EP2828019 - DEVICE AND METHOD FOR CONTINUOUS CASTING OF A LARGE-FORMAT STEEL STRIP [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.08.2019 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 31.08.2018 | ||
Former | Grant of patent is intended Status updated on 31.05.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Primetals Technologies Austria GmbH Turmstraße 44 4031 Linz / AT | [2015/24] |
Former [2015/05] | For all designated states Siemens VAI Metals Technologies GmbH Turmstrasse 44 4031 Linz / AT | Inventor(s) | 01 /
KLUGE, Jens Karlsbader Straße 8 86551 Aichach / DE | 02 /
KOGLER, Hans-Peter Stifterstraße 17 4050 Traun / AT | 03 /
POEPPL, Johann Adalbert-Stifter-Straße 9 4202 Kirchschlag / AT | 04 /
SCHWARZ, Ernst Kleines Rodltal 17 4112 St. Gotthard / AT | 05 /
SHAN, Guoxin Am Bindermichl 61 4020 Linz / AT | 06 /
THOENE, Heinrich Lortzinggasse 12 4020 Linz / AT | 07 /
WIMMER, Franz Schwaben 175 4752 Riedau / AT | [2018/40] |
Former [2015/05] | 01 /
KLUGE, Jens Karlsbaderstrasse 8 86551 Aichach / DE | ||
02 /
KOGLER, Hans-Peter Stifterstr. 17 4050 Traun / AT | |||
03 /
POEPPL, Johann Adalbert-Stifter-Strasse 9 A-4202 Kirchschlag / AT | |||
04 /
SCHWARZ, Ernst Kleines Rodltal 17 A-4112 St. Gotthard / AT | |||
05 /
SHAN, Guoxin Am Bindermichl 61 A-4020 Linz / AT | |||
06 /
THOENE, Heinrich Lortzinggasse 12 A-4020 Linz / AT | |||
07 /
WIMMER, Franz Pomedt 18 A-4752 Riedau / AT | Representative(s) | Metals@Linz Primetals Technologies Austria GmbH Intellectual Property Upstream IP UP Turmstraße 44 4031 Linz / AT | [2018/40] |
Former [2015/05] | Maier, Daniel Oliver Siemens AG Postfach 22 16 34 80506 München / DE | Application number, filing date | 13700386.9 | 15.01.2013 | [2018/40] | WO2013EP50622 | Priority number, date | AT20120050094 | 22.03.2012 Original published format: AT 500942012 | [2015/05] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2013139491 | Date: | 26.09.2013 | Language: | DE | [2013/39] | Type: | A1 Application with search report | No.: | EP2828019 | Date: | 28.01.2015 | Language: | DE | The application published by WIPO in one of the EPO official languages on 26.09.2013 takes the place of the publication of the European patent application. | [2015/05] | Type: | B1 Patent specification | No.: | EP2828019 | Date: | 03.10.2018 | Language: | DE | [2018/40] | Search report(s) | International search report - published on: | EP | 26.09.2013 | Classification | IPC: | B22D11/128, B22D11/14 | [2015/05] | CPC: |
B22D11/1281 (EP,AT);
B22D11/128 (KR,RU);
B22D11/041 (AT);
B22D11/14 (KR);
B22D11/141 (EP,AT)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN ZUM KONTINUIERLICHEN STRANGGIESSEN EINES GROSSFORMATIGEN STAHLSTRANGS | [2015/05] | English: | DEVICE AND METHOD FOR CONTINUOUS CASTING OF A LARGE-FORMAT STEEL STRIP | [2015/05] | French: | DISPOSITIF ET PROCÉDÉ DE COULÉE CONTINUE D'UNE BARRE D'ACIER DE GRANDES DIMENSIONS | [2015/05] | Entry into regional phase | 25.07.2014 | National basic fee paid | 25.07.2014 | Designation fee(s) paid | 25.07.2014 | Examination fee paid | Examination procedure | 25.07.2014 | Examination requested [2015/05] | 29.04.2015 | Amendment by applicant (claims and/or description) | 16.03.2016 | Despatch of a communication from the examining division (Time limit: M04) | 29.03.2016 | Reply to a communication from the examining division | 01.06.2018 | Communication of intention to grant the patent | 17.08.2018 | Fee for grant paid | 17.08.2018 | Fee for publishing/printing paid | 17.08.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.03.2016 | Opposition(s) | 04.07.2019 | No opposition filed within time limit [2019/37] | Fees paid | Renewal fee | 19.01.2015 | Renewal fee patent year 03 | 27.01.2016 | Renewal fee patent year 04 | 20.01.2017 | Renewal fee patent year 05 | 26.01.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.01.2013 | AL | 03.10.2018 | CY | 03.10.2018 | CZ | 03.10.2018 | DK | 03.10.2018 | EE | 03.10.2018 | ES | 03.10.2018 | FI | 03.10.2018 | HR | 03.10.2018 | LT | 03.10.2018 | LV | 03.10.2018 | MC | 03.10.2018 | MK | 03.10.2018 | MT | 03.10.2018 | NL | 03.10.2018 | PL | 03.10.2018 | RO | 03.10.2018 | RS | 03.10.2018 | SE | 03.10.2018 | SI | 03.10.2018 | SK | 03.10.2018 | SM | 03.10.2018 | TR | 03.10.2018 | BG | 03.01.2019 | NO | 03.01.2019 | GR | 04.01.2019 | AT | 15.01.2019 | GB | 15.01.2019 | IE | 15.01.2019 | LU | 15.01.2019 | BE | 31.01.2019 | FR | 31.01.2019 | IS | 03.02.2019 | PT | 03.02.2019 | [2022/31] |
Former [2021/32] | HU | 15.01.2013 | |
AL | 03.10.2018 | ||
CY | 03.10.2018 | ||
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
MC | 03.10.2018 | ||
MT | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SI | 03.10.2018 | ||
SK | 03.10.2018 | ||
SM | 03.10.2018 | ||
TR | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
AT | 15.01.2019 | ||
GB | 15.01.2019 | ||
IE | 15.01.2019 | ||
LU | 15.01.2019 | ||
BE | 31.01.2019 | ||
FR | 31.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2021/26] | AL | 03.10.2018 | |
CY | 03.10.2018 | ||
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
MC | 03.10.2018 | ||
MT | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SI | 03.10.2018 | ||
SK | 03.10.2018 | ||
SM | 03.10.2018 | ||
TR | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
AT | 15.01.2019 | ||
GB | 15.01.2019 | ||
IE | 15.01.2019 | ||
LU | 15.01.2019 | ||
BE | 31.01.2019 | ||
FR | 31.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2020/29] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
MC | 03.10.2018 | ||
MT | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SI | 03.10.2018 | ||
SK | 03.10.2018 | ||
SM | 03.10.2018 | ||
TR | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
AT | 15.01.2019 | ||
GB | 15.01.2019 | ||
IE | 15.01.2019 | ||
LU | 15.01.2019 | ||
BE | 31.01.2019 | ||
FR | 31.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2020/23] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
MC | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SI | 03.10.2018 | ||
SK | 03.10.2018 | ||
SM | 03.10.2018 | ||
TR | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
AT | 15.01.2019 | ||
GB | 15.01.2019 | ||
IE | 15.01.2019 | ||
LU | 15.01.2019 | ||
BE | 31.01.2019 | ||
FR | 31.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2020/17] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
MC | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SI | 03.10.2018 | ||
SK | 03.10.2018 | ||
SM | 03.10.2018 | ||
TR | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
GB | 15.01.2019 | ||
IE | 15.01.2019 | ||
LU | 15.01.2019 | ||
BE | 31.01.2019 | ||
FR | 31.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2020/09] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
MC | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SI | 03.10.2018 | ||
SK | 03.10.2018 | ||
SM | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
GB | 15.01.2019 | ||
IE | 15.01.2019 | ||
LU | 15.01.2019 | ||
BE | 31.01.2019 | ||
FR | 31.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2020/03] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
MC | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SI | 03.10.2018 | ||
SK | 03.10.2018 | ||
SM | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
GB | 15.01.2019 | ||
LU | 15.01.2019 | ||
BE | 31.01.2019 | ||
FR | 31.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2019/50] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
MC | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SI | 03.10.2018 | ||
SK | 03.10.2018 | ||
SM | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
LU | 15.01.2019 | ||
BE | 31.01.2019 | ||
FR | 31.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2019/49] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
MC | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SI | 03.10.2018 | ||
SK | 03.10.2018 | ||
SM | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
LU | 15.01.2019 | ||
FR | 31.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2019/44] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
MC | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SK | 03.10.2018 | ||
SM | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
LU | 15.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2019/40] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
MC | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SK | 03.10.2018 | ||
SM | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2019/37] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
EE | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RO | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
SM | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2019/34] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
DK | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2019/26] | AL | 03.10.2018 | |
CZ | 03.10.2018 | ||
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
IS | 03.02.2019 | ||
PT | 03.02.2019 | ||
Former [2019/25] | CZ | 03.10.2018 | |
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
RS | 03.10.2018 | ||
SE | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
IS | 03.02.2019 | ||
Former [2019/24] | CZ | 03.10.2018 | |
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
SE | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
GR | 04.01.2019 | ||
IS | 03.02.2019 | ||
Former [2019/23] | CZ | 03.10.2018 | |
ES | 03.10.2018 | ||
FI | 03.10.2018 | ||
HR | 03.10.2018 | ||
LT | 03.10.2018 | ||
LV | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
IS | 03.02.2019 | ||
Former [2019/22] | CZ | 03.10.2018 | |
FI | 03.10.2018 | ||
LT | 03.10.2018 | ||
NL | 03.10.2018 | ||
PL | 03.10.2018 | ||
BG | 03.01.2019 | ||
NO | 03.01.2019 | ||
IS | 03.02.2019 | ||
Former [2019/21] | FI | 03.10.2018 | |
LT | 03.10.2018 | ||
NL | 03.10.2018 | ||
NO | 03.01.2019 | ||
IS | 03.02.2019 | ||
Former [2019/20] | LT | 03.10.2018 | |
NL | 03.10.2018 | ||
NO | 03.01.2019 | ||
Former [2019/17] | NL | 03.10.2018 | Cited in | International search | [XDI]CH373869 (DEMAG AG [DE]) [XD] 10,14 * page 1, line 19 - page 3, line 18 * * figure 2 * [I] 1-3,6,12,16-18; | [A]US3375862 (STEPANOVITCH BOITCHENKO MIKHAI, et al) [A] 1-18 * the whole document *; | [A]FR1559859 (KONSTRUKTIONSBÜRO FÜR STAHL- UND WALZWERKE, SOCIETE FIVES LILLE CAIL) [A] 1-18 * the whole document *; | [A]DE3907124 (MANNESMANN AG [DE]) [A] 1-18 * the whole document *; | [A]JP2005186119 (NIPPON LIGHT METAL CO, et al) [A] 1-18 * the whole document *; | [A]WO2010057967 (SIEMENS VAI METALS TECH GMBH [AT], et al) [A] 1-18 * the whole document *; | [A]DE202010015499U (SIEMENS VAI METALS TECH GMBH [AT]) [A] 1-18 * the whole document *; | [A]CN102019391 (SHENYANG DONGFANG STEEL CO LTD) [A] 1-18 * the whole document *; | [AP]WO2012139968 (SMS SIEMAG AG [DE], et al) [AP] 1-18 * the whole document *; | [A] - MERZ M ET AL, "DIE NEUE SENKRECHTSTRANGGIESSANLAGE IM WERK WITTEN DER EDELSTAHL WITTEN-KREFELD GMBH", STAHL UND EISEN, VERLAG STAHLEISEN, DUSSELDORF, DE, (19970520), vol. 117, no. 5, ISSN 0340-4803, pages 83 - 86, XP000691181 [A] 1-18 * the whole document * | [A] - HARSTE K ET AL, "NEUBAU EINER VERTIKALSTRANGGIESSANLAGE BEI DER AG DER DILLINGER HUETTENWERKE", STAHL UND EISEN, VERLAG STAHLEISEN, DUSSELDORF, DE, (19971110), vol. 117, no. 11, ISSN 0340-4803, pages 73 - 79,153, XP000737187 [A] 1-18 * the whole document * | by applicant | CH373869 |