blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2709258

EP2709258 - Circuit arrangement for connection to an electrical circuit and electrical circuit [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.09.2019
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  05.10.2018
FormerGrant of patent is intended
Status updated on  29.05.2018
FormerExamination is in progress
Status updated on  21.11.2016
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
GE Energy Power Conversion GmbH
Culemeyerstrasse 1
12277 Berlin / DE
[2014/12]
Inventor(s)01 / Geske, Martin
Friedrich-Engels-Strasse
14473 Potsdam / DE
02 / Jakob, Roland
Altglienicker Grund 64
12524 Berlin / DE
 [2014/12]
Representative(s)Serjeants LLP
Dock
75 Exploration Drive
Leicester, LE4 5NU / GB
[2018/45]
Former [2014/12]Serjeants LLP
25 The Crescent
King Street
Leicester, LE1 6RX / GB
Application number, filing date13184032.412.09.2013
[2014/12]
Priority number, dateDE20121021636814.09.2012         Original published format: DE102012216368
[2014/12]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2709258
Date:19.03.2014
Language:EN
[2014/12]
Type: B1 Patent specification 
No.:EP2709258
Date:07.11.2018
Language:EN
[2018/45]
Search report(s)(Supplementary) European search report - dispatched on:EP02.01.2014
ClassificationIPC:H02M5/458, H02M1/32, H02M1/36
[2014/12]
CPC:
H02M1/32 (EP,US); H02J4/00 (US); H02M1/36 (EP,US);
H02M5/458 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/45]
Former [2014/12]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Schaltungsanordnung zum Anschließen an einen Stromkreis und Stromkreis[2014/12]
English:Circuit arrangement for connection to an electrical circuit and electrical circuit[2014/12]
French:Agencement de circuit pour connexion à un circuit électrique et circuit électrique[2014/12]
Examination procedure27.08.2014Examination requested  [2014/41]
02.09.2014Amendment by applicant (claims and/or description)
22.07.2016Despatch of a communication from the examining division (Time limit: M06)
18.01.2017Reply to a communication from the examining division
30.05.2018Communication of intention to grant the patent
21.09.2018Receipt of the translation of the claim(s)
28.09.2018Fee for grant paid
28.09.2018Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  22.07.2016
Opposition(s)08.08.2019No opposition filed within time limit [2019/42]
Fees paidRenewal fee
28.09.2015Renewal fee patent year 03
27.09.2016Renewal fee patent year 04
27.09.2017Renewal fee patent year 05
21.09.2018Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.09.2013
AL07.11.2018
AT07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
MK07.11.2018
MT07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
[2022/31]
Former [2021/34]HU12.09.2013
AL07.11.2018
AT07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
MT07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2021/33]HU12.09.2013
AL07.11.2018
AT07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2021/26]AL07.11.2018
AT07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2020/25]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2020/17]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/50]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/40]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SK07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/37]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/35]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/34]AL07.11.2018
AT07.11.2018
DK07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/26]AL07.11.2018
AT07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/25]AT07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
Former [2019/24]AT07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
Former [2019/23]AT07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
BG07.02.2019
NO07.02.2019
IS07.03.2019
Former [2019/22]FI07.11.2018
LT07.11.2018
BG07.02.2019
NO07.02.2019
IS07.03.2019
Former [2019/21]FI07.11.2018
LT07.11.2018
NO07.02.2019
IS07.03.2019
Former [2019/20]LT07.11.2018
NO07.02.2019
Documents cited:Search[Y]US5748423  (HENNCHEN NORBERT [DE]) [Y] 3,5-11 * figure 1 ** column 2, line 19 - column 2, line 56 *;
 [XY]US2010213921  (ABOLHASSANI MEHDI [US], et al) [X] 1,2,4 * figures 1-2 * * figure 4 * * figure 6 * * paragraph [0020] - paragraph [0021] * * paragraph [0023] - paragraph [0024] * * paragraph [0034] * * paragraph [0038] * * paragraph [0046] * [Y] 3,5-11;
 [XY]US2011013441  (GRUBER RAINER [DE], et al) [X] 1,2,4 * figure 3 * * figure 7 * * page 12 * * abstract * * paragraph [0053] * [Y] 3,5-11;
 [AP]CN102790517  (HITACHI LTD) [AP] 1-11 * figures 1-2 *
by applicantDE10146868
 DE102007042246
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.