EP2826909 - Method for operating a steam generation unit in a laundry dryer and method of operating a laundry dryer [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.08.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 10.09.2021 | ||
Former | Grant of patent is intended Status updated on 20.05.2021 | ||
Former | Examination is in progress Status updated on 08.04.2020 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Electrolux Appliances Aktiebolag St Göransgatan 143 105 45 Stockholm / SE | [2015/04] | Inventor(s) | 01 /
Ros, Paolo Electrolux Italia S.p.A. Corso Lino Zanussi 30 33080 Porcia (PN) / IT | 02 /
Solerio, Daniele Electrolux Italia S.p.A. Corso Lino Zanussi 30 33080 Porcia (PN) / IT | [2015/04] | Representative(s) | Electrolux Group Patents AB Electrolux Group Patents S:t Göransgatan 143 105 45 Stockholm / SE | [2021/41] |
Former [2015/04] | Nardoni, Andrea, et al Electrolux Italia S.p.A. Corso Lino Zanussi, 30 33080 Porcia (PN) / IT | Application number, filing date | 13177180.0 | 19.07.2013 | [2015/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2826909 | Date: | 21.01.2015 | Language: | EN | [2015/04] | Type: | B1 Patent specification | No.: | EP2826909 | Date: | 13.10.2021 | Language: | EN | [2021/41] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.06.2014 | Classification | IPC: | D06F39/00, D06F58/26, D06F58/20 | [2021/22] | CPC: |
D06F58/44 (EP,US);
D06F2103/32 (EP,US);
D06F2103/38 (EP,US);
D06F2103/50 (EP,US);
D06F2103/62 (EP,US);
D06F2105/02 (EP,US);
D06F2105/26 (EP,US);
D06F2105/28 (EP,US);
D06F2105/40 (EP,US);
|
Former IPC [2015/04] | D06F39/00, D06F58/26, D06F58/28, D06F58/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/35] |
Former [2015/04] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren zum Betreiben einer Dampferzeugungseinheit in einem Wäschetrockner und eines Wäschetrockners | [2015/04] | English: | Method for operating a steam generation unit in a laundry dryer and method of operating a laundry dryer | [2015/04] | French: | Procédé pour faire fonctionner une unité de génération de vapeur dans un sèche-linge et un procédé pour faire fonctionner un sèche-linge | [2015/04] | Examination procedure | 03.07.2015 | Amendment by applicant (claims and/or description) | 21.07.2015 | Examination requested [2015/35] | 15.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 06.08.2020 | Reply to a communication from the examining division | 30.10.2020 | Despatch of a communication from the examining division (Time limit: M04) | 16.02.2021 | Reply to a communication from the examining division | 21.05.2021 | Communication of intention to grant the patent | 31.08.2021 | Fee for grant paid | 31.08.2021 | Fee for publishing/printing paid | 31.08.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.04.2020 | Opposition(s) | 14.07.2022 | No opposition filed within time limit [2022/38] | Fees paid | Renewal fee | 23.07.2015 | Renewal fee patent year 03 | 01.08.2016 | Renewal fee patent year 04 | 31.07.2017 | Renewal fee patent year 05 | 31.07.2018 | Renewal fee patent year 06 | 31.07.2019 | Renewal fee patent year 07 | 31.07.2020 | Renewal fee patent year 08 | 02.08.2021 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.07.2013 | AL | 13.10.2021 | AT | 13.10.2021 | CY | 13.10.2021 | CZ | 13.10.2021 | DK | 13.10.2021 | EE | 13.10.2021 | ES | 13.10.2021 | FI | 13.10.2021 | HR | 13.10.2021 | IT | 13.10.2021 | LT | 13.10.2021 | LV | 13.10.2021 | MC | 13.10.2021 | MK | 13.10.2021 | MT | 13.10.2021 | NL | 13.10.2021 | RO | 13.10.2021 | RS | 13.10.2021 | SE | 13.10.2021 | SI | 13.10.2021 | SK | 13.10.2021 | SM | 13.10.2021 | TR | 13.10.2021 | BG | 13.01.2022 | NO | 13.01.2022 | GR | 14.01.2022 | IS | 13.02.2022 | PT | 14.02.2022 | [2024/41] |
Former [2024/29] | HU | 19.07.2013 | |
AL | 13.10.2021 | ||
AT | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
MK | 13.10.2021 | ||
NL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
TR | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2024/22] | HU | 19.07.2013 | |
AL | 13.10.2021 | ||
AT | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
MK | 13.10.2021 | ||
NL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2024/20] | HU | 19.07.2013 | |
AL | 13.10.2021 | ||
AT | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2024/18] | HU | 19.07.2013 | |
AL | 13.10.2021 | ||
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2023/27] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2023/11] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2023/01] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/49] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/35] | AT | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/34] | AT | 13.10.2021 | |
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/33] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/25] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/24] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
BG | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/23] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
PT | 14.02.2022 | ||
Former [2022/22] | AT | 13.10.2021 | |
FI | 13.10.2021 | ||
LT | 13.10.2021 | ||
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
Former [2022/21] | AT | 13.10.2021 | |
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
Former [2022/19] | BG | 13.01.2022 | Documents cited: | Search | [AD]WO2004059070 (BSH BOSCH SIEMENS HAUSGERAETE [DE], et al) [AD] 1-9 * the whole document *; | [I]EP1659205 (SAMSUNG ELECTRONICS CO LTD [KR]) [I] 1-9 * the whole document *; | [A]EP1873297 (LG ELECTRONICS INC [KR]) [A] 1-9 * the whole document *; | [AD]EP1887127 (ELECTROLUX HOME PROD CORP [BE]) [AD] 1-9 * the whole document *; | [ID]EP1889966 (WHIRLPOOL CO [US]) [ID] 1-9 * the whole document *; | [A]EP1932965 (LG ELECTRONICS INC [KR]) [A] 1-9 * the whole document *; | [IA]DE102008003247 (LG ELECTRONICS INC [KR]) [I] 1-12,18,19 * the whole document * [A] 13-17; | [I]EP2006432 (MIELE & CIE [DE]) [I] 1-9 * the whole document *; | [IA]DE102008028177 (LG ELECTRONICS INC [KR]) [I] 10-12,18,19 * the whole document * [A] 13-17; | [IA]US2009282696 (KIM MIN-JI [KR], et al) [I] 10,11 * the whole document * [A] 12-19; | [IA]WO2011074850 (LG ELECTRONICS INC [KR], et al) [I] 10 * the whole document *[A] 11-19; | [IA]EP2390404 (ELECTROLUX HOME PROD CORP [BE]) [I] 10,11,14,15,18,19 * the whole document * [A] 12,13,16,17 | by applicant | WO2004059070 | EP1887127 | EP1889966 |