blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2806100

EP2806100 - Method for monitoring the drilling of a well using a floating drilling rig and associated monitoring system [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  17.03.2017
Database last updated on 07.06.2024
FormerGrant of patent is intended
Status updated on  01.12.2016
Most recent event   Tooltip17.03.2017Application deemed to be withdrawnpublished on 19.04.2017  [2017/16]
Applicant(s)For all designated states
Geoservices Equipements
127, avenue du Bois de la Pie Paris Nord II
95700 Roissy en France / FR
[2014/48]
Inventor(s)01 / Cadalen, Sébastien
133 rue Danielle Casanova
93300 Aubervilliers / FR
 [2014/48]
Representative(s)Rzaniak, Martin
Schlumberger
1, rue Henri Becquerel
B.P. 202
92142 Clamart / FR
[2014/48]
Application number, filing date13305675.424.05.2013
[2014/48]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2806100
Date:26.11.2014
Language:EN
[2014/48]
Search report(s)(Supplementary) European search report - dispatched on:EP22.10.2013
ClassificationIPC:E21B47/10, E21B49/00, E21B21/00, E21B21/08
[2014/48]
CPC:
E21B21/08 (EP,US); E21B21/001 (EP,US); E21B47/10 (EP,US);
E21B49/005 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/28]
Former [2014/48]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
TitleGerman:Verfahren zur Überwachung der Bohrung eines Bohrloches mithilfe einer schwimmenden Bohrplattform und zugehöriges Überwachungssystem[2014/48]
English:Method for monitoring the drilling of a well using a floating drilling rig and associated monitoring system[2014/48]
French:Procédé pour contrôler le forage d'un puits au moyen d'une installation de forage flottante et système de surveillance associé[2014/48]
Examination procedure22.05.2015Examination requested  [2015/28]
16.06.2016Communication of intention to grant the patent
27.10.2016Application deemed to be withdrawn, date of legal effect  [2017/16]
02.12.2016Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2017/16]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  16.06.2016
Fees paidRenewal fee
12.05.2015Renewal fee patent year 03
10.05.2016Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]US3910110  (JEFFERIES ROBERT KENNEDY, et al) [A] 1-14* the whole document *;
 [A]US4282939  (MAUS L DONALD, et al) [A] 1-14 * the whole document *;
 [A]EP0498128  (SCHLUMBERGER SERVICES PETROL [FR]) [A] 1-14 * the whole document *
by applicant   - F. ALCRUDO; P. GARCIA-NAVARRO; J.-M. SAVIRON, "Flux difference splitting for 1D open channel flow equations", INTERNATIONAL JOURNAL FOR NUMERICAL METHODS IN FLUIDS, (1992), vol. 14, pages 1008 - 1018
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.