EP,US); H04L12/40052 (EP,US); H04L12/437 (EP,US);
B60L2270/145 (EP,US); H01M2010/4271 (EP,US); H01M2010/4278 (EP,US);
H01M2220/20 (EP,US); H04L69/329 (EP,US); Y02D10/00 (EP,US);
Y02D30/50 (EP,US); Y02E60/10 (EP); Y02T90/16 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/52]
Former [2013/46]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Redundante Signalisierung mit mehreren Schaltstufen[2013/46]
English:Redundant multistate signaling[2013/46]
French:Signalisation redondante à plusieurs états[2013/46]
Examination procedure02.05.2014Amendment by applicant (claims and/or description)
13.05.2014Examination requested  [2014/26]
18.07.2017Communication of intention to grant the patent
17.11.2017Fee for grant paid
17.11.2017Fee for publishing/printing paid
17.11.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  18.07.2017
Opposition(s)28.09.2018No opposition filed within time limit [2018/49]
Fees paidRenewal fee
26.05.2015Renewal fee patent year 03
04.03.2016Renewal fee patent year 04
09.05.2017Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.05.2013
AL27.12.2017
AT27.12.2017
CY27.12.2017
CZ27.12.2017
DK27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
MK27.12.2017
NL27.12.2017
PL27.12.2017
PT27.12.2017
RO27.12.2017
RS27.12.2017
SE27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
TR27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
IE02.05.2018
LU02.05.2018
MT02.05.2018
CH31.05.2018
LI31.05.2018
[2020/34]
Former [2020/31]HU02.05.2013
AT27.12.2017
CY27.12.2017
CZ27.12.2017
DK27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
MK27.12.2017
NL27.12.2017
PL27.12.2017
PT27.12.2017
RO27.12.2017
RS27.12.2017
SE27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
TR27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
IE02.05.2018
LU02.05.2018
MT02.05.2018
CH31.05.2018
LI31.05.2018
Former [2020/29]HU02.05.2013
AT27.12.2017
CY27.12.2017
CZ27.12.2017
DK27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
NL27.12.2017
PL27.12.2017
PT27.12.2017
RO27.12.2017
RS27.12.2017
SE27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
TR27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
IE02.05.2018
LU02.05.2018
MT02.05.2018
CH31.05.2018
LI31.05.2018
Former [2020/27]HU02.05.2013
AT27.12.2017
CY27.12.2017
CZ27.12.2017
DK27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
NL27.12.2017
PL27.12.2017
PT27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
TR27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
IE02.05.2018
LU02.05.2018
MT02.05.2018
CH31.05.2018
LI31.05.2018
Former [2020/16]AT27.12.2017
CY27.12.2017
CZ27.12.2017
DK27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
TR27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
IE02.05.2018
LU02.05.2018
MT02.05.2018
CH31.05.2018
LI31.05.2018
Former [2020/08]AT27.12.2017
CY27.12.2017
CZ27.12.2017
DK27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
IE02.05.2018
LU02.05.2018
MT02.05.2018
CH31.05.2018
LI31.05.2018
Former [2019/19]AT27.12.2017
CY27.12.2017
CZ27.12.2017
DK27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
IE02.05.2018
LU02.05.2018
CH31.05.2018
LI31.05.2018
Former [2019/17]AT27.12.2017
CY27.12.2017
CZ27.12.2017
DK27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
LU02.05.2018
CH31.05.2018
LI31.05.2018
Former [2019/12]AT27.12.2017
CY27.12.2017
CZ27.12.2017
DK27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
CH31.05.2018
LI31.05.2018
Former [2019/06]AT27.12.2017
CY27.12.2017
CZ27.12.2017
DK27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2018/51]AT27.12.2017
CY27.12.2017
CZ27.12.2017
DK27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2018/40]AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2018/39]AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
NL27.12.2017
PL27.12.2017
RS27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2018/38]AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
LT27.12.2017
LV27.12.2017
NL27.12.2017
PL27.12.2017
RS27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2018/37]CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
LT27.12.2017
LV27.12.2017
NL27.12.2017
PL27.12.2017
RS27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
Former [2018/34]FI27.12.2017
HR27.12.2017
LT27.12.2017
LV27.12.2017
NL27.12.2017
RS27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
Former [2018/25]FI27.12.2017
HR27.12.2017
LT27.12.2017
LV27.12.2017
RS27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
Former [2018/22]FI27.12.2017
LT27.12.2017
NO27.03.2018
Documents cited:Search[A]US4937811  (HARRIS JOHN [US]);
 [A]US2006136604  (SCHULTZE STEPHAN [DE], et al);
 [A]US2008140892  (FONG LAMBERT [US], et al);
 [A]US2012013201  (PARISEAU DAVID KEVIN [US], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.