EP2809506 - DEVICE AND METHOD FOR PREPARING PACKAGING BOXES WITH VERTICAL UNSTACKING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.07.2021 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 26.05.2017 | ||
Former | Grant of patent is intended Status updated on 02.02.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states DS Smith Packaging France Tour Initiale 1 Terrasse Bellini 92800 Puteaux / FR | [2017/39] |
Former [2014/50] | For all designated states Otor 8 terrasse Bellini 92800 Puteaux / FR | Inventor(s) | 01 /
BRUNEAU, Thomas 6, rue Prairial 21300 Chenove / FR | 02 /
MENEGAZZI, Franck 59, rue Jeannin 21000 Dijon / FR | [2014/50] | Representative(s) | Benech, Frédéric Cabinet Benech 15, rue d'Astorg 75008 Paris / FR | [N/P] |
Former [2014/50] | Benech, Frédéric Cabinet Benech 146-150, Avenue des Champs-Elysées 75008 Paris / FR | Application number, filing date | 13706623.9 | 01.02.2013 | [2017/26] | WO2013FR50226 | Priority number, date | FR20120000339 | 03.02.2012 Original published format: FR 1200339 | [2014/50] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2013114061 | Date: | 08.08.2013 | Language: | FR | [2013/32] | Type: | A1 Application with search report | No.: | EP2809506 | Date: | 10.12.2014 | Language: | FR | The application published by WIPO in one of the EPO official languages on 08.08.2013 takes the place of the publication of the European patent application. | [2014/50] | Type: | B1 Patent specification | No.: | EP2809506 | Date: | 28.06.2017 | Language: | FR | [2017/26] | Search report(s) | International search report - published on: | EP | 08.08.2013 | Classification | IPC: | B65H3/08, B65H3/14, B65H3/50, B65H3/54, B65H3/56, B65H3/26, B65H31/30, B31B50/02 | [2017/08] | CPC: |
B31B50/044 (EP,US);
B31B50/28 (EP,US);
B31B50/74 (EP,US);
B65H1/14 (EP,US);
B65H3/0816 (EP,US);
B31B2100/00 (EP,US);
B31B2100/0022 (EP,US);
B31B2110/35 (EP,US);
B31B50/022 (EP,US);
B31B50/046 (EP,US);
B31B50/06 (EP,US);
B31B50/066 (EP,US);
B65H2511/20 (EP,US);
B65H2513/42 (EP,US);
B65H2555/30 (EP,US);
| C-Set: |
B65H2511/20, B65H2220/01 (EP,US);
B65H2513/42, B65H2220/02, B65H2220/03, B65H2220/11 (US,EP) |
Former IPC [2014/50] | B31B1/02, B65H3/08, B65H3/14, B65H3/50, B65H3/54, B65H3/56, B65H3/26, B31B1/00, B65H31/30 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/50] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN ZUR HERSTELLUNG VON VERPACKUNGSSCHACHTELN MIT VERTIKALER ENTSTAPELN | [2014/50] | English: | DEVICE AND METHOD FOR PREPARING PACKAGING BOXES WITH VERTICAL UNSTACKING | [2014/50] | French: | DISPOSITIF ET PROCÉDÉ DE FORMATION DE BOITES D'EMBALLAGES AVEC DÉPILAGE VERTICAL | [2014/50] | Entry into regional phase | 01.08.2014 | National basic fee paid | 01.08.2014 | Designation fee(s) paid | 01.08.2014 | Examination fee paid | Examination procedure | 01.08.2014 | Examination requested [2014/50] | 06.03.2015 | Amendment by applicant (claims and/or description) | 29.06.2016 | Despatch of a communication from the examining division (Time limit: M04) | 02.09.2016 | Reply to a communication from the examining division | 03.02.2017 | Communication of intention to grant the patent | 19.05.2017 | Fee for grant paid | 19.05.2017 | Fee for publishing/printing paid | 19.05.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.06.2016 | Opposition(s) | 29.03.2018 | No opposition filed within time limit [2018/23] | Fees paid | Renewal fee | 24.02.2015 | Renewal fee patent year 03 | 25.02.2016 | Renewal fee patent year 04 | 23.02.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.02.2013 | AL | 28.06.2017 | AT | 28.06.2017 | CY | 28.06.2017 | CZ | 28.06.2017 | DK | 28.06.2017 | EE | 28.06.2017 | FI | 28.06.2017 | HR | 28.06.2017 | LT | 28.06.2017 | LV | 28.06.2017 | MC | 28.06.2017 | MK | 28.06.2017 | MT | 28.06.2017 | PL | 28.06.2017 | PT | 28.06.2017 | RO | 28.06.2017 | RS | 28.06.2017 | SE | 28.06.2017 | SI | 28.06.2017 | SK | 28.06.2017 | SM | 28.06.2017 | TR | 28.06.2017 | BG | 28.09.2017 | NO | 28.09.2017 | GR | 29.09.2017 | IS | 28.10.2017 | GB | 01.02.2018 | IE | 01.02.2018 | LU | 01.02.2018 | BE | 28.02.2018 | CH | 28.02.2018 | LI | 28.02.2018 | [2020/34] |
Former [2020/31] | HU | 01.02.2013 | |
AT | 28.06.2017 | ||
CY | 28.06.2017 | ||
CZ | 28.06.2017 | ||
DK | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
MC | 28.06.2017 | ||
MK | 28.06.2017 | ||
MT | 28.06.2017 | ||
PL | 28.06.2017 | ||
PT | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SI | 28.06.2017 | ||
SK | 28.06.2017 | ||
SM | 28.06.2017 | ||
TR | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
IS | 28.10.2017 | ||
GB | 01.02.2018 | ||
IE | 01.02.2018 | ||
LU | 01.02.2018 | ||
BE | 28.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
Former [2020/28] | HU | 01.02.2013 | |
AT | 28.06.2017 | ||
CZ | 28.06.2017 | ||
DK | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
MC | 28.06.2017 | ||
MT | 28.06.2017 | ||
PL | 28.06.2017 | ||
PT | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SI | 28.06.2017 | ||
SK | 28.06.2017 | ||
SM | 28.06.2017 | ||
TR | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
IS | 28.10.2017 | ||
GB | 01.02.2018 | ||
IE | 01.02.2018 | ||
LU | 01.02.2018 | ||
BE | 28.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
Former [2020/15] | AT | 28.06.2017 | |
CZ | 28.06.2017 | ||
DK | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
MC | 28.06.2017 | ||
MT | 28.06.2017 | ||
PL | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SI | 28.06.2017 | ||
SK | 28.06.2017 | ||
SM | 28.06.2017 | ||
TR | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
IS | 28.10.2017 | ||
GB | 01.02.2018 | ||
IE | 01.02.2018 | ||
LU | 01.02.2018 | ||
BE | 28.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
Former [2019/12] | AT | 28.06.2017 | |
CZ | 28.06.2017 | ||
DK | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
MC | 28.06.2017 | ||
MT | 28.06.2017 | ||
PL | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SI | 28.06.2017 | ||
SK | 28.06.2017 | ||
SM | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
IS | 28.10.2017 | ||
GB | 01.02.2018 | ||
IE | 01.02.2018 | ||
LU | 01.02.2018 | ||
BE | 28.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
Former [2019/09] | AT | 28.06.2017 | |
CZ | 28.06.2017 | ||
DK | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
MC | 28.06.2017 | ||
MT | 28.06.2017 | ||
PL | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SI | 28.06.2017 | ||
SK | 28.06.2017 | ||
SM | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
IS | 28.10.2017 | ||
IE | 01.02.2018 | ||
LU | 01.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
Former [2018/52] | AT | 28.06.2017 | |
CZ | 28.06.2017 | ||
DK | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
MC | 28.06.2017 | ||
MT | 28.06.2017 | ||
PL | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SI | 28.06.2017 | ||
SK | 28.06.2017 | ||
SM | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
IS | 28.10.2017 | ||
LU | 01.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
Former [2018/44] | AT | 28.06.2017 | |
CZ | 28.06.2017 | ||
DK | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
MC | 28.06.2017 | ||
MT | 28.06.2017 | ||
PL | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SI | 28.06.2017 | ||
SK | 28.06.2017 | ||
SM | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
IS | 28.10.2017 | ||
Former [2018/43] | AT | 28.06.2017 | |
CZ | 28.06.2017 | ||
DK | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
MT | 28.06.2017 | ||
PL | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SI | 28.06.2017 | ||
SK | 28.06.2017 | ||
SM | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
IS | 28.10.2017 | ||
Former [2018/39] | AT | 28.06.2017 | |
CZ | 28.06.2017 | ||
DK | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
PL | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SI | 28.06.2017 | ||
SK | 28.06.2017 | ||
SM | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
IS | 28.10.2017 | ||
Former [2018/21] | AT | 28.06.2017 | |
CZ | 28.06.2017 | ||
DK | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
PL | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SK | 28.06.2017 | ||
SM | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
IS | 28.10.2017 | ||
Former [2018/11] | AT | 28.06.2017 | |
CZ | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
PL | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SK | 28.06.2017 | ||
SM | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
IS | 28.10.2017 | ||
Former [2018/10] | AT | 28.06.2017 | |
CZ | 28.06.2017 | ||
EE | 28.06.2017 | ||
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
RO | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
SK | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
Former [2018/09] | EE | 28.06.2017 | |
FI | 28.06.2017 | ||
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
Former [2017/50] | FI | 28.06.2017 | |
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
LV | 28.06.2017 | ||
RS | 28.06.2017 | ||
SE | 28.06.2017 | ||
BG | 28.09.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | ||
Former [2017/49] | FI | 28.06.2017 | |
HR | 28.06.2017 | ||
LT | 28.06.2017 | ||
NO | 28.09.2017 | ||
GR | 29.09.2017 | Cited in | International search | [Y]GB2059390 (SIG SCHWEIZ INDUSTRIEGES) [Y] 1-23 * the whole document *; | [A]FR2573057 (SOCAR [FR]) [A] 1,16 * page 6, line 1 - page 7, line 8; figures 1,4 *; | [Y]FR2603570 (MUELLER WEINGARTEN MASCHF [DE]) [Y] 1-23 * page 1, line 1 - page 1, line 6 * * page 4, line 5 - page 6, line 19; figure 4 *; | [A]WO2011124782 (OTOR SA [FR], et al) [A] 1,16* page 15, line 20 - page 15, line 34; figures 1-3 * |