blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2687719

EP2687719 - Rotor blade, rotor blade element and production method [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  15.07.2021
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  26.05.2017
FormerGrant of patent is intended
Status updated on  09.01.2017
Most recent event   Tooltip26.06.2020Lapse of the patent in a contracting state
New state(s): CY, MK
published on 29.07.2020  [2020/31]
Applicant(s)For all designated states
Wobben Properties GmbH
Borsigstrasse 26
26607 Aurich / DE
[2016/01]
Former [2014/04]For all designated states
Wobben Properties GmbH
Dreekamp 5
26605 Aurich / DE
Inventor(s)01 / Muschke, Sven
Bahnweg 46
26419 Schortens / DE
02 / Link, Torsten
Wurzeldeich 60
26506 Norden / DE
 [2014/04]
Representative(s)Eisenführ Speiser
Patentanwälte Rechtsanwälte PartGmbB
Postfach 10 60 78
28060 Bremen / DE
[2014/04]
Application number, filing date13187135.213.04.2010
[2014/04]
Priority number, dateDE2009100250120.04.2009         Original published format: DE102009002501
[2014/04]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2687719
Date:22.01.2014
Language:DE
[2014/04]
Type: B1 Patent specification 
No.:EP2687719
Date:28.06.2017
Language:DE
[2017/26]
Search report(s)(Supplementary) European search report - dispatched on:EP02.01.2014
ClassificationIPC:F03D1/06, B29C70/44
[2014/04]
CPC:
B29C70/086 (EP,US); F03D1/06 (KR); B29C70/44 (KR);
B29C70/443 (EP,US); B29D99/0028 (EP,US); B29L2031/082 (EP,US);
B29L2031/085 (EP); F05B2230/90 (EP,US); Y02E10/72 (EP,US);
Y02P70/50 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2017/26]
Former [2014/04]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Rotorblatt, Rotorblattelement und Herstellverfahren[2014/04]
English:Rotor blade, rotor blade element and production method[2014/04]
French:Pale de rotor, élément de pale de rotor et procédé de fabrication[2014/04]
Examination procedure22.07.2014Amendment by applicant (claims and/or description)
22.07.2014Examination requested  [2014/35]
26.06.2015Despatch of a communication from the examining division (Time limit: M04)
06.11.2015Reply to a communication from the examining division
05.12.2016Cancellation of oral proceeding that was planned for 06.12.2016
06.12.2016Date of oral proceedings (cancelled)
10.01.2017Communication of intention to grant the patent
15.05.2017Fee for grant paid
15.05.2017Fee for publishing/printing paid
15.05.2017Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP10713644.2  / EP2422077
Opposition(s)29.03.2018No opposition filed within time limit [2018/23]
Fees paidRenewal fee
03.02.2014Renewal fee patent year 03
03.02.2014Renewal fee patent year 04
06.03.2014Renewal fee patent year 05
30.04.2015Renewal fee patent year 06
02.05.2016Renewal fee patent year 07
02.05.2017Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.04.2010
CY28.06.2017
CZ28.06.2017
EE28.06.2017
FI28.06.2017
HR28.06.2017
IT28.06.2017
LT28.06.2017
LV28.06.2017
MC28.06.2017
MK28.06.2017
MT28.06.2017
PL28.06.2017
RO28.06.2017
SI28.06.2017
SK28.06.2017
SM28.06.2017
TR28.06.2017
BG28.09.2017
NO28.09.2017
IS28.10.2017
[2020/31]
Former [2020/28]HU13.04.2010
CZ28.06.2017
EE28.06.2017
FI28.06.2017
HR28.06.2017
IT28.06.2017
LT28.06.2017
LV28.06.2017
MC28.06.2017
MT28.06.2017
PL28.06.2017
RO28.06.2017
SI28.06.2017
SK28.06.2017
SM28.06.2017
TR28.06.2017
BG28.09.2017
NO28.09.2017
IS28.10.2017
Former [2020/15]CZ28.06.2017
EE28.06.2017
FI28.06.2017
HR28.06.2017
IT28.06.2017
LT28.06.2017
LV28.06.2017
MC28.06.2017
MT28.06.2017
PL28.06.2017
RO28.06.2017
SI28.06.2017
SK28.06.2017
SM28.06.2017
TR28.06.2017
BG28.09.2017
NO28.09.2017
IS28.10.2017
Former [2018/52]CZ28.06.2017
EE28.06.2017
FI28.06.2017
HR28.06.2017
IT28.06.2017
LT28.06.2017
LV28.06.2017
MC28.06.2017
MT28.06.2017
PL28.06.2017
RO28.06.2017
SI28.06.2017
SK28.06.2017
SM28.06.2017
BG28.09.2017
NO28.09.2017
IS28.10.2017
Former [2018/43]CZ28.06.2017
EE28.06.2017
FI28.06.2017
HR28.06.2017
IT28.06.2017
LT28.06.2017
LV28.06.2017
MT28.06.2017
PL28.06.2017
RO28.06.2017
SI28.06.2017
SK28.06.2017
SM28.06.2017
BG28.09.2017
NO28.09.2017
IS28.10.2017
Former [2018/39]CZ28.06.2017
EE28.06.2017
FI28.06.2017
HR28.06.2017
IT28.06.2017
LT28.06.2017
LV28.06.2017
PL28.06.2017
RO28.06.2017
SI28.06.2017
SK28.06.2017
SM28.06.2017
BG28.09.2017
NO28.09.2017
IS28.10.2017
Former [2018/11]CZ28.06.2017
EE28.06.2017
FI28.06.2017
HR28.06.2017
IT28.06.2017
LT28.06.2017
LV28.06.2017
PL28.06.2017
RO28.06.2017
SK28.06.2017
SM28.06.2017
BG28.09.2017
NO28.09.2017
IS28.10.2017
Former [2018/10]CZ28.06.2017
EE28.06.2017
FI28.06.2017
HR28.06.2017
LT28.06.2017
LV28.06.2017
RO28.06.2017
SK28.06.2017
BG28.09.2017
NO28.09.2017
Former [2018/09]EE28.06.2017
FI28.06.2017
HR28.06.2017
LT28.06.2017
LV28.06.2017
BG28.09.2017
NO28.09.2017
Former [2017/50]FI28.06.2017
HR28.06.2017
LT28.06.2017
LV28.06.2017
BG28.09.2017
NO28.09.2017
Former [2017/49]FI28.06.2017
HR28.06.2017
LT28.06.2017
NO28.09.2017
Documents cited:Search[X]EP1625929  (STRUCTURAL POLYMER SYSTEMS LTD [GB]) [X] 1-14 * paragraph [0041] - paragraph [0049] * * paragraphs [0062] , [0088] , [0111] *;
 [X]WO2006066593  (LM GLASFIBER AS [DK], et al) [X] 1-12* page 3, line 6 - page 6, line 28 *
by applicantDE10319246
 DE10344379
 DE102004007487
 DE102006051897
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.