blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2712236

EP2712236 - Method and arrangement in a telecommunication system for neighbour cell measurements [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.05.2018
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  09.06.2017
FormerGrant of patent is intended
Status updated on  09.03.2017
Most recent event   Tooltip26.06.2020Lapse of the patent in a contracting state
New state(s): CY
published on 29.07.2020  [2020/31]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
[2017/28]
Former [2014/13]For all designated states
Telefonaktiebolaget L M Ericsson AB (Publ)
164 83 Stockholm / SE
Inventor(s)01 / Kazmi, Muhammad
Svartviksslingan 110
SE-167 39 BROMMA / SE
02 / Furuskär, Anders
Upplandsgatan 94
SE-113 44 STOCKHOLM / SE
 [2014/13]
Representative(s)Ericsson
Patent Development
Torshamnsgatan 21-23
164 80 Stockholm / SE
[2017/28]
Former [2014/13]Kühn, Friedrich Heinrich
Ericsson AB
Patent Unit Kista RAN 1
Torshamnsgatan 23
164 80 Stockholm / SE
Application number, filing date13199061.604.02.2008
[2014/13]
Priority number, dateSE2007000028605.02.2007         Original published format: SE 0700286
[2014/13]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2712236
Date:26.03.2014
Language:EN
[2014/13]
Type: B1 Patent specification 
No.:EP2712236
Date:12.07.2017
Language:EN
[2017/28]
Search report(s)(Supplementary) European search report - dispatched on:EP06.02.2014
ClassificationIPC:H04W36/30, // H04W48/16, H04W36/00
[2014/13]
CPC:
H04W36/0058 (EP,US); H04B17/00 (KR); H04W24/02 (EP,KR,US);
H04B17/30 (US); H04W24/10 (KR); H04W36/30 (US);
H04W36/0055 (EP,KR); H04W36/302 (EP,KR); H04W48/16 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2014/13]
TitleGerman:Verfahren und Anordnung in einem Telekommunikationssystem für Nachbarzellmessungen[2014/13]
English:Method and arrangement in a telecommunication system for neighbour cell measurements[2014/13]
French:Procédé et agencement dans un système de télécommunication pour des mesures de cellules voisines[2017/09]
Former [2014/13]Procédé et agencement dans un système de télécommunication pour des MESURES DE CELLULES VOISINES
Examination procedure20.12.2013Examination requested  [2014/13]
30.09.2014Amendment by applicant (claims and/or description)
14.10.2014Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
10.03.2017Communication of intention to grant the patent
30.05.2017Fee for grant paid
30.05.2017Fee for publishing/printing paid
30.05.2017Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP08712778.3  / EP2115909
Opposition(s)13.04.2018No opposition filed within time limit [2018/25]
Request for further processing for:The application is deemed to be withdrawn due to failure to indicate the wish to proceed further with the application
21.10.2014Request for further processing filed
21.10.2014Full payment received (date of receipt of payment)
Request granted
11.11.2014Decision despatched
The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
21.10.2014Request for further processing filed
21.10.2014Full payment received (date of receipt of payment)
Request granted
11.11.2014Decision despatched
Fees paidRenewal fee
20.12.2013Renewal fee patent year 03
20.12.2013Renewal fee patent year 04
20.12.2013Renewal fee patent year 05
20.12.2013Renewal fee patent year 06
27.02.2014Renewal fee patent year 07
26.02.2015Renewal fee patent year 08
26.02.2016Renewal fee patent year 09
27.02.2017Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT12.07.2017
CY12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
PL12.07.2017
PT12.07.2017
RO12.07.2017
SI12.07.2017
SK12.07.2017
BG12.10.2017
NO12.10.2017
IS12.11.2017
IE04.02.2018
LU04.02.2018
MT04.02.2018
[2020/31]
Former [2020/27]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
PL12.07.2017
PT12.07.2017
RO12.07.2017
SI12.07.2017
SK12.07.2017
BG12.10.2017
NO12.10.2017
IS12.11.2017
IE04.02.2018
LU04.02.2018
MT04.02.2018
Former [2020/08]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
PL12.07.2017
RO12.07.2017
SI12.07.2017
SK12.07.2017
BG12.10.2017
NO12.10.2017
IS12.11.2017
IE04.02.2018
LU04.02.2018
MT04.02.2018
Former [2019/09]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
PL12.07.2017
RO12.07.2017
SI12.07.2017
SK12.07.2017
BG12.10.2017
NO12.10.2017
IS12.11.2017
IE04.02.2018
LU04.02.2018
Former [2018/52]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
PL12.07.2017
RO12.07.2017
SI12.07.2017
SK12.07.2017
BG12.10.2017
NO12.10.2017
IS12.11.2017
LU04.02.2018
Former [2018/44]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
PL12.07.2017
RO12.07.2017
SI12.07.2017
SK12.07.2017
BG12.10.2017
NO12.10.2017
IS12.11.2017
Former [2018/39]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
PL12.07.2017
RO12.07.2017
SI12.07.2017
SK12.07.2017
BG12.10.2017
NO12.10.2017
IS12.11.2017
Former [2018/24]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
PL12.07.2017
RO12.07.2017
SK12.07.2017
BG12.10.2017
NO12.10.2017
IS12.11.2017
Former [2018/21]AT12.07.2017
CZ12.07.2017
DK12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
PL12.07.2017
BG12.10.2017
NO12.10.2017
IS12.11.2017
Former [2018/12]AT12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
PL12.07.2017
BG12.10.2017
NO12.10.2017
IS12.11.2017
Former [2018/11]AT12.07.2017
HR12.07.2017
LT12.07.2017
PL12.07.2017
BG12.10.2017
NO12.10.2017
IS12.11.2017
Former [2018/10]AT12.07.2017
HR12.07.2017
LT12.07.2017
NO12.10.2017
Former [2018/07]LT12.07.2017
NO12.10.2017
Documents cited:Search[A]  - HUAWEI, "Some consideration for downlink channel quality measurements", 3GPP DRAFT; R4-060844, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20060821), vol. RAN WG4, no. Tallinn; 20060821, XP050175947 [A] 1-15 * the whole document *
 [A]  - ERICSSON, "E-UTRA Intra-frequency Measurement Configuration and Control", 3GPP DRAFT; R2-063228, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20061101), vol. RAN WG2, no. Riga, Latvia; 20061101, XP050132724 [A] 1-15 * page 1, paragraph 2 * * page 2, paragraph 4 * * page 3, paragraph 5 *
 [XP]  - ERICSSON, "Bandwidth of Mobility Related Measurements in E-UTRAN", 3GPP DRAFT; R1-071041, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070206), vol. RAN WG1, no. St. Louis, USA; 20070206, XP050105039 [XP] 1-15 * the whole document *
 [XP]  - ERICSSON, "Bandwidth of Mobility Related Measurements in E-UTRAN", 3GPP DRAFT; R4-070192, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070207), vol. RAN WG4, no. St. Louis, MO; 20070207, XP050176678 [XP] 1-15 * the whole document *
 [IP]  - "UE Measurement Bandwidth for Intra Frequency Measurements", 3GPP DRAFT; R3-072281 UE MEAS_BW_INTRAF_MEASUREMENTS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20071031), vol. RAN WG3, no. Jeju Island; 20071031, XP050163060 [IP] 1-15 * the whole document *
 [IP]  - "UE Measurement Bandwidth for Intra Frequency Measurements", 3GPP DRAFT; R2-074973, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20071112), vol. RAN WG2, no. Jeju; 20071112, XP050137463 [IP] 1-15 * the whole document *
 [IP]  - ERICSSON, "Measurement Bandwidth for Mobility related Measurements", 3GPP DRAFT; R1-071597, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070403), vol. RAN WG1, no. St. Julian; 20070403, XP050105527 [IP] 1,5,6,11,14,15 * the whole document *
 [IP]  - ERICSSON, "Measurement Bandwidth for Mobility related Measurements", 3GPP DRAFT; R4-070405, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070402), vol. RAN WG4, no. Sophia Antipolis, France; 20070402, XP050176895 [IP] 1,5,6,11,14,15 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.