blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2852975

EP2852975 - SURFACE MOUNTABLE SEMICONDUCTOR DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.03.2021
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  27.03.2020
FormerGrant of patent is intended
Status updated on  13.01.2020
FormerExamination is in progress
Status updated on  07.08.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Lumileds Holding B.V.
The Base, Tower B5 unit 107
Evert van de Beekstraat 1
1118 CL Schiphol / NL
[2019/09]
Former [2018/09]For all designated states
Lumileds Holding B.V.
WTC Schiphol, Tower G4
Schiphol Boulevard 127
1118 BG Schiphol / NL
Former [2015/14]For:AL  AT  BE  BG  CH  CY  CZ  DK  EE  ES  FI  FR  GB  GR  HR  HU  IE  IS  IT  LI  LT  LU  LV  MC  MK  MT  NL  NO  PL  PT  RO  RS  SE  SI  SK  SM  TR 
Koninklijke Philips N.V.
High Tech Campus 5
5656 AE Eindhoven / NL
For:DE 
Philips GmbH
Lübeckertordamm 5
20099 Hamburg / DE
Inventor(s)01 / SCHUG, Josef Andreas
c/o High Tech Campus 5
NL-5656 AE Eindhoven / NL
 [2015/14]
Representative(s)ter Heegde, Paul Gerard Michel
Lumileds Germany GmbH
Philipsstraße 8
52068 Aachen / DE
[N/P]
Former [2020/18]Rüber, Bernhard Jakob
Lumileds Germany GmbH
Intellectual Property
Philipsstraße 8
52068 Aachen / DE
Former [2015/14]van Eeuwijk, Alexander Henricus Waltherus
Philips International B.V.
Intellectual Property & Standards
High Tech Campus 5
5656 AE Eindhoven / NL
Application number, filing date13729469.007.05.2013
[2020/18]
WO2013IB53665
Priority number, dateUS201261650522P23.05.2012         Original published format: US 201261650522 P
[2015/14]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013175333
Date:28.11.2013
Language:EN
[2013/48]
Type: A1 Application with search report 
No.:EP2852975
Date:01.04.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 28.11.2013 takes the place of the publication of the European patent application.
[2015/14]
Type: B1 Patent specification 
No.:EP2852975
Date:29.04.2020
Language:EN
[2020/18]
Search report(s)International search report - published on:EP28.11.2013
ClassificationIPC:H01L23/367, H01L33/48, H01L33/64
[2015/14]
CPC:
H01L33/486 (EP,US); H01L23/3677 (EP,US); H01L25/0753 (US);
H01L33/62 (EP,US); H01L33/642 (EP,US); H05K1/181 (US);
H01L23/367 (RU); H01L2924/0002 (EP,US); H01L33/64 (RU);
H05K2201/10106 (US) (-)
C-Set:
H01L2924/0002, H01L2924/00 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/14]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:OBERFLÄCHENMONTIERBARE HALBLEITERVORRICHTUNG[2015/14]
English:SURFACE MOUNTABLE SEMICONDUCTOR DEVICE[2015/14]
French:DISPOSITIF À SEMICONDUCTEURS MONTABLES EN SURFACE[2020/04]
Former [2015/14]DISPOSITIF À SEMICONDUCTEURS MONTABLE EN SURFACE
Entry into regional phase23.12.2014National basic fee paid 
23.12.2014Designation fee(s) paid 
23.12.2014Examination fee paid 
Examination procedure24.10.2014Amendment by applicant (claims and/or description)
23.12.2014Examination requested  [2015/14]
12.08.2019Despatch of a communication from the examining division (Time limit: M04)
17.10.2019Reply to a communication from the examining division
14.01.2020Communication of intention to grant the patent
23.03.2020Fee for grant paid
23.03.2020Fee for publishing/printing paid
23.03.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  12.08.2019
Opposition(s)01.02.2021No opposition filed within time limit [2021/14]
Fees paidRenewal fee
01.06.2015Renewal fee patent year 03
31.05.2016Renewal fee patent year 04
31.05.2017Renewal fee patent year 05
01.06.2018Renewal fee patent year 06
31.05.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.05.2013
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
MT29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
IE07.05.2020
LU07.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
[2022/32]
Former [2022/27]HU07.05.2013
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MT29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
IE07.05.2020
LU07.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2022/26]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
IE07.05.2020
LU07.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/24]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
IE07.05.2020
LU07.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/20]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SK29.04.2020
SM29.04.2020
IE07.05.2020
LU07.05.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/15]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SK29.04.2020
SM29.04.2020
LU07.05.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/10]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SK29.04.2020
SM29.04.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/09]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/08]AL29.04.2020
DK29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/07]AL29.04.2020
DK29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RS29.04.2020
SE29.04.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/04]AL29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/01]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/51]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/50]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/48]FI29.04.2020
LT29.04.2020
SE29.04.2020
NO29.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/47]LT29.04.2020
NO29.07.2020
IS29.08.2020
Former [2020/46]IS29.08.2020
Cited inInternational search[XI]WO2004105142  (MATSUSHITA ELECTRIC WORKS LTD [JP], et al) [X] 1-4,7-10 * figure 2 * [I] 5,6;
 [X]DE102010029529  (OSRAM GMBH [DE]) [X] 8-10 * figure 7 *
ExaminationJP2003168829
by applicantUS2011180819
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.