EP2696635 - SMALL-SCALE BASE STATION, COMMUNICATION SYSTEM, AND COMMUNICATION METHOD [Right-click to bookmark this link] | |||
Former [2014/07] | Small-scale base station, communication system, and communication method | ||
[2018/11] | Status | No opposition filed within time limit Status updated on 31.05.2019 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 22.06.2018 | ||
Former | Grant of patent is intended Status updated on 12.02.2018 | ||
Former | Request for examination was made Status updated on 03.02.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states FUJITSU LIMITED 1-1, Kamikodanaka 4-chome, Nakahara-ku Kawasaki-shi Kanagawa 211-8588 / JP | [2014/07] | Inventor(s) | 01 /
HIRATA, Akira c/o FUJITSU LIMITED 1-1, Kamikodanaka 4-chome, Nakahara-ku Kawasaki-shi, Kanagawa 211-8588 / JP | [2014/07] | Representative(s) | Haseltine Lake Kempner LLP Bürkleinstrasse 10 80538 München / DE | [N/P] |
Former [2018/30] | Ward, James Norman, et al Haseltine Lake LLP Bürkleinstrasse 10 80538 München / DE | ||
Former [2014/07] | Ward, James Norman Haseltine Lake LLP Lincoln House, 5th Floor 300 High Holborn London WC1V 7JH / GB | Application number, filing date | 13168477.1 | 21.05.2013 | [2014/07] | Priority number, date | JP20120174624 | 07.08.2012 Original published format: JP 2012174624 | [2014/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2696635 | Date: | 12.02.2014 | Language: | EN | [2014/07] | Type: | A3 Search report | No.: | EP2696635 | Date: | 04.01.2017 | Language: | EN | [2017/01] | Type: | B1 Patent specification | No.: | EP2696635 | Date: | 25.07.2018 | Language: | EN | [2018/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 05.12.2016 | Classification | IPC: | H04W72/00, H04W72/08, H04W16/14 | [2017/01] | CPC: |
H04W72/00 (EP,US);
H04W72/0446 (US);
H04W16/10 (EP,US);
H04W16/32 (EP,US);
H04W72/541 (EP,US)
|
Former IPC [2014/07] | H04W72/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/10] |
Former [2014/07] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KLEINE BASISSTATION, KOMMUNIKATIONSSYSTEM UND KOMMUNIKATIONSVERFAHREN | [2018/11] | English: | SMALL-SCALE BASE STATION, COMMUNICATION SYSTEM, AND COMMUNICATION METHOD | [2018/11] | French: | STATION DE BASE À PETITE ÉCHELLE, SYSTÈME DE COMMUNICATION ET PROCÉDÉ DE COMMUNICATION | [2018/11] |
Former [2014/07] | Kleine Basisstation, Kommunikationssystem und Kommunikationsverfahren | ||
Former [2014/07] | Small-scale base station, communication system, and communication method | ||
Former [2014/07] | Station de base à petite échelle, système de communication et procédé de communication | Examination procedure | 21.05.2013 | Date on which the examining division has become responsible | 25.01.2017 | Examination requested [2017/10] | 03.07.2017 | Amendment by applicant (claims and/or description) | 13.02.2018 | Communication of intention to grant the patent | 13.06.2018 | Fee for grant paid | 13.06.2018 | Fee for publishing/printing paid | 13.06.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.02.2018 | Opposition(s) | 26.04.2019 | No opposition filed within time limit [2019/27] | Fees paid | Renewal fee | 05.03.2015 | Renewal fee patent year 03 | 03.03.2016 | Renewal fee patent year 04 | 03.03.2017 | Renewal fee patent year 05 | 05.03.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.05.2013 | AL | 25.07.2018 | AT | 25.07.2018 | CY | 25.07.2018 | CZ | 25.07.2018 | DK | 25.07.2018 | EE | 25.07.2018 | ES | 25.07.2018 | FI | 25.07.2018 | HR | 25.07.2018 | IT | 25.07.2018 | LT | 25.07.2018 | LV | 25.07.2018 | MC | 25.07.2018 | MK | 25.07.2018 | MT | 25.07.2018 | NL | 25.07.2018 | PL | 25.07.2018 | RO | 25.07.2018 | RS | 25.07.2018 | SE | 25.07.2018 | SI | 25.07.2018 | SK | 25.07.2018 | SM | 25.07.2018 | TR | 25.07.2018 | BG | 25.10.2018 | NO | 25.10.2018 | GR | 26.10.2018 | IS | 25.11.2018 | PT | 25.11.2018 | [2022/31] |
Former [2021/34] | HU | 21.05.2013 | |
AL | 25.07.2018 | ||
AT | 25.07.2018 | ||
CY | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
MT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
PT | 25.11.2018 | ||
Former [2021/32] | HU | 21.05.2013 | |
AL | 25.07.2018 | ||
AT | 25.07.2018 | ||
CY | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
PT | 25.11.2018 | ||
Former [2021/26] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CY | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
PT | 25.11.2018 | ||
Former [2020/29] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
PT | 25.11.2018 | ||
Former [2020/16] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2020/07] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/37] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/26] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/23] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SK | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/22] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/21] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/12] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/11] | AT | 25.07.2018 | |
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/10] | AT | 25.07.2018 | |
FI | 25.07.2018 | ||
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/08] | FI | 25.07.2018 | |
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
NO | 25.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/07] | LT | 25.07.2018 | |
NL | 25.07.2018 | ||
Former [2019/04] | NL | 25.07.2018 | Documents cited: | Search | [A]US2011310830 (WU CIOU-PING [TW], et al) [A] 1-16* paragraphs [0006] , [00 8] , [0 11] , [0 15] , [0 47] , [0 48] , [0 49] , [ 50] - [0053] *; | [XAI]WO2011162182 (NTT DOCOMO INC [JP], et al) [X] 1,9-11,13,15 * the whole document * [A] 2-7,12,14,16 [I] 8; | [XAI]WO2012063934 (SUMITOMO ELECTRIC INDUSTRIES [JP], et al) [X] 1,2,15,16 * the whole document * [A] 3-13 [I] 14; | US2013170423 [ ] (ABE TETSUSHI [JP], et al) [ ] * paragraphs [0011] , [0 28] , [0 35] , [0 36] , [0 43] , [0 46] - [0048] - [0 73] - [0077] *; | US2013225192 [ ] (YAMAMOTO TAKASHI [JP], et al) [ ] * paragraphs [0016] - [0019] - [0 24] - [0025] - [0 28] , [ 164] - [0167] - [ 192] , [ 193] , [ 203] , [ 204] , [ 173] * * figure 11 * | by applicant | JP2010136337 | JP2011501526 | JP2011518519 | JP2011518471 | JP2012005079 | JP2012005086 |