blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2664969

EP2664969 - Method for resolving a control task in a process plant [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.08.2020
Database last updated on 29.07.2024
FormerThe patent has been granted
Status updated on  13.09.2019
FormerGrant of patent is intended
Status updated on  23.04.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Z & J Technologies GmbH
Bertramsweg 6
52355 Düren / DE
[2016/29]
Former [2013/47]For all designated states
Z & J Technologies GmbH
Bahnstrasse 52
52355 Düren / DE
Inventor(s)01 / Knödler, Marco
Lauscherstrasse 23
52353 Düren / DE
 [2013/47]
Representative(s)Popp, Eugen
Meissner Bolte Patentanwälte
Rechtsanwälte Partnerschaft mbB
Postfach 86 06 24
81633 München / DE
[2019/42]
Former [2013/47]Popp, Eugen
Meissner, Bolte & Partner GbR Postfach 86 06 24
81633 München / DE
Application number, filing date13166814.707.05.2013
[2013/47]
Priority number, dateDE20121010421615.05.2012         Original published format: DE102012104216
[2013/47]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2664969
Date:20.11.2013
Language:DE
[2013/47]
Type: A3 Search report 
No.:EP2664969
Date:16.09.2015
Language:DE
[2015/38]
Type: B1 Patent specification 
No.:EP2664969
Date:16.10.2019
Language:DE
[2019/42]
Search report(s)(Supplementary) European search report - dispatched on:EP19.08.2015
ClassificationIPC:G05B13/02, G05B17/02, G05B13/04, G05D7/06, B01J19/24, B01J19/00
[2019/12]
CPC:
G05B13/041 (EP,US); G05D7/0617 (US); B01J19/0006 (EP,US);
B01J19/24 (EP,US); B01J19/2415 (EP,US); G05B17/02 (EP,US);
B01J2219/00058 (EP,US); B01J2219/00123 (EP,US); B01J2219/00162 (EP,US);
B01J2219/00164 (EP,US); B01J2219/00202 (EP,US); B01J2219/00218 (EP,US);
B01J2219/00225 (EP,US); B01J2219/00231 (EP,US); B01J2219/00243 (EP,US);
B01J2219/00247 (EP,US) (-)
Former IPC [2015/38]G05B13/02, G05B17/02
Former IPC [2013/47]G05B13/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/14]
Former [2013/47]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren zur Lösung einer Steuerungsaufgabe in einer Prozessanlage[2013/47]
English:Method for resolving a control task in a process plant[2013/47]
French:Procédé de résolution d'une tâche de commande dans une installation de processus[2013/47]
Examination procedure24.02.2016Amendment by applicant (claims and/or description)
24.02.2016Examination requested  [2016/14]
24.04.2019Communication of intention to grant the patent
04.09.2019Fee for grant paid
04.09.2019Fee for publishing/printing paid
04.09.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  24.04.2019
Opposition(s)17.07.2020No opposition filed within time limit [2020/39]
Fees paidRenewal fee
28.05.2015Renewal fee patent year 03
30.05.2016Renewal fee patent year 04
30.05.2017Renewal fee patent year 05
30.05.2018Renewal fee patent year 06
29.05.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MK16.10.2019
MT16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IS16.02.2020
PT17.02.2020
IE07.05.2020
CH31.05.2020
LI31.05.2020
[2022/32]
Former [2022/27]AL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MT16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IS16.02.2020
PT17.02.2020
IE07.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/20]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IS16.02.2020
PT17.02.2020
IE07.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/12]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IS16.02.2020
PT17.02.2020
CH31.05.2020
LI31.05.2020
Former [2021/08]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
LT16.10.2019
LV16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IS16.02.2020
PT17.02.2020
CH31.05.2020
LI31.05.2020
Former [2020/51]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
LT16.10.2019
LV16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IS16.02.2020
PT17.02.2020
Former [2020/37]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
LT16.10.2019
LV16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
IS16.02.2020
PT17.02.2020
Former [2020/36]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
LT16.10.2019
LV16.10.2019
SE16.10.2019
IS16.02.2020
PT17.02.2020
Former [2020/35]AL16.10.2019
CZ16.10.2019
LT16.10.2019
LV16.10.2019
SE16.10.2019
PT17.02.2020
IS24.02.2020
Former [2020/32]AL16.10.2019
LT16.10.2019
LV16.10.2019
SE16.10.2019
PT17.02.2020
IS24.02.2020
Former [2020/24]LT16.10.2019
LV16.10.2019
SE16.10.2019
PT17.02.2020
IS24.02.2020
Former [2020/23]LT16.10.2019
LV16.10.2019
SE16.10.2019
PT17.02.2020
Former [2020/22]LT16.10.2019
SE16.10.2019
PT17.02.2020
Documents cited:Search[A]WO02086327  (LINJAMA MATTI [FI]) [A] 1-10* page 17, paragraph l - page 21, column 2 *;
 [A]US2005091021  (GUPTA ANURAG [US], et al) [A] 1-10 * paragraph [0025] - paragraph [0105]; figures 1-12B *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.