blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2805435

EP2805435 - APPARATUS AND METHOD FOR TRANSMITTING/RECEIVING PHYSICAL UPLINK SHARED CHANNEL SIGNAL IN CELLULAR RADIO COMMUNICATION SYSTEM SUPPORTING CARRIER AGGREGATION SCHEME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.10.2022
Database last updated on 29.06.2024
FormerThe patent has been granted
Status updated on  12.11.2021
FormerGrant of patent is intended
Status updated on  05.07.2021
FormerExamination is in progress
Status updated on  09.06.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Samsung Electronics Co., Ltd.
129, Samsung-ro
Yeongtong-gu
Suwon-si, Gyeonggi-do 443-742 / KR
[2014/48]
Inventor(s)01 / ZHANG, Shichang
12/F Zhongdian Fazhan Building
No.9 Xiaguangli
Chaoyang District
Beijing 100125 / CN
02 / FU, Jingxing
12/F Zhongdian Fazhan Building
No.9 Xiaguangli
Chaoyang District
Beijing 100125 / CN
03 / SUN, Chengjun
12/F Zhongdian Fazhan Building
No.9 Xiaguangli
Chaoyang District
Beijing 100125 / CN
 [2014/48]
Representative(s)Nederlandsch Octrooibureau
P.O. Box 29720
2502 LS The Hague / NL
[2014/48]
Application number, filing date13738288.318.01.2013
[2021/50]
WO2013KR00407
Priority number, dateCN2012101914620.01.2012         Original published format: CN201210019146
CN2012102190331.01.2012         Original published format: CN201210021903
CN2012104643524.02.2012         Original published format: CN201210046435
[2014/48]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013109086
Date:25.07.2013
Language:EN
[2013/30]
Type: A1 Application with search report 
No.:EP2805435
Date:26.11.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 25.07.2013 takes the place of the publication of the European patent application.
[2014/48]
Type: B1 Patent specification 
No.:EP2805435
Date:15.12.2021
Language:EN
[2021/50]
Search report(s)International search report - published on:KR25.07.2013
(Supplementary) European search report - dispatched on:EP23.07.2015
ClassificationIPC:H04L5/00, H04L5/14, H04B7/26, // H04L5/16
[2015/35]
CPC:
H04B7/2656 (EP,US); H04L1/18 (KR); H04W72/21 (US);
H04J3/00 (KR); H04L5/001 (EP,US); H04L5/1469 (EP,US);
H04L5/0092 (EP,US); H04L5/16 (EP,US) (-)
Former IPC [2014/48]H04B7/26
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/48]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VORRICHTUNG UND VERFAHREN ZUM SENDEN/EMPFANGEN EINES PHYSICAL-UPLINK-SHARED-CHANNEL-SIGNALS IN EINEM ZELLULÄREN FUNKKOMMUNIKATIONSSYSTEM ZUR UNTERSTÜTZUNG EINES TRÄGERAGGREGATIONSSCHEMAS[2014/48]
English:APPARATUS AND METHOD FOR TRANSMITTING/RECEIVING PHYSICAL UPLINK SHARED CHANNEL SIGNAL IN CELLULAR RADIO COMMUNICATION SYSTEM SUPPORTING CARRIER AGGREGATION SCHEME[2014/48]
French:APPAREIL ET PROCÉDÉ D'ÉMISSION/RÉCEPTION DE SIGNAL DE CANAL PARTAGÉ DE LIAISON MONTANTE PHYSIQUE DANS UN SYSTÈME DE RADIOCOMMUNICATION CELLULAIRE PRENANT EN CHARGE UN PROGRAMME D'AGRÉGATION DE PORTEUSES[2014/48]
Entry into regional phase13.08.2014National basic fee paid 
13.08.2014Search fee paid 
13.08.2014Designation fee(s) paid 
13.08.2014Examination fee paid 
Examination procedure13.08.2014Examination requested  [2014/48]
22.02.2016Amendment by applicant (claims and/or description)
12.06.2017Despatch of a communication from the examining division (Time limit: M06)
22.12.2017Reply to a communication from the examining division
16.12.2019Despatch of a communication from the examining division (Time limit: M04)
24.03.2020Reply to a communication from the examining division
11.02.2021Despatch of a communication from the examining division (Time limit: M04)
21.06.2021Reply to a communication from the examining division
06.07.2021Communication of intention to grant the patent
04.11.2021Fee for grant paid
04.11.2021Fee for publishing/printing paid
04.11.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  12.06.2017
Opposition(s)16.09.2022No opposition filed within time limit [2022/47]
Fees paidRenewal fee
24.12.2014Renewal fee patent year 03
21.12.2015Renewal fee patent year 04
22.12.2016Renewal fee patent year 05
27.12.2017Renewal fee patent year 06
23.01.2019Renewal fee patent year 07
23.01.2020Renewal fee patent year 08
22.01.2021Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.01.2013
AL15.12.2021
AT15.12.2021
CY15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
IT15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
MK15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
TR15.12.2021
IE18.01.2022
LU18.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
FR15.02.2022
BG15.03.2022
GB15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
[2024/29]
Former [2024/22]HU18.01.2013
AL15.12.2021
AT15.12.2021
CY15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
IT15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
MK15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
IE18.01.2022
LU18.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
FR15.02.2022
BG15.03.2022
GB15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2024/20]HU18.01.2013
AL15.12.2021
AT15.12.2021
CY15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
IT15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
IE18.01.2022
LU18.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
FR15.02.2022
BG15.03.2022
GB15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2024/18]HU18.01.2013
AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
IT15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
IE18.01.2022
LU18.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
FR15.02.2022
BG15.03.2022
GB15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2023/27]AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
IT15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
IE18.01.2022
LU18.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
FR15.02.2022
BG15.03.2022
GB15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2023/08]AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
IE18.01.2022
LU18.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
FR15.02.2022
BG15.03.2022
GB15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2023/03]AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
LU18.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
FR15.02.2022
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2023/01]AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
LU18.01.2022
BE31.01.2022
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2022/49]AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SK15.12.2021
SM15.12.2021
LU18.01.2022
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2022/46]AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SK15.12.2021
SM15.12.2021
LU18.01.2022
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2022/44]AT15.12.2021
CZ15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2022/42]AT15.12.2021
CZ15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2022/36]AT15.12.2021
CZ15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
PT18.04.2022
Former [2022/35]CZ15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
PT18.04.2022
Former [2022/34]EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
PT18.04.2022
Former [2022/33]FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
RS15.12.2021
SE15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
Former [2022/30]FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
RS15.12.2021
SE15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
Former [2022/25]FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
RS15.12.2021
SE15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
Former [2022/24]FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
RS15.12.2021
SE15.12.2021
BG15.03.2022
GR16.03.2022
Former [2022/22]FI15.12.2021
LT15.12.2021
RS15.12.2021
BG15.03.2022
Former [2022/21]RS15.12.2021
BG15.03.2022
Former [2022/19]BG15.03.2022
Documents cited:Search[X]  - CATT, "Design of TDD Inter-band Carrier Aggregation", 3GPP DRAFT; R1-113724, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111108), vol. RAN WG1, no. San Francisco; 20111114 - 20111118, XP050561843 [X] 1-18 * Sections 1-2;; figures 1-8; tables 1-3 *
 [XI]  - SAMSUNG, "Scheduling timing in CA with different TDD UL-DL configurations", 3GPP DRAFT; R1-114219 TDD CA SCHEDULING TIMING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111108), vol. RAN WG1, no. San Francisco, USA; 20111114 - 20111118, XP050562148 [X] 1,2,5-10,13-18 * Sections 1, 3, 4;; figures 4-5; table 1 * [I] 3,4,11,12
 [XI]  - LG ELECTRONICS, "Overall structure of TDD CA with different UL-DL configurations based on half-duplex operation", 3GPP DRAFT; R1-113973 HD BASED CA FOR DIFFERENT TDD CONFIG, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111109), vol. RAN WG1, no. San Francisco, USA; 20111114 - 20111118, XP050562286 [X] 1,2,5-10,13-18 * Sections 1-3;; figures 1-3 * [I] 3,4,11,12
 [A]  - YIFEI YUAN ET AL, "Relay backhaul subframe allocation in LTE-Advanced for TDD", COMMUNICATIONS AND NETWORKING IN CHINA (CHINACOM), 2010 5TH INTERNATIONAL ICST CONFERENCE ON, IEEE, PISCATAWAY, NJ, USA, (20100825), ISBN 973-963-9799-97-4, pages 1 - 5, XP031847204 [A] 1-18 * Section II.A;; tables 1-2 *
International search[A]US2011134774  (PELLETIER GHYSLAIN [CA], et al);
 [A]KR20110073689  (SAMSUNG ELECTRONICS CO LTD [KR]);
 [A]US2011305161  (EKPENYONG ANTHONY EDET [US], et al);
 [X]  - SAMSUNG, "Data Scheduling in CA with Different TDD UL-DL Configurations", 3GPP TSG RAN WG1 #66BIS, ZHUHAI, CHINA, (20111010), pages 1 - 3, XP050538229
 [A]  - SAMSUNG, "DL/UL HARQ-ACK Transmission in CA with Different TDD UL-DL Configu rations", 3GPP TSG RAN WG1 #66BIS, ZHUHAI, CHINA, (20111010), pages 1 - 4, XP050537587
Examination   - INTEL CORPORATION, "Discussion on HARQ feedback of TDD Inter-band Carrier Aggregation", 3GPP DRAFT; R1-113951, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111109), vol. RAN WG1, no. San Francisco, USA; 20111114 - 20111118, XP050562281
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.