EP2806100 - Method for monitoring the drilling of a well using a floating drilling rig and associated monitoring system [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 17.03.2017 Database last updated on 07.06.2024 | |
Former | Grant of patent is intended Status updated on 01.12.2016 | Most recent event Tooltip | 17.03.2017 | Application deemed to be withdrawn | published on 19.04.2017 [2017/16] | Applicant(s) | For all designated states Geoservices Equipements 127, avenue du Bois de la Pie Paris Nord II 95700 Roissy en France / FR | [2014/48] | Inventor(s) | 01 /
Cadalen, Sébastien 133 rue Danielle Casanova 93300 Aubervilliers / FR | [2014/48] | Representative(s) | Rzaniak, Martin Schlumberger 1, rue Henri Becquerel B.P. 202 92142 Clamart / FR | [2014/48] | Application number, filing date | 13305675.4 | 24.05.2013 | [2014/48] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2806100 | Date: | 26.11.2014 | Language: | EN | [2014/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.10.2013 | Classification | IPC: | E21B47/10, E21B49/00, E21B21/00, E21B21/08 | [2014/48] | CPC: |
E21B21/08 (EP,US);
E21B21/001 (EP,US);
E21B47/10 (EP,US);
E21B49/005 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/28] |
Former [2014/48] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | Verfahren zur Überwachung der Bohrung eines Bohrloches mithilfe einer schwimmenden Bohrplattform und zugehöriges Überwachungssystem | [2014/48] | English: | Method for monitoring the drilling of a well using a floating drilling rig and associated monitoring system | [2014/48] | French: | Procédé pour contrôler le forage d'un puits au moyen d'une installation de forage flottante et système de surveillance associé | [2014/48] | Examination procedure | 22.05.2015 | Examination requested [2015/28] | 16.06.2016 | Communication of intention to grant the patent | 27.10.2016 | Application deemed to be withdrawn, date of legal effect [2017/16] | 02.12.2016 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time [2017/16] | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.06.2016 | Fees paid | Renewal fee | 12.05.2015 | Renewal fee patent year 03 | 10.05.2016 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [A]US3910110 (JEFFERIES ROBERT KENNEDY, et al) [A] 1-14* the whole document *; | [A]US4282939 (MAUS L DONALD, et al) [A] 1-14 * the whole document *; | [A]EP0498128 (SCHLUMBERGER SERVICES PETROL [FR]) [A] 1-14 * the whole document * | by applicant | - F. ALCRUDO; P. GARCIA-NAVARRO; J.-M. SAVIRON, "Flux difference splitting for 1D open channel flow equations", INTERNATIONAL JOURNAL FOR NUMERICAL METHODS IN FLUIDS, (1992), vol. 14, pages 1008 - 1018 |