| EP2825354 - CUTTING BLADE WITH MEANS FOR PRODUCING AN AIRSTREAM [Right-click to bookmark this link] | |||
| Former [2015/04] | CUTTING BLADE HAVING A MEANS FOR PRODUCING AN AIR FLOW | ||
| [2017/15] | Status | Patent maintained as amended Status updated on 30.10.2020 Database last updated on 24.03.2026 | |
| Former | The patent has been granted Status updated on 04.08.2017 | ||
| Former | Grant of patent is intended Status updated on 11.04.2017 | ||
| Former | Examination is in progress Status updated on 30.11.2016 | Most recent event Tooltip | 30.10.2020 | Patent maintained (B2 publication) | published on 02.12.2020 [2020/49] | Applicant(s) | For all designated states GEA Food Solutions Germany GmbH Im Ruttert 35216 Biedenkopf-Wallau / DE | [2015/04] | Inventor(s) | 01 /
STADTMÜLLER, Stefan Auf ́m Buch 2 87477 Sulzberg / DE | 02 /
MAY, Alexander Bgm. Karl-Fritz-Strasse 7 87448 Waltenhofen / DE | [2015/04] | Representative(s) | Wolff, Felix, et al Kutzenberger Wolff & Partner Waidmarkt 11 50676 Köln / DE | [2020/49] |
| Former [2015/04] | Wolff, Felix, et al Kutzenberger Wolff & Partner Theodor-Heuss-Ring 23 50668 Köln / DE | Application number, filing date | 13709899.2 | 14.03.2013 | [2017/36] | WO2013EP55289 | Priority number, date | DE20121004960 | 14.03.2012 Original published format: DE102012004960 | [2015/04] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2013135843 | Date: | 19.09.2013 | Language: | DE | [2013/38] | Type: | A2 Application without search report | No.: | EP2825354 | Date: | 21.01.2015 | Language: | DE | The application published by WIPO in one of the EPO official languages on 19.09.2013 takes the place of the publication of the European patent application. | [2015/04] | Type: | B1 Patent specification | No.: | EP2825354 | Date: | 06.09.2017 | Language: | DE | [2017/36] | Type: | B2 New European patent specification | No.: | EP2825354 | Date: | 02.12.2020 | Language: | DE | [2020/49] | Search report(s) | International search report - published on: | EP | 16.01.2014 | Classification | IPC: | B26D1/00, B26D7/32 | [2015/04] | CPC: |
B26D7/32 (EP,US);
B26D1/0006 (EP,US);
B26D7/0658 (US);
B26D2007/0025 (EP,US);
B26D2210/02 (EP,US);
B26D7/00 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/04] | Title | German: | SCHNEIDMESSER MIT EINEM MITTEL ZUR ERZEUGUNG EINES LUFTSTROMS | [2015/04] | English: | CUTTING BLADE WITH MEANS FOR PRODUCING AN AIRSTREAM | [2017/15] | French: | LAME DE COUPE COMPRENANT UN MOYEN POUR LA PRODUCTION D' UN COURANT D'AIR | [2017/15] |
| Former [2015/04] | CUTTING BLADE HAVING A MEANS FOR PRODUCING AN AIR FLOW | ||
| Former [2015/04] | LAME DE COUPE COMPORTANT UN MOYEN DE PRODUCTION D'UN FLUX D'AIR | Entry into regional phase | 09.09.2014 | National basic fee paid | 09.09.2014 | Designation fee(s) paid | 09.09.2014 | Examination fee paid | Examination procedure | 24.02.2014 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 09.09.2014 | Examination requested [2015/04] | 26.05.2015 | Amendment by applicant (claims and/or description) | 27.11.2015 | Despatch of a communication from the examining division (Time limit: M04) | 07.04.2016 | Reply to a communication from the examining division | 08.08.2016 | Despatch of a communication from the examining division (Time limit: M04) | 29.11.2016 | Reply to a communication from the examining division | 12.04.2017 | Communication of intention to grant the patent | 27.07.2017 | Fee for grant paid | 27.07.2017 | Fee for publishing/printing paid | 27.07.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.11.2015 | Opposition(s) | Opponent(s) | 01
30.05.2018
ADMISSIBLE Weber Maschinenbau GmbH Breidenbach Günther-Weber-Strasse 3 35236 Breidenbach / DE Opponent's representative Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Martin-Greif-Straße 1 80336 München / DE | [N/P] |
| Former [2018/27] | |||
| Opponent(s) | 01
30.05.2018
ADMISSIBLE Weber Maschinenbau GmbH Breidenbach Günther-Weber-Strasse 3 35236 Breidenbach / DE Opponent's representative Manitz Finsterwald Patentanwälte PartmbB Martin-Greif-Strasse 1 80336 München / DE | 19.06.2018 | Invitation to proprietor to file observations on the notice of opposition | 17.10.2018 | Reply of patent proprietor to notice(s) of opposition | 09.10.2019 | Legal effect of interlocutory decision in opposition | 09.10.2019 | Date of oral proceedings | 03.02.2020 | Despatch of interlocutory decision in opposition | 03.02.2020 | Despatch of minutes of oral proceedings | 28.07.2020 | Despatch of communication that the patent will be maintained as amended | 27.10.2020 | Fee for printing new specification paid | Fees paid | Renewal fee | 30.03.2015 | Renewal fee patent year 03 | 30.03.2016 | Renewal fee patent year 04 | 30.03.2017 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.03.2013 | AL | 06.09.2017 | CY | 06.09.2017 | CZ | 06.09.2017 | DK | 06.09.2017 | EE | 06.09.2017 | FI | 06.09.2017 | HR | 06.09.2017 | LT | 06.09.2017 | LV | 06.09.2017 | MC | 06.09.2017 | MK | 06.09.2017 | MT | 06.09.2017 | PL | 06.09.2017 | PT | 06.09.2017 | RO | 06.09.2017 | RS | 06.09.2017 | SE | 06.09.2017 | SI | 06.09.2017 | SK | 06.09.2017 | SM | 06.09.2017 | TR | 06.09.2017 | BG | 06.12.2017 | NO | 06.12.2017 | GR | 07.12.2017 | IS | 06.01.2018 | AT | 14.03.2018 | IE | 14.03.2018 | LU | 14.03.2018 | BE | 31.03.2018 | CH | 31.03.2018 | LI | 31.03.2018 | [2020/34] |
| Former [2020/31] | HU | 14.03.2013 | |
| CY | 06.09.2017 | ||
| CZ | 06.09.2017 | ||
| DK | 06.09.2017 | ||
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| MC | 06.09.2017 | ||
| MK | 06.09.2017 | ||
| MT | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| PT | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SI | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| TR | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| AT | 14.03.2018 | ||
| IE | 14.03.2018 | ||
| LU | 14.03.2018 | ||
| BE | 31.03.2018 | ||
| CH | 31.03.2018 | ||
| LI | 31.03.2018 | ||
| Former [2020/28] | HU | 14.03.2013 | |
| CZ | 06.09.2017 | ||
| DK | 06.09.2017 | ||
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| MC | 06.09.2017 | ||
| MT | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| PT | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SI | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| TR | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| AT | 14.03.2018 | ||
| IE | 14.03.2018 | ||
| LU | 14.03.2018 | ||
| BE | 31.03.2018 | ||
| CH | 31.03.2018 | ||
| LI | 31.03.2018 | ||
| Former [2020/16] | CZ | 06.09.2017 | |
| DK | 06.09.2017 | ||
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| MC | 06.09.2017 | ||
| MT | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SI | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| TR | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| AT | 14.03.2018 | ||
| IE | 14.03.2018 | ||
| LU | 14.03.2018 | ||
| BE | 31.03.2018 | ||
| CH | 31.03.2018 | ||
| LI | 31.03.2018 | ||
| Former [2019/46] | CZ | 06.09.2017 | |
| DK | 06.09.2017 | ||
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| MC | 06.09.2017 | ||
| MT | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SI | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| AT | 14.03.2018 | ||
| IE | 14.03.2018 | ||
| LU | 14.03.2018 | ||
| BE | 31.03.2018 | ||
| CH | 31.03.2018 | ||
| LI | 31.03.2018 | ||
| Former [2019/12] | CZ | 06.09.2017 | |
| DK | 06.09.2017 | ||
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| MC | 06.09.2017 | ||
| MT | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SI | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| IE | 14.03.2018 | ||
| LU | 14.03.2018 | ||
| BE | 31.03.2018 | ||
| CH | 31.03.2018 | ||
| LI | 31.03.2018 | ||
| Former [2019/09] | CZ | 06.09.2017 | |
| DK | 06.09.2017 | ||
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| MC | 06.09.2017 | ||
| MT | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SI | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| IE | 14.03.2018 | ||
| LU | 14.03.2018 | ||
| Former [2019/04] | CZ | 06.09.2017 | |
| DK | 06.09.2017 | ||
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| MC | 06.09.2017 | ||
| MT | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SI | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| LU | 14.03.2018 | ||
| Former [2018/52] | CZ | 06.09.2017 | |
| DK | 06.09.2017 | ||
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| MC | 06.09.2017 | ||
| MT | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SI | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| Former [2018/43] | CZ | 06.09.2017 | |
| DK | 06.09.2017 | ||
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| MT | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SI | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| Former [2018/39] | CZ | 06.09.2017 | |
| DK | 06.09.2017 | ||
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SI | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| Former [2018/35] | CZ | 06.09.2017 | |
| DK | 06.09.2017 | ||
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| Former [2018/24] | CZ | 06.09.2017 | |
| EE | 06.09.2017 | ||
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| PL | 06.09.2017 | ||
| RO | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| SK | 06.09.2017 | ||
| SM | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| IS | 06.01.2018 | ||
| Former [2018/21] | CZ | 06.09.2017 | |
| FI | 06.09.2017 | ||
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| Former [2018/12] | FI | 06.09.2017 | |
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| LV | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| Former [2018/11] | FI | 06.09.2017 | |
| HR | 06.09.2017 | ||
| LT | 06.09.2017 | ||
| RS | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| BG | 06.12.2017 | ||
| NO | 06.12.2017 | ||
| GR | 07.12.2017 | ||
| Former [2018/09] | FI | 06.09.2017 | |
| LT | 06.09.2017 | ||
| SE | 06.09.2017 | ||
| NO | 06.12.2017 | ||
| Former [2018/08] | FI | 06.09.2017 | |
| LT | 06.09.2017 | ||
| NO | 06.12.2017 | ||
| Former [2018/07] | LT | 06.09.2017 | |
| NO | 06.12.2017 | Cited in | International search | [XY] DE3818474 (HOLAC MASCHBAU GMBH et al.) [X] 1,12,13 * column 1, line 60 - column 2, line 27; figure 1 *[Y] 2-11,14,15 | [X] US5136908 (CALLANDRELLO JOSEPH et al.) [X] 1,12,13 * abstract * | [Y] DE20009726 (SYSTEM GMBH et al.) [Y] 2-11 * page 2, line 25 - line 33 * | [Y] DE10332483 (KUCHLER FRITZ et al.) [Y] 14,15 * paragraphs [0008] , [0009] * | [XA] US1878071 (BERKEL JOHANNES C VAN et al.) [X] 12,13 * figures 1-3 *[A] 1-11 | [X] DE102004007671 (CFS KEMPTEN GMBH et al.) [X] 12,13 * paragraph [0008] * | [I] WO2011014914 (FRELK IND PTY LTD et al.) [I] 12,13 * page 16, line 8 - line 18; figures 23-36 * | [I] EP2407038 (HANDTMANN ALBERT MASCHF et al.) [I] 15 * the whole document * | [A] WO2010053595 (SPRAYING SYSTEMS CO et al.) [A] 15 * the whole document * | Opposition | EP2407038 | WO2011014914 | DE10332483 | DE20009726 | US5136908 | WO2010053595 | DE3818474 | DE102004007671 | US1878071 | WO2013152842 | DE102009030550 | DE102009032974 | WO2010086006 | DE19739788 | US3727504 | US1957623 | DE102005003040 | DE4031671 | EP2082854 | JPH06320493 | DE3742864 | DE2842105 | DE19926461 | DE10057333 | DE3818474 | WO2013152842 | WO2010086006 | EP2082854 | JPH06320493 | DE19926461 | DE10057333 |