blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2810421

EP2810421 - SYSTEM AND METHOD TO REDUCE STREAM START-UP DELAY FOR ADAPTIVE STREAMING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.04.2021
Database last updated on 04.06.2024
FormerThe patent has been granted
Status updated on  08.05.2020
FormerGrant of patent is intended
Status updated on  06.01.2020
FormerExamination is in progress
Status updated on  09.03.2018
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Cisco Technology, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706 / US
[2018/34]
Former [2014/50]For all designated states
CiscoTechnology Inc.
SJC/10/2/1 170 West Tasman Drive
San Jose, CA 95134-1706 / US
Inventor(s)01 / ORAN, David R.
7 Ladyslipper Lane
Acton, Massachusetts 01720 / US
02 / BEGEN, Ali C.
613-1985 Richmond Street
London, Ontario N5X 0A6 / CA
03 / GAHM, Joshua B.
55 Washington Park
Newtonville, Massachusetts 02460 / US
 [2014/50]
Representative(s)Vienne, Aymeric Charles Emile, et al
Mathys & Squire The Shard
32 London Bridge Street
London SE1 9SG / GB
[N/P]
Former [2014/50]Vienne, Aymeric Charles Emile, et al
Mathys & Squire LLP The Shard
32 London Bridge Street
London SE1 9SG / GB
Application number, filing date13704327.931.01.2013
[2020/24]
WO2013US24197
Priority number, dateUS20121336393301.02.2012         Original published format: US201213363933
[2014/50]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013116554
Date:08.08.2013
Language:EN
[2013/32]
Type: A1 Application with search report 
No.:EP2810421
Date:10.12.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 08.08.2013 takes the place of the publication of the European patent application.
[2014/50]
Type: B1 Patent specification 
No.:EP2810421
Date:10.06.2020
Language:EN
[2020/24]
Search report(s)International search report - published on:EP08.08.2013
ClassificationIPC:H04L29/08, H04L29/06, H04N21/44, H04N21/2662, H04N21/238, H04N21/6377
[2020/02]
CPC:
H04N21/2662 (EP,US); H04L67/61 (EP,US); H04N21/23805 (EP,US);
H04N21/44004 (EP,US); H04N21/6377 (EP,US); H04L65/613 (EP,US)
Former IPC [2014/50]H04L29/08, H04L29/06, H04N21/44, H04N21/2662
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/50]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SYSTEM UND VERFAHREN ZUR VERRINGERUNG VON STREAM-STARTVERZÖGERUNG FÜR ADAPTIVES STREAMING[2014/50]
English:SYSTEM AND METHOD TO REDUCE STREAM START-UP DELAY FOR ADAPTIVE STREAMING[2014/50]
French:SYSTÈME ET PROCÉDÉ DE RÉDUCTION DE RETARD DE DÉMARRAGE DE FLUX POUR DIFFUSION EN CONTINU ADAPTATIVE[2014/50]
Entry into regional phase28.08.2014National basic fee paid 
28.08.2014Designation fee(s) paid 
28.08.2014Examination fee paid 
Examination procedure28.08.2014Amendment by applicant (claims and/or description)
28.08.2014Examination requested  [2014/50]
13.03.2018Despatch of a communication from the examining division (Time limit: M04)
10.07.2018Reply to a communication from the examining division
07.01.2020Communication of intention to grant the patent
04.05.2020Fee for grant paid
04.05.2020Fee for publishing/printing paid
04.05.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  13.03.2018
Opposition(s)11.03.2021No opposition filed within time limit [2021/20]
Fees paidRenewal fee
27.01.2015Renewal fee patent year 03
27.01.2016Renewal fee patent year 04
27.01.2017Renewal fee patent year 05
29.01.2018Renewal fee patent year 06
28.01.2019Renewal fee patent year 07
27.01.2020Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.01.2013
AL10.06.2020
AT10.06.2020
CY10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
MK10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
BE31.01.2021
CH31.01.2021
IE31.01.2021
LI31.01.2021
LU31.01.2021
[2024/22]
Former [2023/30]HU31.01.2013
AL10.06.2020
AT10.06.2020
CY10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
BE31.01.2021
CH31.01.2021
IE31.01.2021
LI31.01.2021
LU31.01.2021
Former [2023/27]HU31.01.2013
AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
BE31.01.2021
CH31.01.2021
IE31.01.2021
LI31.01.2021
LU31.01.2021
Former [2022/33]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
BE31.01.2021
CH31.01.2021
IE31.01.2021
LI31.01.2021
LU31.01.2021
Former [2022/07]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
CH31.01.2021
IE31.01.2021
LI31.01.2021
LU31.01.2021
Former [2021/52]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
CH31.01.2021
LI31.01.2021
LU31.01.2021
Former [2021/43]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
LU31.01.2021
Former [2021/40]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/24]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/20]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/10]AL10.06.2020
AT10.06.2020
CZ10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/09]AL10.06.2020
AT10.06.2020
CZ10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
PT12.10.2020
Former [2021/04]AL10.06.2020
FI10.06.2020
HR10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
RS10.06.2020
SE10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
Former [2021/01]FI10.06.2020
HR10.06.2020
LT10.06.2020
LV10.06.2020
RS10.06.2020
SE10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
Former [2020/51]FI10.06.2020
HR10.06.2020
LT10.06.2020
LV10.06.2020
RS10.06.2020
SE10.06.2020
NO10.09.2020
GR11.09.2020
Former [2020/50]FI10.06.2020
HR10.06.2020
LT10.06.2020
LV10.06.2020
SE10.06.2020
NO10.09.2020
GR11.09.2020
Former [2020/48]FI10.06.2020
LT10.06.2020
SE10.06.2020
NO10.09.2020
Former [2020/47]LT10.06.2020
NO10.09.2020
Cited inInternational search[X]US2003236904  (WALPOLE JONATHAN [US], et al) [X] 1-20 * figures 1, 4, 5, 6, 11, 19, 20 * * paragraph [0019] - paragraph [0025] * * paragraph [0047] - paragraph [0050] * * paragraph [0053] * * paragraph [0064] - paragraph [0072] * * paragraph [0079] - paragraph [0082] * * paragraph [0109] - paragraph [0236] *;
 [XA]EP1622385  (MICROSOFT CORP [US]) [X] 1,2,4-12,14-20 * figures 1, 2, 8-10 * * paragraph [0013] - paragraph [0027] * * paragraph [0042] - paragraph [0053] *[A] 3,13
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.