EP2675231 - Method and apparatus for selecting and reselecting an uplink primary carrier [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.11.2019 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 14.12.2018 | ||
Former | Grant of patent is intended Status updated on 08.08.2018 | ||
Former | Examination is in progress Status updated on 20.03.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Interdigital Patent Holdings, Inc. 200 Bellevue Parkway, Suite 300 Wilmington, 19809 / US | [N/P] |
Former [2019/03] | For all designated states Interdigital Patent Holdings, Inc. 200 Bellevue Parkway, Suite 300 Wilmington, DE 19809 / US | ||
Former [2013/51] | For all designated states Interdigital Patent Holdings, Inc. 200 Bellevue Parkway Suite 300 Wilmington, DE 19809 / US | Inventor(s) | 01 /
Gauvreau, Jean-Louis 115 Paradis LaPrairie, Québec J5R 6G7 / CA | 02 /
Terry, Stephen E. 15 Summit Avenue Northport, NY 11768 / US | 03 /
Marinier, Paul 1805 Stravinski Brossard, Québec J4X 2J7 / CA | 04 /
Pan, Kyle Jung-Lin 9 Country Woods Drive Saint James, NY 11780 / US | [2013/51] | Representative(s) | AWA Sweden AB Box 45086 104 30 Stockholm / SE | [N/P] |
Former [2019/03] | AWA Sweden AB P.O. Box 45086 104 30 Stockholm / SE | ||
Former [2013/51] | Hansson, Anders Max, et al Awapatent AB P.O. Box 45086 104 30 Stockholm / SE | Application number, filing date | 13176667.7 | 10.03.2010 | [2013/51] | Priority number, date | US20090159665P | 12.03.2009 Original published format: US 159665 P | US20090218271P | 18.06.2009 Original published format: US 218271 P | [2013/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2675231 | Date: | 18.12.2013 | Language: | EN | [2013/51] | Type: | A3 Search report | No.: | EP2675231 | Date: | 13.08.2014 | Language: | EN | [2014/33] | Type: | B1 Patent specification | No.: | EP2675231 | Date: | 16.01.2019 | Language: | EN | [2019/03] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.07.2014 | Classification | IPC: | H04W72/04 | [2013/51] | CPC: |
H04W72/02 (EP,BR,KR,US);
H04L1/1861 (BR,RU,US);
H04W72/21 (EP,BR,KR,US);
H04L1/0026 (KR);
H04L1/1812 (KR);
H04L5/001 (EP,BR,RU,US);
H04L5/0055 (EP,BR,US);
H04W28/02 (KR);
H04W52/04 (KR);
H04W72/20 (EP,BR,KR,US);
H04W72/23 (EP,BR,KR,US);
H04W74/0833 (KR);
H04W88/02 (KR)
(-)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2013/51] | Title | German: | Verfahren und Vorrichtung zur Auswahl und Wiederauswahl eines Aufwärtsverbindungs-Primärträgers | [2013/51] | English: | Method and apparatus for selecting and reselecting an uplink primary carrier | [2013/51] | French: | Procédé et dispositif pour sélectionner et resélectionner une porteuse primaire de liaison montante | [2013/51] | Examination procedure | 16.07.2013 | Examination requested [2013/51] | 11.02.2015 | Amendment by applicant (claims and/or description) | 23.07.2015 | Despatch of a communication from the examining division (Time limit: M04) | 23.11.2015 | Reply to a communication from the examining division | 14.03.2016 | Despatch of a communication from the examining division (Time limit: M06) | 09.09.2016 | Reply to a communication from the examining division | 07.03.2017 | Despatch of a communication from the examining division (Time limit: M04) | 17.07.2017 | Reply to a communication from the examining division | 18.01.2018 | Despatch of a communication from the examining division (Time limit: M04) | 09.05.2018 | Reply to a communication from the examining division | 09.08.2018 | Communication of intention to grant the patent | 07.12.2018 | Fee for grant paid | 07.12.2018 | Fee for publishing/printing paid | 07.12.2018 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP10710705.4 / EP2406999 | Opposition(s) | 17.10.2019 | No opposition filed within time limit [2019/52] | Fees paid | Renewal fee | 16.07.2013 | Renewal fee patent year 03 | 16.07.2013 | Renewal fee patent year 04 | 12.03.2014 | Renewal fee patent year 05 | 24.03.2015 | Renewal fee patent year 06 | 23.03.2016 | Renewal fee patent year 07 | 23.03.2017 | Renewal fee patent year 08 | 23.03.2018 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.03.2010 | AT | 16.01.2019 | CY | 16.01.2019 | CZ | 16.01.2019 | EE | 16.01.2019 | ES | 16.01.2019 | FI | 16.01.2019 | HR | 16.01.2019 | LT | 16.01.2019 | LV | 16.01.2019 | MC | 16.01.2019 | MK | 16.01.2019 | PL | 16.01.2019 | RO | 16.01.2019 | SE | 16.01.2019 | SI | 16.01.2019 | SK | 16.01.2019 | SM | 16.01.2019 | TR | 16.01.2019 | IE | 10.03.2019 | LU | 10.03.2019 | MT | 10.03.2019 | BE | 31.03.2019 | CH | 31.03.2019 | LI | 31.03.2019 | BG | 16.04.2019 | NO | 16.04.2019 | GR | 17.04.2019 | IS | 16.05.2019 | PT | 16.05.2019 | [2022/31] |
Former [2021/32] | HU | 10.03.2010 | |
AT | 16.01.2019 | ||
CY | 16.01.2019 | ||
CZ | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
SE | 16.01.2019 | ||
SI | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
TR | 16.01.2019 | ||
IE | 10.03.2019 | ||
LU | 10.03.2019 | ||
MT | 10.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2021/26] | AT | 16.01.2019 | |
CY | 16.01.2019 | ||
CZ | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
SE | 16.01.2019 | ||
SI | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
TR | 16.01.2019 | ||
IE | 10.03.2019 | ||
LU | 10.03.2019 | ||
MT | 10.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2020/29] | AT | 16.01.2019 | |
CZ | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
SE | 16.01.2019 | ||
SI | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
TR | 16.01.2019 | ||
IE | 10.03.2019 | ||
LU | 10.03.2019 | ||
MT | 10.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2020/17] | AT | 16.01.2019 | |
CZ | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
SE | 16.01.2019 | ||
SI | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
TR | 16.01.2019 | ||
IE | 10.03.2019 | ||
LU | 10.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2020/11] | AT | 16.01.2019 | |
CZ | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
SE | 16.01.2019 | ||
SI | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
IE | 10.03.2019 | ||
LU | 10.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2020/09] | AT | 16.01.2019 | |
CZ | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
SE | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
IE | 10.03.2019 | ||
LU | 10.03.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2019/52] | AT | 16.01.2019 | |
CZ | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
SE | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
LU | 10.03.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2019/49] | AT | 16.01.2019 | |
CZ | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
SE | 16.01.2019 | ||
SK | 16.01.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2019/46] | AT | 16.01.2019 | |
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
PL | 16.01.2019 | ||
SE | 16.01.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2019/39] | ES | 16.01.2019 | |
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
PL | 16.01.2019 | ||
SE | 16.01.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2019/38] | ES | 16.01.2019 | |
FI | 16.01.2019 | ||
LT | 16.01.2019 | ||
PL | 16.01.2019 | ||
SE | 16.01.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
PT | 16.05.2019 | ||
Former [2019/37] | ES | 16.01.2019 | |
FI | 16.01.2019 | ||
LT | 16.01.2019 | ||
PL | 16.01.2019 | ||
SE | 16.01.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
PT | 16.05.2019 | ||
Former [2019/35] | ES | 16.01.2019 | |
FI | 16.01.2019 | ||
LT | 16.01.2019 | ||
PL | 16.01.2019 | ||
SE | 16.01.2019 | ||
NO | 16.04.2019 | ||
PT | 16.05.2019 | ||
Former [2019/34] | FI | 16.01.2019 | |
LT | 16.01.2019 | ||
SE | 16.01.2019 | ||
NO | 16.04.2019 | ||
PT | 16.05.2019 | ||
Former [2019/33] | FI | 16.01.2019 | |
LT | 16.01.2019 | ||
NO | 16.04.2019 | ||
PT | 16.05.2019 | Documents cited: | Search | [E]EP2461637 (SHARP KK [JP]) [E] 1-3,8-10 * paragraph [0013] - paragraph [0015] *; | [A] - LG ELECTRONICS, "Considerations on DL/UL Transmission in Asymmetric Carrier Aggregation", 3GPP DRAFT; R1-090211, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090107), no. Ljubljana; 20090107, XP050318142 [A] 1-14 * paragraph [03.1] * |