EP2852975 - SURFACE MOUNTABLE SEMICONDUCTOR DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.03.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 27.03.2020 | ||
Former | Grant of patent is intended Status updated on 13.01.2020 | ||
Former | Examination is in progress Status updated on 07.08.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Lumileds Holding B.V. The Base, Tower B5 unit 107 Evert van de Beekstraat 1 1118 CL Schiphol / NL | [2019/09] |
Former [2018/09] | For all designated states Lumileds Holding B.V. WTC Schiphol, Tower G4 Schiphol Boulevard 127 1118 BG Schiphol / NL | ||
Former [2015/14] | For:AL
AT
BE
BG
CH
CY
CZ
DK
EE
ES
FI
FR
GB
GR
HR
HU
IE
IS
IT
LI
LT
LU
LV
MC
MK
MT
NL
NO
PL
PT
RO
RS
SE
SI
SK
SM
TR
Koninklijke Philips N.V. High Tech Campus 5 5656 AE Eindhoven / NL | ||
For:DE
Philips GmbH Lübeckertordamm 5 20099 Hamburg / DE | Inventor(s) | 01 /
SCHUG, Josef Andreas c/o High Tech Campus 5 NL-5656 AE Eindhoven / NL | [2015/14] | Representative(s) | ter Heegde, Paul Gerard Michel Lumileds Germany GmbH Philipsstraße 8 52068 Aachen / DE | [N/P] |
Former [2020/18] | Rüber, Bernhard Jakob Lumileds Germany GmbH Intellectual Property Philipsstraße 8 52068 Aachen / DE | ||
Former [2015/14] | van Eeuwijk, Alexander Henricus Waltherus Philips International B.V. Intellectual Property & Standards High Tech Campus 5 5656 AE Eindhoven / NL | Application number, filing date | 13729469.0 | 07.05.2013 | [2020/18] | WO2013IB53665 | Priority number, date | US201261650522P | 23.05.2012 Original published format: US 201261650522 P | [2015/14] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013175333 | Date: | 28.11.2013 | Language: | EN | [2013/48] | Type: | A1 Application with search report | No.: | EP2852975 | Date: | 01.04.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.11.2013 takes the place of the publication of the European patent application. | [2015/14] | Type: | B1 Patent specification | No.: | EP2852975 | Date: | 29.04.2020 | Language: | EN | [2020/18] | Search report(s) | International search report - published on: | EP | 28.11.2013 | Classification | IPC: | H01L23/367, H01L33/48, H01L33/64 | [2015/14] | CPC: |
H01L33/486 (EP,US);
H01L23/3677 (EP,US);
H01L25/0753 (US);
H01L33/62 (EP,US);
H01L33/642 (EP,US);
H05K1/181 (US);
H01L23/367 (RU);
H01L2924/0002 (EP,US);
H01L33/64 (RU);
H05K2201/10106 (US)
(-)
| C-Set: |
H01L2924/0002, H01L2924/00 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/14] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | OBERFLÄCHENMONTIERBARE HALBLEITERVORRICHTUNG | [2015/14] | English: | SURFACE MOUNTABLE SEMICONDUCTOR DEVICE | [2015/14] | French: | DISPOSITIF À SEMICONDUCTEURS MONTABLES EN SURFACE | [2020/04] |
Former [2015/14] | DISPOSITIF À SEMICONDUCTEURS MONTABLE EN SURFACE | Entry into regional phase | 23.12.2014 | National basic fee paid | 23.12.2014 | Designation fee(s) paid | 23.12.2014 | Examination fee paid | Examination procedure | 24.10.2014 | Amendment by applicant (claims and/or description) | 23.12.2014 | Examination requested [2015/14] | 12.08.2019 | Despatch of a communication from the examining division (Time limit: M04) | 17.10.2019 | Reply to a communication from the examining division | 14.01.2020 | Communication of intention to grant the patent | 23.03.2020 | Fee for grant paid | 23.03.2020 | Fee for publishing/printing paid | 23.03.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.08.2019 | Opposition(s) | 01.02.2021 | No opposition filed within time limit [2021/14] | Fees paid | Renewal fee | 01.06.2015 | Renewal fee patent year 03 | 31.05.2016 | Renewal fee patent year 04 | 31.05.2017 | Renewal fee patent year 05 | 01.06.2018 | Renewal fee patent year 06 | 31.05.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.05.2013 | AL | 29.04.2020 | AT | 29.04.2020 | CY | 29.04.2020 | CZ | 29.04.2020 | DK | 29.04.2020 | EE | 29.04.2020 | ES | 29.04.2020 | FI | 29.04.2020 | HR | 29.04.2020 | IT | 29.04.2020 | LT | 29.04.2020 | LV | 29.04.2020 | MC | 29.04.2020 | MK | 29.04.2020 | MT | 29.04.2020 | NL | 29.04.2020 | PL | 29.04.2020 | RO | 29.04.2020 | RS | 29.04.2020 | SE | 29.04.2020 | SI | 29.04.2020 | SK | 29.04.2020 | SM | 29.04.2020 | TR | 29.04.2020 | IE | 07.05.2020 | LU | 07.05.2020 | BE | 31.05.2020 | CH | 31.05.2020 | LI | 31.05.2020 | BG | 29.07.2020 | NO | 29.07.2020 | GR | 30.07.2020 | IS | 29.08.2020 | PT | 31.08.2020 | [2022/32] |
Former [2022/27] | HU | 07.05.2013 | |
AL | 29.04.2020 | ||
AT | 29.04.2020 | ||
CY | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
MT | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
TR | 29.04.2020 | ||
IE | 07.05.2020 | ||
LU | 07.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2022/26] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
TR | 29.04.2020 | ||
IE | 07.05.2020 | ||
LU | 07.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/24] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
IE | 07.05.2020 | ||
LU | 07.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/20] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
IE | 07.05.2020 | ||
LU | 07.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/15] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
LU | 07.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/10] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/09] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SM | 29.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/08] | AL | 29.04.2020 | |
DK | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SM | 29.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/07] | AL | 29.04.2020 | |
DK | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/04] | AL | 29.04.2020 | |
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/01] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/51] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/50] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/48] | FI | 29.04.2020 | |
LT | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/47] | LT | 29.04.2020 | |
NO | 29.07.2020 | ||
IS | 29.08.2020 | ||
Former [2020/46] | IS | 29.08.2020 | Cited in | International search | [XI]WO2004105142 (MATSUSHITA ELECTRIC WORKS LTD [JP], et al) [X] 1-4,7-10 * figure 2 * [I] 5,6; | [X]DE102010029529 (OSRAM GMBH [DE]) [X] 8-10 * figure 7 * | Examination | JP2003168829 | by applicant | US2011180819 |