EP2997766 - COMMUNICATING WITH A RADIO NETWORK CONTROL NODE IN A COMMUNICATION NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 06.03.2020 | ||
Former | Grant of patent is intended Status updated on 07.01.2020 | ||
Former | Examination is in progress Status updated on 21.06.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2020/15] |
Former [2016/12] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
NYLANDER, Tomas Högtorpsvägen 28 SE-139 34 Värmdö / SE | 02 /
VIKBERG, Jari Tapio Svalsätersvägen 12 SE-153 38 Järna / SE | [2016/12] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2020/15] |
Former [2016/12] | White, Duncan Rohan Marks & Clerk LLP Fletcher House (2nd Floor) Heatley Road The Oxford Science Park Oxford OX4 4GE / GB | Application number, filing date | 13723110.6 | 14.05.2013 | [2016/12] | WO2013EP59953 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014183788 | Date: | 20.11.2014 | Language: | EN | [2014/47] | Type: | A1 Application with search report | No.: | EP2997766 | Date: | 23.03.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.11.2014 takes the place of the publication of the European patent application. | [2016/12] | Type: | B1 Patent specification | No.: | EP2997766 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Search report(s) | International search report - published on: | EP | 20.11.2014 | Classification | IPC: | H04W36/14, H04W76/22, // H04W84/02 | [2019/52] | CPC: |
H04W36/1446 (EP);
H04W8/02 (US);
H04W36/14 (US);
H04W48/08 (US);
H04W76/22 (EP,US);
H04W84/02 (EP,US);
H04W88/12 (US)
(-)
|
Former IPC [2016/12] | H04W36/14, H04W84/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KOMMUNIKATION MIT EINEM FUNKNETZSTEUERUNGSKNOTEN IN EINEM KOMMUNIKATIONSNETZWERK | [2016/12] | English: | COMMUNICATING WITH A RADIO NETWORK CONTROL NODE IN A COMMUNICATION NETWORK | [2016/12] | French: | COMMUNICATION AVEC UN NOEUD DE COMMANDE DE RESEAU RADIO DANS UN RESEAU DE COMMUNICATION | [2016/12] | Entry into regional phase | 19.11.2015 | National basic fee paid | 19.11.2015 | Designation fee(s) paid | 19.11.2015 | Examination fee paid | Examination procedure | 19.11.2015 | Examination requested [2016/12] | 29.06.2016 | Amendment by applicant (claims and/or description) | 26.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 16.10.2019 | Reply to a communication from the examining division | 08.01.2020 | Communication of intention to grant the patent | 28.02.2020 | Fee for grant paid | 28.02.2020 | Fee for publishing/printing paid | 28.02.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.06.2019 | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 17.11.2015 | Renewal fee patent year 03 | 27.05.2016 | Renewal fee patent year 04 | 30.05.2017 | Renewal fee patent year 05 | 29.05.2018 | Renewal fee patent year 06 | 28.05.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.05.2013 | AL | 08.04.2020 | AT | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | DK | 08.04.2020 | EE | 08.04.2020 | ES | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | IT | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | MT | 08.04.2020 | NL | 08.04.2020 | PL | 08.04.2020 | RO | 08.04.2020 | RS | 08.04.2020 | SE | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | TR | 08.04.2020 | IE | 14.05.2020 | LU | 14.05.2020 | BE | 31.05.2020 | CH | 31.05.2020 | LI | 31.05.2020 | BG | 08.07.2020 | NO | 08.07.2020 | GR | 09.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | [2022/32] |
Former [2022/27] | HU | 14.05.2013 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MT | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
TR | 08.04.2020 | ||
IE | 14.05.2020 | ||
LU | 14.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2022/26] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
TR | 08.04.2020 | ||
IE | 14.05.2020 | ||
LU | 14.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/24] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
IE | 14.05.2020 | ||
LU | 14.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/20] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
IE | 14.05.2020 | ||
LU | 14.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/15] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
LU | 14.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 08.04.2020 | |
DK | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/07] | AL | 08.04.2020 | |
DK | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 08.04.2020 | |
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 08.04.2020 | |
LT | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 08.04.2020 | |
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
Former [2020/46] | IS | 08.08.2020 | Cited in | International search | [X]WO2009121745 (NOKIA SIEMENS NETWORKS OY [FI], et al) [X] 1-22 * abstract * * figures 3,4 * * page 17, line 11 - page 20, line 2 * * page 25, line 3 - line 13 *; | [A]WO2013042330 (PANASONIC CORP [JP], et al) [A] 1-22 * abstract * * figures 1-11 * * paragraphs [0043] - [0046] *; | [A] - "Interworking Wi-Fi and Mobile Networks", (20130220), URL: http://c541678.r78.cf2.rackcdn.com/wp/wp-interworking-wi-fi-and-mobile-networks.pdf, (20140120), XP055097150 [A] 1-22 * the whole document * | [A] - "Cellular-Wi-Fi Integration Cellular-Wi-Fi White Paper", (20120630), URL: http://www.interdigital.com/wp-content/uploads/2012/08/Cellular_WiFi_Integration-White-Paper.pdf, (20140120), XP055097153 [A] 1-22 * paragraph [0005] * |