EP3014010 - HEAT PUMP LAUNDRY DRYER AND METHOD TO OPTIMIZE THE HEAT EXCHANGE OF SUCH A HEAT PUMP LAUNDRY DRYER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.07.2021 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 21.08.2020 | ||
Former | Grant of patent is intended Status updated on 27.04.2020 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Electrolux Appliances Aktiebolag St Göransgatan 143 105 45 Stockholm / SE | [2016/18] | Inventor(s) | 01 /
CAVARRETTA, Francesco Electrolux Italia S.p.A. Corso Lino Zanussi 30 I-33080 Porcia (PN) / IT | 02 /
ZANDONA', Stefano Electrolux Italia S.p.A. Corso Lino Zanussi 30 I-33080 Porcia (PN) / IT | [2016/18] | Representative(s) | Electrolux Group Patents AB Electrolux Group Patents S:t Göransgatan 143 105 45 Stockholm / SE | [N/P] |
Former [2020/39] | Electrolux Group Patents AB Electrolux Group Patents 105 45 Stockholm / SE | ||
Former [2016/18] | Petruccelli, Davide, et al Electrolux Italia S.p.A. Corso Lino Zanussi 30 33080 Porcia (PN) / IT | Application number, filing date | 13732170.9 | 28.06.2013 | [2016/18] | WO2013EP63614 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014206483 | Date: | 31.12.2014 | Language: | EN | [2014/53] | Type: | A1 Application with search report | No.: | EP3014010 | Date: | 04.05.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 31.12.2014 takes the place of the publication of the European patent application. | [2016/18] | Type: | B1 Patent specification | No.: | EP3014010 | Date: | 23.09.2020 | Language: | EN | [2020/39] | Search report(s) | International search report - published on: | EP | 31.12.2014 | Classification | IPC: | D06F58/20, A47L15/48, F28F3/00 | [2016/18] | CPC: |
D06F58/206 (EP,US);
A47L15/483 (EP);
F24F12/006 (EP);
F24F5/0035 (EP);
F28D1/05391 (EP);
F28F1/126 (EP);
F25B30/02 (EP);
F28F2215/04 (EP);
Y02B30/54 (EP);
Y02B30/56 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/18] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | WÄRMEPUMPENTROCKNER UND VERFAHREN ZUR VERBESSERUNG DES WÄRMEAUSTAUSCHES EINES SOLCHEN WÄRMEPUMPENTROCKNERS | [2020/20] | English: | HEAT PUMP LAUNDRY DRYER AND METHOD TO OPTIMIZE THE HEAT EXCHANGE OF SUCH A HEAT PUMP LAUNDRY DRYER | [2016/18] | French: | SÈCHE-LINGE À POMPE À CHALEUR ET PROCEDÉ D' AMELIORER L' ÉCHANGE DE CHALEUR DE CELUI-CI | [2020/20] |
Former [2016/18] | WÄRMEPUMPENWÄSCHETROCKNER UND VERFAHREN ZUR OPTIMIERUNG DES WÄRMEAUSTAUSCHS SOLCH EINES WÄRMEPUMPENWÄSCHETROCKNERS | ||
Former [2016/18] | SÈCHE-LINGE À POMPE À CHALEUR ET PROCÉDÉ POUR OPTIMISER L'ÉCHANGE DE CHALEUR D'UN TEL UN SÈCHE-LINGE À POMPE À CHALEUR | Entry into regional phase | 28.01.2016 | National basic fee paid | 28.01.2016 | Designation fee(s) paid | 28.01.2016 | Examination fee paid | Examination procedure | 28.01.2016 | Examination requested [2016/18] | 07.09.2016 | Amendment by applicant (claims and/or description) | 28.04.2020 | Communication of intention to grant the patent | 17.08.2020 | Fee for grant paid | 17.08.2020 | Fee for publishing/printing paid | 17.08.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.04.2020 | Opposition(s) | 24.06.2021 | No opposition filed within time limit [2021/35] | Fees paid | Renewal fee | 28.01.2016 | Renewal fee patent year 03 | 02.01.2017 | Renewal fee patent year 04 | 30.06.2017 | Renewal fee patent year 05 | 02.07.2018 | Renewal fee patent year 06 | 01.07.2019 | Renewal fee patent year 07 | 30.06.2020 | Renewal fee patent year 08 | Penalty fee | Additional fee for renewal fee | 30.06.2016 | 04   M06   Fee paid on   02.01.2017 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.06.2013 | AL | 23.09.2020 | AT | 23.09.2020 | CY | 23.09.2020 | CZ | 23.09.2020 | DK | 23.09.2020 | EE | 23.09.2020 | ES | 23.09.2020 | FI | 23.09.2020 | HR | 23.09.2020 | LT | 23.09.2020 | LV | 23.09.2020 | MC | 23.09.2020 | MK | 23.09.2020 | MT | 23.09.2020 | NL | 23.09.2020 | PL | 23.09.2020 | RO | 23.09.2020 | RS | 23.09.2020 | SE | 23.09.2020 | SI | 23.09.2020 | SK | 23.09.2020 | SM | 23.09.2020 | BG | 23.12.2020 | NO | 23.12.2020 | GR | 24.12.2020 | IS | 23.01.2021 | PT | 25.01.2021 | [2024/41] |
Former [2024/22] | HU | 28.06.2013 | |
AL | 23.09.2020 | ||
AT | 23.09.2020 | ||
CY | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
MK | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2023/30] | HU | 28.06.2013 | |
AL | 23.09.2020 | ||
AT | 23.09.2020 | ||
CY | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2023/28] | HU | 28.06.2013 | |
AL | 23.09.2020 | ||
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2022/08] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/37] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/36] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/28] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/25] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/24] | AT | 23.09.2020 | |
CZ | 23.09.2020 | ||
EE | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
NL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
PT | 25.01.2021 | ||
Former [2021/23] | CZ | 23.09.2020 | |
EE | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
NL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
PT | 25.01.2021 | ||
Former [2021/22] | CZ | 23.09.2020 | |
EE | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
NL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
PT | 25.01.2021 | ||
Former [2021/21] | FI | 23.09.2020 | |
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
NL | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
PT | 25.01.2021 | ||
Former [2021/20] | FI | 23.09.2020 | |
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
NL | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
Former [2021/18] | FI | 23.09.2020 | |
HR | 23.09.2020 | ||
LV | 23.09.2020 | ||
NL | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
Former [2021/10] | FI | 23.09.2020 | |
HR | 23.09.2020 | ||
LV | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
Former [2021/09] | FI | 23.09.2020 | |
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
Former [2021/08] | FI | 23.09.2020 | |
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
Former [2021/07] | FI | 23.09.2020 | |
NO | 23.12.2020 | Cited in | International search | [Y]EP1209277 (ELECTROLUX ZANUSSI ELETTRODOME [IT]) [Y] 1-20 * the whole document *; | [A]EP1391550 (LG ELECTRONICS INC [KR]) [A] 1-20* the whole document *; | [Y]DE202006014718U (V ZUG AG [CH]) [Y] 13,18 * the whole document *; | [Y]CN101793451 (UNIV XI AN JIAOTONG) [Y] 1,19 * the whole document *; | [Y]CN102230693 (GUANGDONG MIDEA ELECTRIC APLNC) [Y] 1,7,19 * the whole document *; | [A]US2011280736 (LEE YONGJU [KR], et al) [A] 1-20 * the whole document *; | [Y]DE102011104853 (GM GLOBAL TECH OPERATIONS INC [US]) [Y] 1-6,8-12,14-17,19,20 * the whole document * | by applicant | EP1209277 | US2011280736 |