EP2848065 - METHOD AND APPARATUS FOR PERFORMING EPDCCH RESOURCE ELEMENT MAPPING IN A COMMUNICATION NETWORK [Right-click to bookmark this link] | |||
Former [2015/12] | METHOD AND APPARATUS FOR PERFORMING EPDCCH RESOURCE ELEMENT MAPPING IN COMMUNICATION NETWORK | ||
[2021/40] | Status | No opposition filed within time limit Status updated on 27.01.2023 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 18.02.2022 | ||
Former | Grant of patent is intended Status updated on 27.09.2021 | ||
Former | Examination is in progress Status updated on 24.03.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Alcatel Lucent Site Nokia Paris Saclay Route de Villejust 91620 Nozay / FR | [2018/16] |
Former [2015/12] | For all designated states Alcatel Lucent 148/152 route de la Reine 92100 Boulogne-Billancourt / FR | Inventor(s) | 01 /
JIANG, Qi c/o Alcatel-Lucent Shanghai Bell Co., Ltd. 388, Ningqiao Road Pudong Jinqiao 201206 Shanghai / CN | 02 /
LIU, Zheng c/o Alcatel-Lucent Shanghai Bell Co., Ltd. 388, Ningqiao Road Pudong Jinqiao 201206 Shanghai / CN | 03 /
BAKER, Matthew 12 Fir Tree Close Rough Common Canterbury Kent CT2 9DB / GB | [2015/22] |
Former [2015/12] | 01 /
JIANG, Qi 388 Ningqiao RD Shanghai 201206 / CN | ||
02 /
LIU, Zheng 388 Ningqiao RD Shanghai 201206 / CN | |||
03 /
BAKER, Matthew 12 Fir Tree Close Rough Common Canterbury Kent CT2 9DB / GB | Representative(s) | DREISS Patentanwälte PartG mbB Friedrichstraße 6 70174 Stuttgart / DE | [2022/12] |
Former [2015/12] | DREISS Patentanwälte PartG mbB Patentanwälte Gerokstrasse 1 70188 Stuttgart / DE | Application number, filing date | 13732232.7 | 22.04.2013 | [2022/12] | WO2013IB01147 | Priority number, date | CN201210142846 | 09.05.2012 Original published format: CN201210142846 | [2015/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2013167967 | Date: | 14.11.2013 | Language: | EN | [2013/46] | Type: | A2 Application without search report | No.: | EP2848065 | Date: | 18.03.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.11.2013 takes the place of the publication of the European patent application. | [2015/12] | Type: | B1 Patent specification | No.: | EP2848065 | Date: | 23.03.2022 | Language: | EN | [2022/12] | Search report(s) | International search report - published on: | EP | 23.01.2014 | Classification | IPC: | H04L5/00 | [2020/50] | CPC: |
H04L5/0053 (EP,KR,US);
H04W72/23 (KR,US);
H04L5/0007 (KR);
H04L5/0091 (KR)
|
Former IPC [2017/14] | H04W72/04, H04L5/00 | ||
Former IPC [2015/12] | H04W72/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR DURCHFÜHRUNG VON EPDCCH-RESSOURCENELEMENTZUORDNUNG IN EINEM KOMMUNIKATIONSNETZWERK | [2015/12] | English: | METHOD AND APPARATUS FOR PERFORMING EPDCCH RESOURCE ELEMENT MAPPING IN A COMMUNICATION NETWORK | [2021/40] | French: | PROCÉDÉ ET APPAREIL POUR EFFECTUER UN MAPPAGE D'ÉLÉMENTS DE RESSOURCE E-PDCCH DANS UN RÉSEAU DE COMMUNICATION | [2015/12] |
Former [2015/12] | METHOD AND APPARATUS FOR PERFORMING EPDCCH RESOURCE ELEMENT MAPPING IN COMMUNICATION NETWORK | Entry into regional phase | 09.12.2014 | National basic fee paid | 09.12.2014 | Designation fee(s) paid | 09.12.2014 | Examination fee paid | Examination procedure | 09.12.2014 | Examination requested [2015/12] | 28.05.2015 | Amendment by applicant (claims and/or description) | 22.03.2017 | Despatch of a communication from the examining division (Time limit: M06) | 22.09.2017 | Reply to a communication from the examining division | 29.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 09.09.2019 | Reply to a communication from the examining division | 21.01.2020 | Despatch of a communication from the examining division (Time limit: M06) | 31.07.2020 | Reply to a communication from the examining division | 18.09.2020 | Despatch of a communication from the examining division (Time limit: M01) | 27.10.2020 | Reply to a communication from the examining division | 20.11.2020 | Despatch of a communication from the examining division (Time limit: M02) | 01.02.2021 | Reply to a communication from the examining division | 28.09.2021 | Communication of intention to grant the patent | 04.02.2022 | Fee for grant paid | 04.02.2022 | Fee for publishing/printing paid | 04.02.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.03.2017 | Opposition(s) | 02.01.2023 | No opposition filed within time limit [2023/09] | Fees paid | Renewal fee | 21.04.2015 | Renewal fee patent year 03 | 29.03.2016 | Renewal fee patent year 04 | 21.04.2017 | Renewal fee patent year 05 | 23.04.2018 | Renewal fee patent year 06 | 15.04.2019 | Renewal fee patent year 07 | 31.03.2020 | Renewal fee patent year 08 | 15.04.2021 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.04.2013 | AL | 23.03.2022 | AT | 23.03.2022 | CY | 23.03.2022 | CZ | 23.03.2022 | DK | 23.03.2022 | EE | 23.03.2022 | ES | 23.03.2022 | FI | 23.03.2022 | HR | 23.03.2022 | IT | 23.03.2022 | LT | 23.03.2022 | LV | 23.03.2022 | MC | 23.03.2022 | MK | 23.03.2022 | NL | 23.03.2022 | PL | 23.03.2022 | RO | 23.03.2022 | RS | 23.03.2022 | SE | 23.03.2022 | SI | 23.03.2022 | SK | 23.03.2022 | SM | 23.03.2022 | TR | 23.03.2022 | IE | 22.04.2022 | LU | 22.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | LI | 30.04.2022 | BG | 23.06.2022 | NO | 23.06.2022 | GR | 24.06.2022 | IS | 23.07.2022 | PT | 25.07.2022 | [2024/29] |
Former [2024/22] | HU | 22.04.2013 | |
AL | 23.03.2022 | ||
AT | 23.03.2022 | ||
CY | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
IT | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
MK | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
IE | 22.04.2022 | ||
LU | 22.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2024/20] | HU | 22.04.2013 | |
AL | 23.03.2022 | ||
AT | 23.03.2022 | ||
CY | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
IT | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
IE | 22.04.2022 | ||
LU | 22.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2024/18] | HU | 22.04.2013 | |
AL | 23.03.2022 | ||
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
IT | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
IE | 22.04.2022 | ||
LU | 22.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/35] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
IT | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
IE | 22.04.2022 | ||
LU | 22.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/25] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
IE | 22.04.2022 | ||
LU | 22.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/20] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
IE | 22.04.2022 | ||
LU | 22.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/10] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
LU | 22.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/09] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
LU | 22.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/08] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
LU | 22.04.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/07] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/06] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/01] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2022/51] | AT | 23.03.2022 | |
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2022/50] | AT | 23.03.2022 | |
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
PT | 25.07.2022 | ||
Former [2022/49] | AT | 23.03.2022 | |
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
PT | 25.07.2022 | ||
Former [2022/48] | AT | 23.03.2022 | |
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
PT | 25.07.2022 | ||
Former [2022/47] | AT | 23.03.2022 | |
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
PT | 25.07.2022 | ||
Former [2022/44] | FI | 23.03.2022 | |
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
Former [2022/39] | FI | 23.03.2022 | |
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
Former [2022/36] | HR | 23.03.2022 | |
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
Former [2022/35] | HR | 23.03.2022 | |
LT | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
Former [2022/33] | LT | 23.03.2022 | |
NO | 23.06.2022 | Cited in | International search | [A]WO2011093671 (LG ELECTRONICS INC [KR], et al) [A] 1-15 * abstract * * page 7, line 7 - page 10, line 2 * * page 37, line 14 - page 50, line 11 * * page 54, line 21 - page 57, line 9 *; | [YP]WO2012109542 (INTERDIGITAL PATENT HOLDINGS [US], et al) [YP] 1-4,6-8,10-12,14,15 * abstract * * paragraph [0005] - paragraph [0007] * * paragraph [0070] - paragraph [0079] * * paragraph [0117] - paragraph [0118] * * paragraph [0129] - paragraph [0142] * * paragraph [0148] - paragraph [0150] * * paragraph [0200] - paragraph [0213] * * paragraph [0222] *; | [YP]WO2013022326 (SAMSUNG ELECTRONICS CO LTD [KR], et al) [YP] 1-4,6-8,10-12,14,15 * abstract ** paragraphs [5] to [7], [47], [48] and [80] to [103 *; | [A] - LG-ERICSSON, "Consideration on enhanced PDCCH to REs mapping", 3GPP DRAFT; R1-114189, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111108), vol. RAN WG1, no. San Francisco, USA; 20111114 - 20111118, XP050562133 [A] 1-9,14,15 * paragraphs 2. to 3. * | [A] - PANASONIC, "Multiplexing of ePDCCHs and ePDCCH RE mapping", 3GPP DRAFT; R1-120237, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120131), vol. RAN WG1, no. Dresden, Germany; 20120206 - 20120210, XP050562794 [A] 1-4,6-8,14,15 * paragraphs 1 and 2 * | [A] - TEXAS INSTRUMENTS, "Considerations on E-PDCCH mapping and multiplexing", 3GPP DRAFT; R1-121213, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120320), vol. RAN WG1, no. Jeju, Korea; 20120326 - 20120330, XP050599509 [A] 1,6,10,11,14,15 * the whole document * | [A] - NEC GROUP, "DCI Multiplexing for E-PDCCH", 3GPP DRAFT; R1-120257, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120131), vol. RAN WG1, no. Dresden, Germany; 20120206 - 20120210, XP050562811 [A] 10-13 * paragraphs 1 to 3 * | [A] - ZTE CORPORATION, "Mapping Design for enhanced PDCCH", 3GPP DRAFT; R1-121055 MAPPING DESIGN FOR EPDCCH, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120320), vol. RAN WG1, no. Jeju, Korea; 20120326 - 20120330, XP050599358 [A] 10-13 * paragraphs 1 to 5 * | [YP] - FUJITSU, "Rate matching vs puncturing of ePDCCH", 3GPP DRAFT; R1-122067 RATE MATCHING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120512), vol. RAN WG1, no. Prague, Czech Republic; 20120521 - 20120525, XP050600356 [YP] 1-9,14,15 * the whole document * | [Y] - MCC SUPPORT, "Draft Report of 3GPP TSG RAN WG1 #68bis v0.1.0 (Jeju, South Korea, 26th â 30th March, 2012)", 3GPP DRAFT; DRAFT_REPORTWG1#68B_V010, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120405), vol. RAN WG1, no. Prague, Czech Republic; 20120521 - 20120525, XP050600224 [Y] 1-9,14,15 * page 69 - page 70 * * page 72 - page 73 * | [YP] - INTERDIGITAL COMMUNICATIONS ET AL, "PRS collision handling for ePDCCH", vol. RAN WG1, no. Qingdao, China; 20120813 - 20120817, (20120805), 3GPP DRAFT; R1-123408, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_70/Docs/, (20120805), XP050661294 [YP] 1-9,14,15 * the whole document * | [YP] - PANASONIC, "ePDCCH rate matching / puncturing and colliding signals analysis", 3GPP DRAFT; R1-122200_CLEAN, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120512), vol. RAN WG1, no. Prague, Czech Republic; 20120521 - 20120525, XP050600464 [YP] 1-9,14,15 * the whole document * | Examination | EP2829004 | - ERICSSON ET AL, "Details of multiplexing of DCI messages", 3GPP DRAFT; R1-121023, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120320), vol. RAN WG1, no. Jeju, Republic of Korea; 20120326 - 20120330, XP050599331 |