EP2834686 - OPTICAL FIBER RIBBONIZATION APPARATUS AND METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.04.2018 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 28.04.2017 | ||
Former | Grant of patent is intended Status updated on 19.12.2016 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Xieon Networks S.à r.l. 6, route de Trèves 2633 Senningerberg / LU | [2015/26] |
Former [2015/07] | For all designated states Xieon Networks S.à.r.l. Galileo Center 7, rue Lou Hemmer 1748 Luxemburg / LU | Inventor(s) | 01 /
WONOADI, Sugianto Frohnauer Strasse 141B 13465 Berlin / DE | [2015/07] | Representative(s) | Lucke, Andreas Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [N/P] |
Former [2015/07] | Lucke, Andreas Boehmert & Boehmert Anwaltspartnerschaft mbB Patentanwälte Rechtsanwälte Pettenkoferstrasse 20-22 80336 München / DE | Application number, filing date | 13714912.6 | 05.04.2013 | [2017/22] | WO2013EP57240 | Priority number, date | DE201210205723 | 05.04.2012 Original published format: DE102012205723 | [2015/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013150149 | Date: | 10.10.2013 | Language: | EN | [2013/41] | Type: | A1 Application with search report | No.: | EP2834686 | Date: | 11.02.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 10.10.2013 takes the place of the publication of the European patent application. | [2015/07] | Type: | B1 Patent specification | No.: | EP2834686 | Date: | 31.05.2017 | Language: | EN | [2017/22] | Search report(s) | International search report - published on: | EP | 10.10.2013 | Classification | IPC: | G02B6/255 | [2015/07] | CPC: |
G02B6/2555 (EP,CN,US);
G02B6/2553 (EP,CN,US);
G02B6/2558 (EP,CN,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | FASEROPTISCHE BANDFORMUNGSVORRICHTUNG UND VERFAHREN | [2015/07] | English: | OPTICAL FIBER RIBBONIZATION APPARATUS AND METHOD | [2015/07] | French: | APPAREIL ET PROCÉDÉ DE FORMATION DE RUBANS À PARTIR DE FIBRES OPTIQUES | [2015/07] | Entry into regional phase | 03.11.2014 | National basic fee paid | 03.11.2014 | Designation fee(s) paid | 03.11.2014 | Examination fee paid | Examination procedure | 03.11.2014 | Amendment by applicant (claims and/or description) | 03.11.2014 | Examination requested [2015/07] | 10.12.2015 | Despatch of a communication from the examining division (Time limit: M04) | 15.03.2016 | Reply to a communication from the examining division | 23.11.2016 | Date of oral proceedings | 12.12.2016 | Minutes of oral proceedings despatched | 20.12.2016 | Communication of intention to grant the patent | 20.04.2017 | Fee for grant paid | 20.04.2017 | Fee for publishing/printing paid | 20.04.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.12.2015 | Opposition(s) | 01.03.2018 | No opposition filed within time limit [2018/19] | Fees paid | Renewal fee | 21.04.2015 | Renewal fee patent year 03 | 29.03.2016 | Renewal fee patent year 04 | 21.04.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.04.2013 | AL | 31.05.2017 | AT | 31.05.2017 | CY | 31.05.2017 | CZ | 31.05.2017 | DK | 31.05.2017 | EE | 31.05.2017 | ES | 31.05.2017 | FI | 31.05.2017 | HR | 31.05.2017 | LT | 31.05.2017 | LV | 31.05.2017 | MC | 31.05.2017 | MK | 31.05.2017 | NL | 31.05.2017 | PL | 31.05.2017 | PT | 31.05.2017 | RO | 31.05.2017 | RS | 31.05.2017 | SE | 31.05.2017 | SI | 31.05.2017 | SK | 31.05.2017 | SM | 31.05.2017 | TR | 31.05.2017 | BG | 31.08.2017 | NO | 31.08.2017 | GR | 01.09.2017 | IS | 30.09.2017 | [2020/34] |
Former [2020/31] | HU | 05.04.2013 | |
AT | 31.05.2017 | ||
CY | 31.05.2017 | ||
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
MK | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
PT | 31.05.2017 | ||
RO | 31.05.2017 | ||
RS | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
TR | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2020/28] | HU | 05.04.2013 | |
AT | 31.05.2017 | ||
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
PT | 31.05.2017 | ||
RO | 31.05.2017 | ||
RS | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
TR | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2020/15] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
RS | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
TR | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2018/52] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
RS | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2018/25] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
RS | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2018/11] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
RS | 31.05.2017 | ||
SE | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2018/10] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
RO | 31.05.2017 | ||
RS | 31.05.2017 | ||
SE | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2018/09] | AT | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
RS | 31.05.2017 | ||
SE | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2017/52] | AT | 31.05.2017 | |
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
RS | 31.05.2017 | ||
SE | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2017/50] | AT | 31.05.2017 | |
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
RS | 31.05.2017 | ||
SE | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2017/49] | AT | 31.05.2017 | |
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | Cited in | International search | [XI]US5546491 (LOCH MANFRED [DE]) [X] 1-3,6-8 * column 4, line 11 - column 5, line 42; figure - * [I] 5,9; | [A]US6033124 (LESUEUR PHILIPPE [FR], et al) [A] 1-9 * column 6, lines 12-17; figure 5 * * column 7, lines 35-61 *; | [A]US6369883 (CLARK BRETT G [US]) [A] 1-9* abstract *; | [XI]US2005018948 (BELLEKENS KATHLEEN [BE], et al) [X] 1-3,6-8 * paragraphs [0006] - [0014]; figures 1-5 * [I] 5,9; | [I]US2009022457 (DE JONG MICHAEL [US], et al) [I] 1-9 * paragraphs [0053] - [0054]; figures 17-18 * |