EP2725116 - Continuous single-dip process for galvanization of steel long products into Zn-Al-Mg alloys [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.01.2019 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 09.02.2018 | ||
Former | Grant of patent is intended Status updated on 04.01.2018 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Fontaine Holdings NV Centrum Zuid 2037 3530 Houthalen / BE | [2018/11] |
Former [2014/18] | For all designated states Fontaine Holdings NV Centrum Zuid 2037 3530 Houthalen / BE | Inventor(s) | 01 /
WARICHET, David Diepstraat 50 1970 Wezembeek-Oppem / BE | 02 /
BALDUYCK, Julien Rue de la Tahée, 56 6951 Bande / BE | 03 /
MASQUELIER, Caroline Rue des Paquerettes, 5 7850 Marcq / BE | [2014/18] | Representative(s) | Von Rohr Patentanwälte Partnerschaft mbB Rüttenscheider Straße 62 45130 Essen / DE | [2018/11] |
Former [2014/18] | Bird Goën & Co Wetenschapspark Arenberg Gaston Geenslaan 9 3001 Heverlee / BE | Application number, filing date | 13189739.9 | 22.10.2013 | [2014/18] | Priority number, date | GB20120019210 | 25.10.2012 Original published format: GB 201219210 | [2014/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2725116 | Date: | 30.04.2014 | Language: | EN | [2014/18] | Type: | B1 Patent specification | No.: | EP2725116 | Date: | 14.03.2018 | Language: | EN | [2018/11] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.02.2014 | Classification | IPC: | C23C2/02, B23K35/36, C23C2/06, C23C2/30, C23C2/38, C22C18/04, C23G1/08, B32B15/01, C23C2/36, C23G1/00, B23K35/362 | [2018/01] | CPC: |
C23C2/36 (EP,US);
C23C2/06 (EP,GB,KR,US);
C23C2/30 (EP,GB,KR,US);
B23K35/3603 (EP,US);
B23K35/362 (EP,US);
B32B15/013 (EP,US);
C22C18/04 (EP,US);
C23C2/0038 (EP,US);
C23C2/022 (EP,GB,KR,US);
C23C2/024 (EP,GB,KR,US);
C23C2/26 (EP,KR,US);
C23C2/38 (EP,US);
C23C2/385 (EP,US);
C23G1/00 (EP,US);
C23G1/08 (EP,US);
Y10T428/12799 (EP,US)
(-)
|
Former IPC [2014/18] | C23C2/02, B23K35/36, B23K35/362, C23C2/06, C23C2/30, C23C2/38, C22C18/04, C23G1/08, C23G1/28, C23G1/30 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/11] |
Former [2014/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Kontinuierliches Einzeldip-Verfahren zur Verzinkung von langen Stahlprodukten in Zn-Al-Mg-Legierungen | [2014/18] | English: | Continuous single-dip process for galvanization of steel long products into Zn-Al-Mg alloys | [2014/18] | French: | Procédé d'immersion simple continue pour la galvanisation de produits allongés en acier en alliages de zn-al-mg | [2014/18] | Examination procedure | 21.10.2014 | Amendment by applicant (claims and/or description) | 21.10.2014 | Examination requested [2014/48] | 14.07.2016 | Despatch of a communication from the examining division (Time limit: M04) | 12.09.2016 | Reply to a communication from the examining division | 05.01.2018 | Communication of intention to grant the patent | 30.01.2018 | Fee for grant paid | 30.01.2018 | Fee for publishing/printing paid | 30.01.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.07.2016 | Opposition(s) | 17.12.2018 | No opposition filed within time limit [2019/08] | Fees paid | Renewal fee | 26.10.2015 | Renewal fee patent year 03 | 26.10.2016 | Renewal fee patent year 04 | 19.10.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.10.2013 | AL | 14.03.2018 | CY | 14.03.2018 | CZ | 14.03.2018 | DK | 14.03.2018 | EE | 14.03.2018 | FI | 14.03.2018 | HR | 14.03.2018 | LT | 14.03.2018 | LV | 14.03.2018 | MC | 14.03.2018 | MK | 14.03.2018 | NL | 14.03.2018 | RO | 14.03.2018 | RS | 14.03.2018 | SE | 14.03.2018 | SI | 14.03.2018 | SK | 14.03.2018 | SM | 14.03.2018 | BG | 14.06.2018 | NO | 14.06.2018 | GR | 15.06.2018 | IS | 14.07.2018 | PT | 16.07.2018 | IE | 22.10.2018 | MT | 22.10.2018 | CH | 31.10.2018 | LI | 31.10.2018 | [2020/33] |
Former [2020/31] | HU | 22.10.2013 | |
AL | 14.03.2018 | ||
CY | 14.03.2018 | ||
CZ | 14.03.2018 | ||
DK | 14.03.2018 | ||
EE | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
MC | 14.03.2018 | ||
MK | 14.03.2018 | ||
NL | 14.03.2018 | ||
RO | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
SI | 14.03.2018 | ||
SK | 14.03.2018 | ||
SM | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
PT | 16.07.2018 | ||
IE | 22.10.2018 | ||
MT | 22.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2020/30] | HU | 22.10.2013 | |
AL | 14.03.2018 | ||
CY | 14.03.2018 | ||
CZ | 14.03.2018 | ||
DK | 14.03.2018 | ||
EE | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
MC | 14.03.2018 | ||
NL | 14.03.2018 | ||
RO | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
SI | 14.03.2018 | ||
SK | 14.03.2018 | ||
SM | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
PT | 16.07.2018 | ||
IE | 22.10.2018 | ||
MT | 22.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2020/08] | AL | 14.03.2018 | |
CY | 14.03.2018 | ||
CZ | 14.03.2018 | ||
DK | 14.03.2018 | ||
EE | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
MC | 14.03.2018 | ||
NL | 14.03.2018 | ||
RO | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
SI | 14.03.2018 | ||
SK | 14.03.2018 | ||
SM | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
PT | 16.07.2018 | ||
IE | 22.10.2018 | ||
MT | 22.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/48] | AL | 14.03.2018 | |
CY | 14.03.2018 | ||
CZ | 14.03.2018 | ||
DK | 14.03.2018 | ||
EE | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
MC | 14.03.2018 | ||
NL | 14.03.2018 | ||
RO | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
SI | 14.03.2018 | ||
SK | 14.03.2018 | ||
SM | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
PT | 16.07.2018 | ||
IE | 22.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/40] | AL | 14.03.2018 | |
CY | 14.03.2018 | ||
CZ | 14.03.2018 | ||
DK | 14.03.2018 | ||
EE | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
MC | 14.03.2018 | ||
NL | 14.03.2018 | ||
RO | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
SI | 14.03.2018 | ||
SK | 14.03.2018 | ||
SM | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
PT | 16.07.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/28] | AL | 14.03.2018 | |
CY | 14.03.2018 | ||
CZ | 14.03.2018 | ||
DK | 14.03.2018 | ||
EE | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
MC | 14.03.2018 | ||
NL | 14.03.2018 | ||
RO | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
SI | 14.03.2018 | ||
SK | 14.03.2018 | ||
SM | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
PT | 16.07.2018 | ||
Former [2019/13] | AL | 14.03.2018 | |
CY | 14.03.2018 | ||
CZ | 14.03.2018 | ||
DK | 14.03.2018 | ||
EE | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
NL | 14.03.2018 | ||
RO | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
SI | 14.03.2018 | ||
SK | 14.03.2018 | ||
SM | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
PT | 16.07.2018 | ||
Former [2019/08] | AL | 14.03.2018 | |
CY | 14.03.2018 | ||
CZ | 14.03.2018 | ||
DK | 14.03.2018 | ||
EE | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
NL | 14.03.2018 | ||
RO | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
SK | 14.03.2018 | ||
SM | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
PT | 16.07.2018 | ||
Former [2019/03] | AL | 14.03.2018 | |
CY | 14.03.2018 | ||
CZ | 14.03.2018 | ||
EE | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
NL | 14.03.2018 | ||
RO | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
SK | 14.03.2018 | ||
SM | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
PT | 16.07.2018 | ||
Former [2018/52] | AL | 14.03.2018 | |
CY | 14.03.2018 | ||
CZ | 14.03.2018 | ||
EE | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
NL | 14.03.2018 | ||
RO | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
SK | 14.03.2018 | ||
SM | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
Former [2018/50] | AL | 14.03.2018 | |
CY | 14.03.2018 | ||
CZ | 14.03.2018 | ||
EE | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
NL | 14.03.2018 | ||
RO | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
SK | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
Former [2018/46] | AL | 14.03.2018 | |
CY | 14.03.2018 | ||
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
NL | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
Former [2018/45] | CY | 14.03.2018 | |
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
NL | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
Former [2018/40] | CY | 14.03.2018 | |
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
LV | 14.03.2018 | ||
RS | 14.03.2018 | ||
SE | 14.03.2018 | ||
BG | 14.06.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
Former [2018/37] | CY | 14.03.2018 | |
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
NO | 14.06.2018 | ||
GR | 15.06.2018 | ||
Former [2018/35] | CY | 14.03.2018 | |
FI | 14.03.2018 | ||
HR | 14.03.2018 | ||
LT | 14.03.2018 | ||
NO | 14.06.2018 | Documents cited: | Search | [A]GB1040958 (WILLIAM BLYTHE AND COMPANY LTD) [A] 1-15* the whole document *; | [IY]US3943270 (NEU MAX GERHARD, et al) [I] 1,4,9 * the whole document * [Y] 1-15; | [YA]WO9504607 (FERRO TECH INC [US], et al) [Y] 1,4-15 * page 30 - page 34; claims 37-48 * * page 19 - page 20 * * page 23 - page 24; example 6 * * page 11 * [A] 2,3; | [YD]JP2001049414 (NIPPON STEEL CORP) [YD] 1-15 * the whole document *; | [YA]EP1209245 (GALVAPOWER GROUP N V [BE]) [Y] 3-15 * the whole document * [A] 2 | Examination | EP2725115 | EP2725114 | by applicant | EP0488423 | JP2001049414 | EP1158069 | WO0242512 | WO03057940 | WO2007146161 | US7560494 | CN101948990 | WO2011009999 | EP2281912 |