EP3017636 - USER PLANE IDLE MODE BUFFERING WITHIN SOFTWARE DEFINED NETWORK ARCHITECTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.07.2022 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 23.07.2021 | ||
Former | Grant of patent is intended Status updated on 11.02.2021 | ||
Former | Examination is in progress Status updated on 21.09.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Nokia Solutions and Networks GmbH & Co. KG Werinherstrasse 91 81541 München / DE | [2017/46] |
Former [2016/19] | For all designated states Nokia Solutions and Networks Management International GmbH St. Martin Str. 76 81541 Munich / DE | Inventor(s) | 01 /
HOFFMANN, Klaus Franz Sperr-Weg 51 80995 Munich / DE | [2016/19] | Representative(s) | Nokia EPO representatives Nokia Technologies Oy Karakaari 7 02610 Espoo / FI | [2021/34] |
Former [2016/19] | Borgström, Markus, et al Nokia Solutions and Networks Oy CEF T&I IPR Administration St.-Martin-Strasse 76 80240 Munich / DE | Application number, filing date | 13734997.3 | 03.07.2013 | [2016/19] | WO2013EP64055 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015000516 | Date: | 08.01.2015 | Language: | EN | [2015/01] | Type: | A1 Application with search report | No.: | EP3017636 | Date: | 11.05.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.01.2015 takes the place of the publication of the European patent application. | [2016/19] | Type: | B1 Patent specification | No.: | EP3017636 | Date: | 25.08.2021 | Language: | EN | [2021/34] | Search report(s) | International search report - published on: | EP | 08.01.2015 | Classification | IPC: | H04W52/28, H04W52/02 | [2021/08] | CPC: |
H04W52/0225 (EP,US);
H04L47/62 (US);
H04W52/0216 (EP,US);
H04W52/0219 (EP,US);
Y02D30/70 (EP,US)
|
Former IPC [2016/19] | H04W52/28 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | RUHEMODUSPUFFERUNG AUF BENUTZEREBENE IN EINER SOFTWAREDEFINIERTEN NETZWERKARCHITEKTUR | [2016/19] | English: | USER PLANE IDLE MODE BUFFERING WITHIN SOFTWARE DEFINED NETWORK ARCHITECTURE | [2016/19] | French: | MISE EN MÉMOIRE TAMPON DE MODE REPOS DANS UN PLAN UTILISATEUR DANS UNE ARCHITECTURE DE RÉSEAU DÉFINIE PAR LOGICIEL | [2016/19] | Entry into regional phase | 03.02.2016 | National basic fee paid | 03.02.2016 | Designation fee(s) paid | 03.02.2016 | Examination fee paid | Examination procedure | 22.12.2015 | Amendment by applicant (claims and/or description) | 03.02.2016 | Examination requested [2016/19] | 19.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 29.01.2019 | Reply to a communication from the examining division | 08.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 18.02.2020 | Reply to a communication from the examining division | 12.02.2021 | Communication of intention to grant the patent | 10.06.2021 | Fee for grant paid | 10.06.2021 | Fee for publishing/printing paid | 10.06.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.09.2018 | Opposition(s) | 27.05.2022 | No opposition filed within time limit [2022/31] | Fees paid | Renewal fee | 12.01.2016 | Renewal fee patent year 03 | 22.07.2016 | Renewal fee patent year 04 | 24.07.2017 | Renewal fee patent year 05 | 27.07.2018 | Renewal fee patent year 06 | 15.07.2019 | Renewal fee patent year 07 | 14.07.2020 | Renewal fee patent year 08 | 15.07.2021 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.07.2013 | AL | 25.08.2021 | AT | 25.08.2021 | CY | 25.08.2021 | CZ | 25.08.2021 | DK | 25.08.2021 | EE | 25.08.2021 | ES | 25.08.2021 | FI | 25.08.2021 | HR | 25.08.2021 | IT | 25.08.2021 | LT | 25.08.2021 | LV | 25.08.2021 | MC | 25.08.2021 | MK | 25.08.2021 | MT | 25.08.2021 | NL | 25.08.2021 | PL | 25.08.2021 | RO | 25.08.2021 | RS | 25.08.2021 | SE | 25.08.2021 | SI | 25.08.2021 | SK | 25.08.2021 | SM | 25.08.2021 | TR | 25.08.2021 | BG | 25.11.2021 | NO | 25.11.2021 | GR | 26.11.2021 | IS | 25.12.2021 | PT | 27.12.2021 | [2024/41] |
Former [2024/29] | HU | 03.07.2013 | |
AL | 25.08.2021 | ||
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
MK | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
TR | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2024/22] | HU | 03.07.2013 | |
AL | 25.08.2021 | ||
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
MK | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2024/20] | HU | 03.07.2013 | |
AL | 25.08.2021 | ||
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2024/18] | HU | 03.07.2013 | |
AL | 25.08.2021 | ||
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2023/11] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/36] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/29] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/26] | AT | 25.08.2021 | |
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/24] | AT | 25.08.2021 | |
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/21] | AT | 25.08.2021 | |
DK | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/16] | AT | 25.08.2021 | |
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/10] | AT | 25.08.2021 | |
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
PL | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/09] | AT | 25.08.2021 | |
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
LT | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
PT | 27.12.2021 | ||
Former [2022/08] | AT | 25.08.2021 | |
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
LT | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
Former [2022/07] | AT | 25.08.2021 | |
LT | 25.08.2021 | ||
NO | 25.11.2021 | Cited in | International search | [X]WO2011162667 (ERICSSON TELEFON AB L M [SE], et al) [X] 1-24 * page 11, line 20 - page 12, line 20 *; | [AD] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS) enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) access (Release 11)", 3GPP STANDARD; 3GPP TS 23.401, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20121218), vol. SA WG2, no. V11.4.0, pages 1 - 284, XP050691115 [AD] 1-24 * see section 4.3.5.6 * | Examination | WO2011162667 |