EP2809629 - COVERING MATERIAL FOR FLOORING AND WALLS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.09.2020 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 11.10.2019 | ||
Former | Grant of patent is intended Status updated on 26.06.2019 | ||
Former | Examination is in progress Status updated on 20.10.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Sika Technology AG Zugerstrasse 50 6340 Baar / CH | [2014/50] | Inventor(s) | 01 /
HILGENBRINK, Bernhard Karl Maximilian Kolbe Strasse 48 D-48565 Steinfurt-Borghorst / DE | [2014/50] | Representative(s) | Sika Patent Attorneys C/o Sika Technology AG Corp. IP Dept. Tüffenwies 16 8048 Zürich / CH | [N/P] |
Former [2014/50] | Sika Patent Attorneys c/o Sika Technology AG Corp. IP Dept. Tüffenwies 16 Postfach 8048 Zürich / CH | Application number, filing date | 13701471.8 | 29.01.2013 | [2019/46] | WO2013EP51610 | Priority number, date | EP20120153427 | 01.02.2012 Original published format: EP 12153427 | [2014/50] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013113667 | Date: | 08.08.2013 | Language: | EN | [2013/32] | Type: | A1 Application with search report | No.: | EP2809629 | Date: | 10.12.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.08.2013 takes the place of the publication of the European patent application. | [2014/50] | Type: | B1 Patent specification | No.: | EP2809629 | Date: | 13.11.2019 | Language: | EN | [2019/46] | Search report(s) | International search report - published on: | EP | 08.08.2013 | Classification | IPC: | C04B41/62, E04F13/08, E04F15/02 | [2014/50] | CPC: |
E04F15/087 (EP,US);
C04B41/009 (EP,US);
C04B41/4572 (EP,US);
C04B41/62 (EP,US);
E04F13/0885 (EP,US);
E04F13/142 (EP,US);
E04F15/0215 (EP,US);
C04B2111/00491 (EP,US);
C04B2111/27 (EP,US);
E04F13/0887 (EP,US);
E04F15/02155 (EP,US);
Y10T428/264 (EP,US);
| C-Set: |
C04B41/009, C04B33/00 (EP,US);
C04B41/4572, C04B41/47 (US,EP);
C04B41/4572, C04B41/4846 (US,EP);
C04B41/4572, C04B41/4961 (US,EP) | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/50] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ABDECKUNGSMATERIAL FÜR BÖDEN UND WÄNDE | [2018/43] | English: | COVERING MATERIAL FOR FLOORING AND WALLS | [2014/50] | French: | MATÉRIAU DE COUVERTURE POUR PLANCHERS ET MURS | [2018/43] |
Former [2014/50] | ABDECKUNGSMATERIAL FÜR BODENBELÄGE UND WÄNDE | ||
Former [2014/50] | MATÉRIAU DE PAREMENT POUR REVÊTEMENT DE SOL ET MURS | Entry into regional phase | 01.09.2014 | National basic fee paid | 01.09.2014 | Designation fee(s) paid | 01.09.2014 | Examination fee paid | Examination procedure | 01.09.2014 | Examination requested [2014/50] | 30.04.2015 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 29.06.2015 | Amendment by applicant (claims and/or description) | 19.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 21.02.2018 | Reply to a communication from the examining division | 13.03.2018 | Despatch of a communication from the examining division (Time limit: M06) | 06.09.2018 | Reply to a communication from the examining division | 28.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 28.01.2019 | Reply to a communication from the examining division | 27.06.2019 | Communication of intention to grant the patent | 01.10.2019 | Fee for grant paid | 01.10.2019 | Fee for publishing/printing paid | 01.10.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.10.2017 | Opposition(s) | 14.08.2020 | No opposition filed within time limit [2020/43] | Request for further processing for: | 29.06.2015 | Request for further processing filed | 29.06.2015 | Full payment received (date of receipt of payment) Request granted | 10.07.2015 | Decision despatched | Fees paid | Renewal fee | 02.02.2015 | Renewal fee patent year 03 | 01.02.2016 | Renewal fee patent year 04 | 31.01.2017 | Renewal fee patent year 05 | 31.01.2018 | Renewal fee patent year 06 | 31.01.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.01.2013 | AL | 13.11.2019 | AT | 13.11.2019 | CY | 13.11.2019 | CZ | 13.11.2019 | DK | 13.11.2019 | EE | 13.11.2019 | FI | 13.11.2019 | HR | 13.11.2019 | LT | 13.11.2019 | LV | 13.11.2019 | MC | 13.11.2019 | MK | 13.11.2019 | MT | 13.11.2019 | PL | 13.11.2019 | RO | 13.11.2019 | RS | 13.11.2019 | SI | 13.11.2019 | SK | 13.11.2019 | SM | 13.11.2019 | TR | 13.11.2019 | IE | 29.01.2020 | LU | 29.01.2020 | BE | 31.01.2020 | CH | 31.01.2020 | LI | 31.01.2020 | BG | 13.02.2020 | NO | 13.02.2020 | GR | 14.02.2020 | IS | 13.03.2020 | PT | 13.03.2020 | [2022/32] |
Former [2022/27] | HU | 29.01.2013 | |
AL | 13.11.2019 | ||
AT | 13.11.2019 | ||
CY | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
MT | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
TR | 13.11.2019 | ||
IE | 29.01.2020 | ||
LU | 29.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2022/26] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
TR | 13.11.2019 | ||
IE | 29.01.2020 | ||
LU | 29.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2021/08] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
IE | 29.01.2020 | ||
LU | 29.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/51] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
LU | 29.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/46] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
LU | 29.01.2020 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/39] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/37] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/36] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/35] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/32] | AL | 13.11.2019 | |
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
PL | 13.11.2019 | ||
RS | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/25] | FI | 13.11.2019 | |
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
PL | 13.11.2019 | ||
RS | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/24] | FI | 13.11.2019 | |
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
PL | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/23] | FI | 13.11.2019 | |
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
PL | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
PT | 13.03.2020 | ||
Former [2020/22] | FI | 13.11.2019 | |
LT | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
PT | 13.03.2020 | ||
Former [2020/21] | NO | 13.02.2020 | Cited in | International search | [AD]DE242472 (BECKER ANTON) [AD] 1-16 * claim - *; | [AD]JPH09295884 (MANSEE KK) [AD] 12,13* abstract *; | [YDA]FR2866375 (SOPREMA [FR]) [YD] 11-13 * claim - * [A] 1-10,14-16; | [XDY]DE102006026699 (WACKER POLYMER SYSTEMS GMBH [DE]) [XD] 1-10,14-16 * claim - * * example - * * table 1 * * paragraph [0024] * * paragraph [0034] * * paragraphs [0035] , [0048] * [Y] 11-13 | Examination | JPS5247808 | US4350736 | EP1659106 | - DATABASE WPI, 0, Derwent World Patents Index, vol. 1977, no. 21, Database accession no. 1977-37282Y, & JPS5247808 A 19770416 (AOBA KAGAKU KOGYO KK) | by applicant | DE242472 | EP0043714 | JPH09295884 | EP0884291 | US6127298 | DE10159337 | WO2004101464 | FR2866375 | DE102006026699 |