EP2712236 - Method and arrangement in a telecommunication system for neighbour cell measurements [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.05.2018 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 09.06.2017 | ||
Former | Grant of patent is intended Status updated on 09.03.2017 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): CY | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2017/28] |
Former [2014/13] | For all designated states Telefonaktiebolaget L M Ericsson AB (Publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
Kazmi, Muhammad Svartviksslingan 110 SE-167 39 BROMMA / SE | 02 /
Furuskär, Anders Upplandsgatan 94 SE-113 44 STOCKHOLM / SE | [2014/13] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2017/28] |
Former [2014/13] | Kühn, Friedrich Heinrich Ericsson AB Patent Unit Kista RAN 1 Torshamnsgatan 23 164 80 Stockholm / SE | Application number, filing date | 13199061.6 | 04.02.2008 | [2014/13] | Priority number, date | SE20070000286 | 05.02.2007 Original published format: SE 0700286 | [2014/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2712236 | Date: | 26.03.2014 | Language: | EN | [2014/13] | Type: | B1 Patent specification | No.: | EP2712236 | Date: | 12.07.2017 | Language: | EN | [2017/28] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.02.2014 | Classification | IPC: | H04W36/30, // H04W48/16, H04W36/00 | [2014/13] | CPC: |
H04W36/0058 (EP,US);
H04B17/00 (KR);
H04W24/02 (EP,KR,US);
H04B17/30 (US);
H04W24/10 (KR);
H04W36/30 (US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2014/13] | Title | German: | Verfahren und Anordnung in einem Telekommunikationssystem für Nachbarzellmessungen | [2014/13] | English: | Method and arrangement in a telecommunication system for neighbour cell measurements | [2014/13] | French: | Procédé et agencement dans un système de télécommunication pour des mesures de cellules voisines | [2017/09] |
Former [2014/13] | Procédé et agencement dans un système de télécommunication pour des MESURES DE CELLULES VOISINES | Examination procedure | 20.12.2013 | Examination requested [2014/13] | 30.09.2014 | Amendment by applicant (claims and/or description) | 14.10.2014 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 10.03.2017 | Communication of intention to grant the patent | 30.05.2017 | Fee for grant paid | 30.05.2017 | Fee for publishing/printing paid | 30.05.2017 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP08712778.3 / EP2115909 | Opposition(s) | 13.04.2018 | No opposition filed within time limit [2018/25] | Request for further processing for: | The application is deemed to be withdrawn due to failure to indicate the wish to proceed further with the application | 21.10.2014 | Request for further processing filed | 21.10.2014 | Full payment received (date of receipt of payment) Request granted | 11.11.2014 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 21.10.2014 | Request for further processing filed | 21.10.2014 | Full payment received (date of receipt of payment) Request granted | 11.11.2014 | Decision despatched | Fees paid | Renewal fee | 20.12.2013 | Renewal fee patent year 03 | 20.12.2013 | Renewal fee patent year 04 | 20.12.2013 | Renewal fee patent year 05 | 20.12.2013 | Renewal fee patent year 06 | 27.02.2014 | Renewal fee patent year 07 | 26.02.2015 | Renewal fee patent year 08 | 26.02.2016 | Renewal fee patent year 09 | 27.02.2017 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 12.07.2017 | CY | 12.07.2017 | CZ | 12.07.2017 | DK | 12.07.2017 | EE | 12.07.2017 | HR | 12.07.2017 | LT | 12.07.2017 | LV | 12.07.2017 | MC | 12.07.2017 | PL | 12.07.2017 | PT | 12.07.2017 | RO | 12.07.2017 | SI | 12.07.2017 | SK | 12.07.2017 | BG | 12.10.2017 | NO | 12.10.2017 | IS | 12.11.2017 | IE | 04.02.2018 | LU | 04.02.2018 | MT | 04.02.2018 | [2020/31] |
Former [2020/27] | AT | 12.07.2017 | |
CZ | 12.07.2017 | ||
DK | 12.07.2017 | ||
EE | 12.07.2017 | ||
HR | 12.07.2017 | ||
LT | 12.07.2017 | ||
LV | 12.07.2017 | ||
MC | 12.07.2017 | ||
PL | 12.07.2017 | ||
PT | 12.07.2017 | ||
RO | 12.07.2017 | ||
SI | 12.07.2017 | ||
SK | 12.07.2017 | ||
BG | 12.10.2017 | ||
NO | 12.10.2017 | ||
IS | 12.11.2017 | ||
IE | 04.02.2018 | ||
LU | 04.02.2018 | ||
MT | 04.02.2018 | ||
Former [2020/08] | AT | 12.07.2017 | |
CZ | 12.07.2017 | ||
DK | 12.07.2017 | ||
EE | 12.07.2017 | ||
HR | 12.07.2017 | ||
LT | 12.07.2017 | ||
LV | 12.07.2017 | ||
MC | 12.07.2017 | ||
PL | 12.07.2017 | ||
RO | 12.07.2017 | ||
SI | 12.07.2017 | ||
SK | 12.07.2017 | ||
BG | 12.10.2017 | ||
NO | 12.10.2017 | ||
IS | 12.11.2017 | ||
IE | 04.02.2018 | ||
LU | 04.02.2018 | ||
MT | 04.02.2018 | ||
Former [2019/09] | AT | 12.07.2017 | |
CZ | 12.07.2017 | ||
DK | 12.07.2017 | ||
EE | 12.07.2017 | ||
HR | 12.07.2017 | ||
LT | 12.07.2017 | ||
LV | 12.07.2017 | ||
MC | 12.07.2017 | ||
PL | 12.07.2017 | ||
RO | 12.07.2017 | ||
SI | 12.07.2017 | ||
SK | 12.07.2017 | ||
BG | 12.10.2017 | ||
NO | 12.10.2017 | ||
IS | 12.11.2017 | ||
IE | 04.02.2018 | ||
LU | 04.02.2018 | ||
Former [2018/52] | AT | 12.07.2017 | |
CZ | 12.07.2017 | ||
DK | 12.07.2017 | ||
EE | 12.07.2017 | ||
HR | 12.07.2017 | ||
LT | 12.07.2017 | ||
LV | 12.07.2017 | ||
MC | 12.07.2017 | ||
PL | 12.07.2017 | ||
RO | 12.07.2017 | ||
SI | 12.07.2017 | ||
SK | 12.07.2017 | ||
BG | 12.10.2017 | ||
NO | 12.10.2017 | ||
IS | 12.11.2017 | ||
LU | 04.02.2018 | ||
Former [2018/44] | AT | 12.07.2017 | |
CZ | 12.07.2017 | ||
DK | 12.07.2017 | ||
EE | 12.07.2017 | ||
HR | 12.07.2017 | ||
LT | 12.07.2017 | ||
LV | 12.07.2017 | ||
MC | 12.07.2017 | ||
PL | 12.07.2017 | ||
RO | 12.07.2017 | ||
SI | 12.07.2017 | ||
SK | 12.07.2017 | ||
BG | 12.10.2017 | ||
NO | 12.10.2017 | ||
IS | 12.11.2017 | ||
Former [2018/39] | AT | 12.07.2017 | |
CZ | 12.07.2017 | ||
DK | 12.07.2017 | ||
EE | 12.07.2017 | ||
HR | 12.07.2017 | ||
LT | 12.07.2017 | ||
LV | 12.07.2017 | ||
PL | 12.07.2017 | ||
RO | 12.07.2017 | ||
SI | 12.07.2017 | ||
SK | 12.07.2017 | ||
BG | 12.10.2017 | ||
NO | 12.10.2017 | ||
IS | 12.11.2017 | ||
Former [2018/24] | AT | 12.07.2017 | |
CZ | 12.07.2017 | ||
DK | 12.07.2017 | ||
EE | 12.07.2017 | ||
HR | 12.07.2017 | ||
LT | 12.07.2017 | ||
LV | 12.07.2017 | ||
PL | 12.07.2017 | ||
RO | 12.07.2017 | ||
SK | 12.07.2017 | ||
BG | 12.10.2017 | ||
NO | 12.10.2017 | ||
IS | 12.11.2017 | ||
Former [2018/21] | AT | 12.07.2017 | |
CZ | 12.07.2017 | ||
DK | 12.07.2017 | ||
HR | 12.07.2017 | ||
LT | 12.07.2017 | ||
LV | 12.07.2017 | ||
PL | 12.07.2017 | ||
BG | 12.10.2017 | ||
NO | 12.10.2017 | ||
IS | 12.11.2017 | ||
Former [2018/12] | AT | 12.07.2017 | |
HR | 12.07.2017 | ||
LT | 12.07.2017 | ||
LV | 12.07.2017 | ||
PL | 12.07.2017 | ||
BG | 12.10.2017 | ||
NO | 12.10.2017 | ||
IS | 12.11.2017 | ||
Former [2018/11] | AT | 12.07.2017 | |
HR | 12.07.2017 | ||
LT | 12.07.2017 | ||
PL | 12.07.2017 | ||
BG | 12.10.2017 | ||
NO | 12.10.2017 | ||
IS | 12.11.2017 | ||
Former [2018/10] | AT | 12.07.2017 | |
HR | 12.07.2017 | ||
LT | 12.07.2017 | ||
NO | 12.10.2017 | ||
Former [2018/07] | LT | 12.07.2017 | |
NO | 12.10.2017 | Documents cited: | Search | [A] - HUAWEI, "Some consideration for downlink channel quality measurements", 3GPP DRAFT; R4-060844, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20060821), vol. RAN WG4, no. Tallinn; 20060821, XP050175947 [A] 1-15 * the whole document * | [A] - ERICSSON, "E-UTRA Intra-frequency Measurement Configuration and Control", 3GPP DRAFT; R2-063228, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20061101), vol. RAN WG2, no. Riga, Latvia; 20061101, XP050132724 [A] 1-15 * page 1, paragraph 2 * * page 2, paragraph 4 * * page 3, paragraph 5 * | [XP] - ERICSSON, "Bandwidth of Mobility Related Measurements in E-UTRAN", 3GPP DRAFT; R1-071041, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070206), vol. RAN WG1, no. St. Louis, USA; 20070206, XP050105039 [XP] 1-15 * the whole document * | [XP] - ERICSSON, "Bandwidth of Mobility Related Measurements in E-UTRAN", 3GPP DRAFT; R4-070192, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070207), vol. RAN WG4, no. St. Louis, MO; 20070207, XP050176678 [XP] 1-15 * the whole document * | [IP] - "UE Measurement Bandwidth for Intra Frequency Measurements", 3GPP DRAFT; R3-072281 UE MEAS_BW_INTRAF_MEASUREMENTS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20071031), vol. RAN WG3, no. Jeju Island; 20071031, XP050163060 [IP] 1-15 * the whole document * | [IP] - "UE Measurement Bandwidth for Intra Frequency Measurements", 3GPP DRAFT; R2-074973, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20071112), vol. RAN WG2, no. Jeju; 20071112, XP050137463 [IP] 1-15 * the whole document * | [IP] - ERICSSON, "Measurement Bandwidth for Mobility related Measurements", 3GPP DRAFT; R1-071597, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070403), vol. RAN WG1, no. St. Julian; 20070403, XP050105527 [IP] 1,5,6,11,14,15 * the whole document * | [IP] - ERICSSON, "Measurement Bandwidth for Mobility related Measurements", 3GPP DRAFT; R4-070405, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070402), vol. RAN WG4, no. Sophia Antipolis, France; 20070402, XP050176895 [IP] 1,5,6,11,14,15 * the whole document * |