blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2829250

EP2829250 - Dental implant, abutment, implant system and implantation set [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.03.2021
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  10.04.2020
FormerGrant of patent is intended
Status updated on  03.12.2019
FormerExamination is in progress
Status updated on  21.05.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
SIC Invent AG
Birmannsgasse 3
4055 Basel / CH
[2015/05]
Inventor(s)01 / Von Malottki, Marcus, Dipl.-Wirt.-Ing.
Bavierstraße 7
40699 Erkrath / DE
02 / Schilli, Wilfried, Prof. Dr.
Horbener Straße 27
79100 Freiburg / DE
 [2015/05]
Representative(s)Kugler, Jörg
Tergau & Walkenhorst
Patentanwälte PartGmbB
Lurgiallee 12
60439 Frankfurt am Main / DE
[2020/20]
Former [2015/05]Kugler, Jörg
Tergau & Walkenhorst
Patentanwälte - Rechtsanwälte
Eschersheimer Landstraße 105-107
60322 Frankfurt am Main / DE
Application number, filing date13178279.926.07.2013
[2015/05]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2829250
Date:28.01.2015
Language:DE
[2015/05]
Type: B1 Patent specification 
No.:EP2829250
Date:13.05.2020
Language:DE
[2020/20]
Search report(s)(Supplementary) European search report - dispatched on:EP08.01.2014
ClassificationIPC:A61C8/00
[2015/05]
CPC:
A61C8/0066 (EP,US); A61C8/0001 (EP,US); A61C8/0022 (US);
A61C8/0068 (US); A61C8/0069 (US); A61C8/0071 (EP,US);
A61C8/008 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/36]
Former [2015/05]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Dentalimplantat, Abutment, Implantatsystem und Implantationsset[2015/05]
English:Dental implant, abutment, implant system and implantation set[2015/05]
French:Implant dentaire, butée, système d'implant et jeu d'implantation[2015/05]
Examination procedure24.07.2015Amendment by applicant (claims and/or description)
28.07.2015Examination requested  [2015/36]
24.05.2019Despatch of a communication from the examining division (Time limit: M04)
23.09.2019Reply to a communication from the examining division
04.12.2019Communication of intention to grant the patent
02.04.2020Fee for grant paid
02.04.2020Fee for publishing/printing paid
02.04.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  24.05.2019
Opposition(s)16.02.2021No opposition filed within time limit [2021/16]
Fees paidRenewal fee
31.07.2015Renewal fee patent year 03
26.07.2016Renewal fee patent year 04
25.07.2017Renewal fee patent year 05
10.07.2018Renewal fee patent year 06
15.07.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MK13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
IE26.07.2020
LU26.07.2020
BE31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
[2022/32]
Former [2022/27]AL13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
IE26.07.2020
LU26.07.2020
BE31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2021/37]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
IE26.07.2020
LU26.07.2020
BE31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2021/24]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
LU26.07.2020
BE31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2021/20]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
LU26.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2021/13]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2021/10]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2021/09]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2021/08]AL13.05.2020
DK13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2021/04]AL13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2021/01]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2020/51]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2020/50]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
Former [2020/48]FI13.05.2020
LT13.05.2020
SE13.05.2020
NO13.08.2020
IS13.09.2020
Former [2020/47]LT13.05.2020
NO13.08.2020
IS13.09.2020
Former [2020/46]IS13.09.2020
Documents cited:Search[XI]CN201160908Y  (WEIHAI WEIGAO BIO TECH CO LTD [CN]) [X] 1,8-10,12,14,15 * figure - * [I] 2;
 [XI]US2009111072  (LOMBARDO ALAN [US], et al) [X] 1-3,7-10,12,14,15 * paragraphs [0055] - [0057] * * figures 4A, 4B, 5A, 5B, 8A, 8B * [I] 4-6,11,13;
 [A]CN101732097  (WEIHAI WEIGAO BIOTECHNOLOGY CO)[A] 1,8,9;
 [A]US2010248181  (KREMER EGBERT [DE], et al) [A] 1,3-6,9 * paragraph [0025] * * figures 7, 8 *;
 [I]US2012077151  (NARY FILHO HUGO [BR], et al) [I] 1,2,8 * paragraphs [0037] , [0 43] , [0 44] * * figure 3 *;
 [X]WO2012123654  (BIOTECH INTERNAT [FR], et al) [X] 1,8-10,14,15 * page 3, lines 4-25 * * page 7, lines 27-30 * * figures 1-3 *;
 [A]US2012270180  (DAHLSTROEM MATTIAS [SE], et al) [A] 1,3-6,9-11 * paragraphs [0073] , [0 76] * * figures 1a, 1b, 2a, 3a *
ExaminationEP2570097
by applicantWO2011089057
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.