EP2664834 - Coupling assembly and corresponding assembly [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.09.2015 Database last updated on 15.06.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states STAUBLI FAVERGES Place Robert Stäubli 74210 FAVERGES / FR | [2014/30] |
Former [2013/47] | For all designated states STÄUBLI FAVERGES Place Robert Stäubli 74210 Faverges / FR | Inventor(s) | 01 /
Tiberghien, Alain-Christophe 111, Chemin du Lanfonnet 74320 Sevrier / FR | 02 /
Durieux, Christophe 56, Chemin des Maures 73200 Gilly Sur Isere / FR | 03 /
Bahno, Igor 106 Chemin des Acacias 73400 Ugine / FR | [2013/51] | Representative(s) | Myon, Gérard Jean-Pierre, et al Cabinet Lavoix 62, Rue de Bonnel 69003 Lyon / FR | [N/P] |
Former [2013/47] | Myon, Gérard Jean-Pierre, et al Cabinet Lavoix 62, rue de Bonnel 69003 Lyon / FR | Application number, filing date | 13167775.9 | 15.05.2013 | [2013/47] | Priority number, date | FR20120054537 | 16.05.2012 Original published format: FR 1254537 | [2013/47] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP2664834 | Date: | 20.11.2013 | Language: | FR | [2013/47] | Type: | B1 Patent specification | No.: | EP2664834 | Date: | 19.11.2014 | Language: | FR | [2014/47] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.06.2013 | Classification | IPC: | F16L37/56, H01R13/631 | [2013/47] | CPC: |
F16L37/56 (EP,US);
H01R12/91 (US);
H01R13/6315 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/47] | Title | German: | Anschlusseinheit und entsprechender Zusammenbau | [2013/47] | English: | Coupling assembly and corresponding assembly | [2013/47] | French: | Ensemble de raccord et Assemblage correspondant | [2013/47] | Examination procedure | 23.04.2014 | Examination requested [2014/23] | 25.06.2014 | Communication of intention to grant the patent | 06.10.2014 | Fee for grant paid | 06.10.2014 | Fee for publishing/printing paid | 06.10.2014 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 25.06.2014 | Opposition(s) | 20.08.2015 | No opposition filed within time limit [2015/44] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.05.2013 | AL | 19.11.2014 | AT | 19.11.2014 | BG | 19.11.2014 | CY | 19.11.2014 | CZ | 19.11.2014 | DK | 19.11.2014 | EE | 19.11.2014 | ES | 19.11.2014 | FI | 19.11.2014 | HR | 19.11.2014 | IT | 19.11.2014 | LT | 19.11.2014 | LV | 19.11.2014 | MC | 19.11.2014 | MK | 19.11.2014 | MT | 19.11.2014 | NL | 19.11.2014 | PL | 19.11.2014 | RO | 19.11.2014 | RS | 19.11.2014 | SE | 19.11.2014 | SI | 19.11.2014 | SK | 19.11.2014 | SM | 19.11.2014 | NO | 19.02.2015 | GR | 20.02.2015 | IS | 19.03.2015 | PT | 19.03.2015 | IE | 15.05.2015 | LU | 15.05.2015 | BE | 31.05.2015 | [2018/46] |
Former [2018/29] | HU | 15.05.2013 | |
AT | 19.11.2014 | ||
BG | 19.11.2014 | ||
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
MK | 19.11.2014 | ||
MT | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
SI | 19.11.2014 | ||
SK | 19.11.2014 | ||
SM | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
IE | 15.05.2015 | ||
LU | 15.05.2015 | ||
BE | 31.05.2015 | ||
Former [2017/39] | HU | 15.05.2013 | |
AT | 19.11.2014 | ||
BG | 19.11.2014 | ||
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
MT | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
SI | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
IE | 15.05.2015 | ||
LU | 15.05.2015 | ||
BE | 31.05.2015 | ||
Former [2017/03] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
MT | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
SI | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
IE | 15.05.2015 | ||
LU | 15.05.2015 | ||
Former [2016/20] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
SI | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
IE | 15.05.2015 | ||
LU | 15.05.2015 | ||
Former [2016/12] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
SI | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
LU | 15.05.2015 | ||
Former [2016/06] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
LU | 15.05.2015 | ||
Former [2016/03] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/37] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/36] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/35] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/26] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/25] | AT | 19.11.2014 | |
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/24] | ES | 19.11.2014 | |
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
NL | 19.11.2014 | ||
PL | 19.11.2014 | ||
RS | 19.11.2014 | ||
SE | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/23] | ES | 19.11.2014 | |
FI | 19.11.2014 | ||
LT | 19.11.2014 | ||
NL | 19.11.2014 | ||
NO | 19.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/22] | LT | 19.11.2014 | |
NO | 19.02.2015 | ||
PT | 19.03.2015 | ||
Former [2015/21] | LT | 19.11.2014 | |
NO | 19.02.2015 | ||
Former [2015/20] | LT | 19.11.2014 | Documents cited: | Search | [A]US6422886 (MACBETH CHRISTOPHER S [US], et al) [A] 1-8,11,12 * column 2 - column 10; figure - *; | [A]DE102010035868 (PHOENIX CONTACT GMBH & CO [DE]) [A] 1-8,11-15* paragraph [0036] - paragraph [0077]; figure - * | by applicant | JPS61267277 |