EP2803175 - DATA UNIT FORMAT FOR SINGLE USER BEAMFORMING IN LONG-RANGE WIRELESS LOCAL AREA NETWORKS (WLANS) [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.04.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 03.05.2019 | ||
Former | Grant of patent is intended Status updated on 07.01.2019 | ||
Former | Examination is in progress Status updated on 17.11.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Marvell World Trade Ltd. L'Horizon Gunsite Road Brittons Hill St. Michael 14027 / BB | [2019/23] |
Former [2014/47] | For all designated states Marvell World Trade Ltd. L'Horizon, Gunsite Road Brittons Hill St. Michael 14027 / BB | Inventor(s) | 01 /
ZHANG, Hongyuan 4707 Paseo Padre Parkway Fremont, CA 94555 / US | 02 /
BANERJEA, Raja 970 Corte Madera Ct. Apt. 203 Sunnyvale, CA 94085 / US | [2014/47] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2019/23] |
Former [2014/47] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Leopoldstrasse 4 80802 München / DE | Application number, filing date | 13722047.1 | 14.01.2013 | [2019/23] | WO2013IB00577 | Priority number, date | US201261586565P | 13.01.2012 Original published format: US 201261586565 P | US201261587386P | 17.01.2012 Original published format: US 201261587386 P | US201261591718P | 27.01.2012 Original published format: US 201261591718 P | US201261610725P | 14.03.2012 Original published format: US 201261610725 P | US201261674724P | 23.07.2012 Original published format: US 201261674724 P | [2014/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2013104999 | Date: | 18.07.2013 | Language: | EN | [2013/29] | Type: | A2 Application without search report | No.: | EP2803175 | Date: | 19.11.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 18.07.2013 takes the place of the publication of the European patent application. | [2014/47] | Type: | B1 Patent specification | No.: | EP2803175 | Date: | 05.06.2019 | Language: | EN | [2019/23] | Search report(s) | International search report - published on: | EP | 19.09.2013 | Classification | IPC: | H04L27/26, H04L5/00, H04L29/02, H04W84/12 | [2019/02] | CPC: |
H04L27/2613 (EP,CN,US);
H04L5/0023 (EP,CN,US);
H04L27/2603 (EP,US);
H04L65/00 (EP,US);
H04W84/12 (EP,CN,US)
|
Former IPC [2014/47] | H04L27/26, H04L5/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | DATENEINHEITSFORMAT FÜR EINZELBENUTZERSTRAHLFORMUNG IN DRAHTLOSEN LOKALEN NETZWERKEN MIT GROSSER REICHWEITE (WLANS) | [2014/47] | English: | DATA UNIT FORMAT FOR SINGLE USER BEAMFORMING IN LONG-RANGE WIRELESS LOCAL AREA NETWORKS (WLANS) | [2014/47] | French: | FORMAT D'UNITÉ DE DONNÉES POUR FORMATION DE FAISCEAU MONO-UTILISATEUR DANS DES RÉSEAUX LOCAUX SANS FIL (WLAN) À LONGUE PORTÉE | [2014/47] | Entry into regional phase | 11.07.2014 | National basic fee paid | 11.07.2014 | Designation fee(s) paid | 11.07.2014 | Examination fee paid | Examination procedure | 11.07.2014 | Examination requested [2014/47] | 18.02.2015 | Amendment by applicant (claims and/or description) | 17.11.2017 | Despatch of a communication from the examining division (Time limit: M04) | 20.03.2018 | Reply to a communication from the examining division | 08.01.2019 | Communication of intention to grant the patent | 25.04.2019 | Fee for grant paid | 25.04.2019 | Fee for publishing/printing paid | 25.04.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | EP19169589.9 / EP3557830 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.11.2017 | Opposition(s) | 06.03.2020 | No opposition filed within time limit [2020/20] | Fees paid | Renewal fee | 27.01.2015 | Renewal fee patent year 03 | 27.01.2016 | Renewal fee patent year 04 | 27.01.2017 | Renewal fee patent year 05 | 29.01.2018 | Renewal fee patent year 06 | 30.01.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.01.2013 | AL | 05.06.2019 | AT | 05.06.2019 | CY | 05.06.2019 | CZ | 05.06.2019 | DK | 05.06.2019 | EE | 05.06.2019 | ES | 05.06.2019 | FI | 05.06.2019 | HR | 05.06.2019 | IT | 05.06.2019 | LT | 05.06.2019 | LV | 05.06.2019 | MC | 05.06.2019 | MK | 05.06.2019 | MT | 05.06.2019 | NL | 05.06.2019 | PL | 05.06.2019 | RO | 05.06.2019 | RS | 05.06.2019 | SE | 05.06.2019 | SI | 05.06.2019 | SK | 05.06.2019 | SM | 05.06.2019 | TR | 05.06.2019 | BG | 05.09.2019 | NO | 05.09.2019 | GR | 06.09.2019 | IS | 05.10.2019 | PT | 07.10.2019 | IE | 14.01.2020 | LU | 14.01.2020 | BE | 31.01.2020 | CH | 31.01.2020 | LI | 31.01.2020 | [2022/32] |
Former [2022/27] | HU | 14.01.2013 | |
AL | 05.06.2019 | ||
AT | 05.06.2019 | ||
CY | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
MT | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
IE | 14.01.2020 | ||
LU | 14.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2021/08] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
IE | 14.01.2020 | ||
LU | 14.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/51] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
LU | 14.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/48] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
LU | 14.01.2020 | ||
Former [2020/46] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
LU | 14.01.2020 | ||
Former [2020/39] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/25] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/22] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/17] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/13] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/12] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/11] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/10] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/09] | AL | 05.06.2019 | |
CZ | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2020/07] | AL | 05.06.2019 | |
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/51] | AL | 05.06.2019 | |
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/50] | AL | 05.06.2019 | |
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/49] | AL | 05.06.2019 | |
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/48] | FI | 05.06.2019 | |
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/47] | FI | 05.06.2019 | |
LT | 05.06.2019 | ||
NO | 05.09.2019 | Cited in | International search | [I]US2006193340 (JONES VINCENT K [US], et al) [I] 1-20 * abstract * * paragraph [0009] - paragraph [0013] * * paragraph [0039] - paragraph [0047] * * paragraph [0049] * * paragraph [0055] - paragraph [0056] * * paragraph [0060] *; | [X]US2010260159 (ZHANG HONGYUAN [US], et al) [X] 1-20 * figures 18-22 * * paragraph [0064] * * paragraph [0124] - paragraph [0131] * * paragraph [0143] - paragraph [0145] * * paragraph [0152] - paragraph [0155] *; | [I]US2011255620 (JONES IV VINCENT KNOWLES [US], et al) [I] 1-20 * paragraph [0035] - paragraph [0038] * * paragraph [0040] * * paragraph [0049] - paragraph [0053] * * paragraph [0064] - paragraph [0069] *; | [XP]EP2518929 (BROADCOM CORP [US]) [XP] 1-20 * abstract * * paragraph [0043] * * paragraph [0099] - paragraph [0117] *; | [XP] - Minyoung Park ET AL, "IEEE P802.11 Wireless LANs. Proposed Specification Framework for TGah. IEEE 802.11-11/1137r11", (20120919), pages 1 - 36, URL: https://mentor.ieee.org/802.11/dcn/12//11-11-1137-11-00ah-specification-framework-for-tgah.docx, (20130121), XP055050431 [XP] 1-20 * 3.2.1. Preamble * | Examination | WO2012177993 |