EP2823572 - DATA COMMUNICATIONS SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.11.2020 Database last updated on 28.06.2024 | |
Former | The patent has been granted Status updated on 05.12.2019 | ||
Former | Grant of patent is intended Status updated on 17.06.2019 | ||
Former | Examination is in progress Status updated on 23.11.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Zenith Oilfield Technology Ltd Thainstone Business Park Inverurie, Aberdeenshire AB51 5GT / GB | [2020/01] |
Former [2015/03] | For all designated states Zenith Oilfield Technology Ltd Thainstone Business Park Inverurie, Aberdeenshire AB51 5GT / GB | Inventor(s) | 01 /
SHANKS, David Sirda Rose Croft Corseduick Road Newmachar Aberdeen Aberdeenshire AB21 0PG / GB | [2015/03] | Representative(s) | BRP Renaud & Partner mbB Rechtsanwälte Patentanwälte Steuerberater, et al Königstraße 28 70173 Stuttgart / DE | [2020/01] |
Former [2015/03] | Illingworth-Law, William Illingworth GPO Europe GE International Inc. The Ark 201 Talgarth Road Hammersmith London W6 8BJ / GB | Application number, filing date | 13712316.2 | 28.02.2013 | [2020/01] | WO2013GB50510 | Priority number, date | GB20120004126 | 08.03.2012 Original published format: GB 201204126 | GB20120009141 | 24.05.2012 Original published format: GB 201209141 | GB20120011806 | 04.07.2012 Original published format: GB 201211806 | GB20120015281 | 28.08.2012 Original published format: GB 201215281 | [2015/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013132232 | Date: | 12.09.2013 | Language: | EN | [2013/37] | Type: | A1 Application with search report | No.: | EP2823572 | Date: | 14.01.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.09.2013 takes the place of the publication of the European patent application. | [2015/03] | Type: | B1 Patent specification | No.: | EP2823572 | Date: | 01.01.2020 | Language: | EN | [2020/01] | Search report(s) | International search report - published on: | EP | 12.09.2013 | Classification | IPC: | H04B3/54 | [2015/03] | CPC: |
H04B3/54 (EP,US);
E21B47/12 (EP,US);
E21B43/128 (EP,US);
H04B2203/5466 (EP,US);
H04B2203/5475 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/03] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | DATENKOMMUNIKATIONSSYSTEM | [2015/03] | English: | DATA COMMUNICATIONS SYSTEM | [2015/03] | French: | SYSTÈME DE COMMUNICATION DE DONNÉES | [2015/03] | Entry into regional phase | 08.10.2014 | National basic fee paid | 08.10.2014 | Designation fee(s) paid | 08.10.2014 | Examination fee paid | Examination procedure | 08.10.2014 | Examination requested [2015/03] | 28.04.2015 | Amendment by applicant (claims and/or description) | 26.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 08.04.2019 | Reply to a communication from the examining division | 18.06.2019 | Communication of intention to grant the patent | 18.11.2019 | Fee for grant paid | 18.11.2019 | Fee for publishing/printing paid | 18.11.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.11.2018 | Opposition(s) | 02.10.2020 | No opposition filed within time limit [2020/50] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 18.11.2019 | Request for further processing filed | 18.11.2019 | Full payment received (date of receipt of payment) Request granted | 27.11.2019 | Decision despatched | Fees paid | Renewal fee | 02.03.2015 | Renewal fee patent year 03 | 29.02.2016 | Renewal fee patent year 04 | 28.02.2017 | Renewal fee patent year 05 | 28.02.2018 | Renewal fee patent year 06 | 28.02.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.02.2013 | AL | 01.01.2020 | AT | 01.01.2020 | CY | 01.01.2020 | CZ | 01.01.2020 | DK | 01.01.2020 | EE | 01.01.2020 | ES | 01.01.2020 | FI | 01.01.2020 | HR | 01.01.2020 | LT | 01.01.2020 | LV | 01.01.2020 | MC | 01.01.2020 | MK | 01.01.2020 | MT | 01.01.2020 | NL | 01.01.2020 | PL | 01.01.2020 | RO | 01.01.2020 | RS | 01.01.2020 | SE | 01.01.2020 | SI | 01.01.2020 | SK | 01.01.2020 | SM | 01.01.2020 | TR | 01.01.2020 | IE | 28.02.2020 | LU | 28.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | FR | 01.03.2020 | BG | 01.04.2020 | GR | 02.04.2020 | IS | 01.05.2020 | PT | 27.05.2020 | [2022/31] |
Former [2022/30] | HU | 28.02.2013 | |
AL | 01.01.2020 | ||
AT | 01.01.2020 | ||
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
FR | 01.03.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2022/27] | HU | 28.02.2013 | |
AT | 01.01.2020 | ||
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
FR | 01.03.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2022/26] | AT | 01.01.2020 | |
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
FR | 01.03.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2021/11] | AT | 01.01.2020 | |
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
FR | 01.03.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2021/07] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
FR | 01.03.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/52] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
LU | 28.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/50] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
LU | 28.02.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/49] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
LU | 28.02.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/48] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SM | 01.01.2020 | ||
LU | 28.02.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/47] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
LU | 28.02.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/40] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/39] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/38] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/37] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
PT | 27.05.2020 | ||
Former [2020/36] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
LT | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
PT | 27.05.2020 | ||
Former [2020/35] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
LT | 01.01.2020 | ||
NL | 01.01.2020 | ||
Former [2020/33] | NL | 01.01.2020 | Cited in | International search | [Y]US6587037 (BESSER GORDON L [US], et al) [Y] 3,8* column 2, line 47 - column 3, line 35 *; | [IY]WO2008011889 (SIEMENS AG [DE], et al) [I] 1,4-7,9-12,15 * page 7, line 25 - page 8, line 35 * [Y] 3,8 |