EP2746672 - Hob comprising a single temperature-detection means [Right-click to bookmark this link] | |||
Former [2014/26] | Hob comprising a temperature-detection means | ||
[2016/41] | Status | No opposition filed within time limit Status updated on 09.02.2018 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 03.03.2017 | ||
Former | Grant of patent is intended Status updated on 07.11.2016 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Groupe Brandt 89-91 boulevard Franklin Roosevelt 92500 Rueil-Malmaison / FR | [2015/23] |
Former [2014/26] | For all designated states FagorBrandt SAS 89 bd Franklin Roosevelt 92500 Rueil-Malmaison / FR | Inventor(s) | 01 /
Alirol, Etienne 4, Impasse Louis le Vau 45380 La Chapelle Saint Mesmin / FR | 02 /
Andre, Xavier FagorBrandt SAS 6, rue du Gaigneau Appt. 202A 45380 La Chapelle Saint Mesmin / FR | 03 /
Boyer, Serge 4, impasse des Violettes 45760 Boigny Sur Bionne / FR | 04 /
Goumy, Cedric FagorBrandt SAS 2, Chemin Marpalu 45190 Tavers / FR | [2014/26] | Application number, filing date | 13197144.2 | 13.12.2013 | [2014/26] | Priority number, date | FR20120003626 | 20.12.2012 Original published format: FR 1203626 | [2014/26] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP2746672 | Date: | 25.06.2014 | Language: | FR | [2014/26] | Type: | B1 Patent specification | No.: | EP2746672 | Date: | 05.04.2017 | Language: | FR | [2017/14] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.05.2014 | Classification | IPC: | F24C15/10, H05B6/06, F24C7/08, H05B6/12 | [2016/45] | CPC: |
F24C7/082 (EP);
F24C15/101 (EP);
H05B6/062 (EP);
H05B6/1263 (EP);
H05B2206/022 (EP);
H05B2213/07 (EP)
|
Former IPC [2016/41] | H05B6/06, F24C7/08, H05B6/12 | ||
Former IPC [2014/26] | F24C7/08, H05B6/12 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/14] |
Former [2014/26] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Kochfeld mit einem einzigen Mittel zur Temperaturerkennung | [2016/45] | English: | Hob comprising a single temperature-detection means | [2016/41] | French: | Table de cuisson comprenant un unique moyen de détection de température | [2016/41] |
Former [2014/26] | Kochfeld, das ein Mittel zur Temperaturerkennung umfasst | ||
Former [2014/26] | Hob comprising a temperature-detection means | ||
Former [2014/26] | Table de cuisson comprenant un moyen de détection de température | Examination procedure | 22.12.2014 | Amendment by applicant (claims and/or description) | 22.12.2014 | Examination requested [2015/07] | 08.11.2016 | Communication of intention to grant the patent | 24.02.2017 | Fee for grant paid | 24.02.2017 | Fee for publishing/printing paid | 24.02.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.11.2016 | Opposition(s) | 08.01.2018 | No opposition filed within time limit [2018/11] | Fees paid | Renewal fee | 22.12.2015 | Renewal fee patent year 03 | 27.12.2016 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Stay/Interruption | 11.04.2014 | Interruption of proceedings. Reason: legal prevention of applicant | [2015/17] | 01.07.2015 | Resumption of proceedings | [2015/22] | 11.04.2014 | Interruption of proceedings. Reason: legal prevention of applicant | [2015/22] | Rights in Rem or Legal Means of Execution | ID: | 01 | For: | AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR | Date: | 30.09.2015 | [2015/46] | Lapses during opposition Tooltip | HU | 13.12.2013 | AL | 05.04.2017 | AT | 05.04.2017 | CY | 05.04.2017 | CZ | 05.04.2017 | DK | 05.04.2017 | EE | 05.04.2017 | FI | 05.04.2017 | HR | 05.04.2017 | LT | 05.04.2017 | LV | 05.04.2017 | MC | 05.04.2017 | MK | 05.04.2017 | MT | 05.04.2017 | NL | 05.04.2017 | PL | 05.04.2017 | PT | 05.04.2017 | RO | 05.04.2017 | RS | 05.04.2017 | SE | 05.04.2017 | SI | 05.04.2017 | SK | 05.04.2017 | SM | 05.04.2017 | TR | 05.04.2017 | BG | 05.07.2017 | NO | 05.07.2017 | GR | 06.07.2017 | IS | 05.08.2017 | IE | 13.12.2017 | LU | 13.12.2017 | BE | 31.12.2017 | CH | 31.12.2017 | LI | 31.12.2017 | [2020/34] |
Former [2020/28] | HU | 13.12.2013 | |
AT | 05.04.2017 | ||
CY | 05.04.2017 | ||
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
MC | 05.04.2017 | ||
MK | 05.04.2017 | ||
MT | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
PT | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SI | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
TR | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
IE | 13.12.2017 | ||
LU | 13.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2020/15] | HU | 13.12.2013 | |
AT | 05.04.2017 | ||
CY | 05.04.2017 | ||
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
MC | 05.04.2017 | ||
MK | 05.04.2017 | ||
MT | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SI | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
TR | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
IE | 13.12.2017 | ||
LU | 13.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2019/51] | HU | 13.12.2013 | |
AT | 05.04.2017 | ||
CY | 05.04.2017 | ||
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
MC | 05.04.2017 | ||
MK | 05.04.2017 | ||
MT | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SI | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
IE | 13.12.2017 | ||
LU | 13.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2019/46] | HU | 13.12.2013 | |
AT | 05.04.2017 | ||
CY | 05.04.2017 | ||
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
MC | 05.04.2017 | ||
MT | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SI | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
IE | 13.12.2017 | ||
LU | 13.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2019/31] | HU | 13.12.2013 | |
AT | 05.04.2017 | ||
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
MC | 05.04.2017 | ||
MT | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SI | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
IE | 13.12.2017 | ||
LU | 13.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2019/30] | AT | 05.04.2017 | |
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
MC | 05.04.2017 | ||
MT | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SI | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
IE | 13.12.2017 | ||
LU | 13.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2018/52] | AT | 05.04.2017 | |
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
MT | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SI | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
IE | 13.12.2017 | ||
LU | 13.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2018/50] | AT | 05.04.2017 | |
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
MT | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SI | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
IE | 13.12.2017 | ||
LU | 13.12.2017 | ||
BE | 31.12.2017 | ||
Former [2018/45] | AT | 05.04.2017 | |
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
MT | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SI | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
IE | 13.12.2017 | ||
LU | 13.12.2017 | ||
Former [2018/43] | AT | 05.04.2017 | |
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
MT | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SI | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
LU | 13.12.2017 | ||
Former [2018/25] | AT | 05.04.2017 | |
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SI | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
Former [2018/11] | AT | 05.04.2017 | |
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SK | 05.04.2017 | ||
SM | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
Former [2018/10] | AT | 05.04.2017 | |
CZ | 05.04.2017 | ||
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RO | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
SK | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
Former [2018/09] | AT | 05.04.2017 | |
DK | 05.04.2017 | ||
EE | 05.04.2017 | ||
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
Former [2017/50] | AT | 05.04.2017 | |
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
LV | 05.04.2017 | ||
NL | 05.04.2017 | ||
PL | 05.04.2017 | ||
RS | 05.04.2017 | ||
SE | 05.04.2017 | ||
BG | 05.07.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
Former [2017/49] | AT | 05.04.2017 | |
FI | 05.04.2017 | ||
HR | 05.04.2017 | ||
LT | 05.04.2017 | ||
NL | 05.04.2017 | ||
NO | 05.07.2017 | ||
GR | 06.07.2017 | ||
IS | 05.08.2017 | ||
Former [2017/48] | NL | 05.04.2017 | Documents cited: | Search | [Y]JP2011044374 (MITSUBISHI ELECTRIC CORP, et al) [Y] 1-6 * paragraphs [0032] - [0034]; figures 2,22 *; | [Y]JP3395509B (MATSUSHITA ELECTRIC IND CO LTD) [Y] 1-6 * paragraphs [0004] , [0014] , [0019]; figure 5 *; | [A]JPH11297461 (MATSUSHITA ELECTRIC IND CO LTD) [A] 1 * the whole document *; | [A]JP2011018571 (PANASONIC CORP) [A] 1 * the whole document * |