EP2805435 - APPARATUS AND METHOD FOR TRANSMITTING/RECEIVING PHYSICAL UPLINK SHARED CHANNEL SIGNAL IN CELLULAR RADIO COMMUNICATION SYSTEM SUPPORTING CARRIER AGGREGATION SCHEME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.10.2022 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 12.11.2021 | ||
Former | Grant of patent is intended Status updated on 05.07.2021 | ||
Former | Examination is in progress Status updated on 09.06.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 443-742 / KR | [2014/48] | Inventor(s) | 01 /
ZHANG, Shichang 12/F Zhongdian Fazhan Building No.9 Xiaguangli Chaoyang District Beijing 100125 / CN | 02 /
FU, Jingxing 12/F Zhongdian Fazhan Building No.9 Xiaguangli Chaoyang District Beijing 100125 / CN | 03 /
SUN, Chengjun 12/F Zhongdian Fazhan Building No.9 Xiaguangli Chaoyang District Beijing 100125 / CN | [2014/48] | Representative(s) | Nederlandsch Octrooibureau P.O. Box 29720 2502 LS The Hague / NL | [2014/48] | Application number, filing date | 13738288.3 | 18.01.2013 | [2021/50] | WO2013KR00407 | Priority number, date | CN20121019146 | 20.01.2012 Original published format: CN201210019146 | CN20121021903 | 31.01.2012 Original published format: CN201210021903 | CN20121046435 | 24.02.2012 Original published format: CN201210046435 | [2014/48] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013109086 | Date: | 25.07.2013 | Language: | EN | [2013/30] | Type: | A1 Application with search report | No.: | EP2805435 | Date: | 26.11.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.07.2013 takes the place of the publication of the European patent application. | [2014/48] | Type: | B1 Patent specification | No.: | EP2805435 | Date: | 15.12.2021 | Language: | EN | [2021/50] | Search report(s) | International search report - published on: | KR | 25.07.2013 | (Supplementary) European search report - dispatched on: | EP | 23.07.2015 | Classification | IPC: | H04L5/00, H04L5/14, H04B7/26, // H04L5/16 | [2015/35] | CPC: |
H04B7/2656 (EP,US);
H04L1/18 (KR);
H04W72/21 (US);
H04J3/00 (KR);
H04L5/001 (EP,US);
H04L5/1469 (EP,US);
|
Former IPC [2014/48] | H04B7/26 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/48] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN ZUM SENDEN/EMPFANGEN EINES PHYSICAL-UPLINK-SHARED-CHANNEL-SIGNALS IN EINEM ZELLULÄREN FUNKKOMMUNIKATIONSSYSTEM ZUR UNTERSTÜTZUNG EINES TRÄGERAGGREGATIONSSCHEMAS | [2014/48] | English: | APPARATUS AND METHOD FOR TRANSMITTING/RECEIVING PHYSICAL UPLINK SHARED CHANNEL SIGNAL IN CELLULAR RADIO COMMUNICATION SYSTEM SUPPORTING CARRIER AGGREGATION SCHEME | [2014/48] | French: | APPAREIL ET PROCÉDÉ D'ÉMISSION/RÉCEPTION DE SIGNAL DE CANAL PARTAGÉ DE LIAISON MONTANTE PHYSIQUE DANS UN SYSTÈME DE RADIOCOMMUNICATION CELLULAIRE PRENANT EN CHARGE UN PROGRAMME D'AGRÉGATION DE PORTEUSES | [2014/48] | Entry into regional phase | 13.08.2014 | National basic fee paid | 13.08.2014 | Search fee paid | 13.08.2014 | Designation fee(s) paid | 13.08.2014 | Examination fee paid | Examination procedure | 13.08.2014 | Examination requested [2014/48] | 22.02.2016 | Amendment by applicant (claims and/or description) | 12.06.2017 | Despatch of a communication from the examining division (Time limit: M06) | 22.12.2017 | Reply to a communication from the examining division | 16.12.2019 | Despatch of a communication from the examining division (Time limit: M04) | 24.03.2020 | Reply to a communication from the examining division | 11.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 21.06.2021 | Reply to a communication from the examining division | 06.07.2021 | Communication of intention to grant the patent | 04.11.2021 | Fee for grant paid | 04.11.2021 | Fee for publishing/printing paid | 04.11.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.06.2017 | Opposition(s) | 16.09.2022 | No opposition filed within time limit [2022/47] | Fees paid | Renewal fee | 24.12.2014 | Renewal fee patent year 03 | 21.12.2015 | Renewal fee patent year 04 | 22.12.2016 | Renewal fee patent year 05 | 27.12.2017 | Renewal fee patent year 06 | 23.01.2019 | Renewal fee patent year 07 | 23.01.2020 | Renewal fee patent year 08 | 22.01.2021 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.01.2013 | AL | 15.12.2021 | AT | 15.12.2021 | CY | 15.12.2021 | CZ | 15.12.2021 | DK | 15.12.2021 | EE | 15.12.2021 | ES | 15.12.2021 | FI | 15.12.2021 | HR | 15.12.2021 | IT | 15.12.2021 | LT | 15.12.2021 | LV | 15.12.2021 | MC | 15.12.2021 | MK | 15.12.2021 | NL | 15.12.2021 | PL | 15.12.2021 | RO | 15.12.2021 | RS | 15.12.2021 | SE | 15.12.2021 | SI | 15.12.2021 | SK | 15.12.2021 | SM | 15.12.2021 | TR | 15.12.2021 | IE | 18.01.2022 | LU | 18.01.2022 | BE | 31.01.2022 | CH | 31.01.2022 | LI | 31.01.2022 | FR | 15.02.2022 | BG | 15.03.2022 | GB | 15.03.2022 | NO | 15.03.2022 | GR | 16.03.2022 | IS | 15.04.2022 | PT | 18.04.2022 | [2024/29] |
Former [2024/22] | HU | 18.01.2013 | |
AL | 15.12.2021 | ||
AT | 15.12.2021 | ||
CY | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
MK | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
IE | 18.01.2022 | ||
LU | 18.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
FR | 15.02.2022 | ||
BG | 15.03.2022 | ||
GB | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2024/20] | HU | 18.01.2013 | |
AL | 15.12.2021 | ||
AT | 15.12.2021 | ||
CY | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
IE | 18.01.2022 | ||
LU | 18.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
FR | 15.02.2022 | ||
BG | 15.03.2022 | ||
GB | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2024/18] | HU | 18.01.2013 | |
AL | 15.12.2021 | ||
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
IE | 18.01.2022 | ||
LU | 18.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
FR | 15.02.2022 | ||
BG | 15.03.2022 | ||
GB | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2023/27] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
IE | 18.01.2022 | ||
LU | 18.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
FR | 15.02.2022 | ||
BG | 15.03.2022 | ||
GB | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2023/08] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
IE | 18.01.2022 | ||
LU | 18.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
FR | 15.02.2022 | ||
BG | 15.03.2022 | ||
GB | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2023/03] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
LU | 18.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
FR | 15.02.2022 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2023/01] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
LU | 18.01.2022 | ||
BE | 31.01.2022 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/49] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
LU | 18.01.2022 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/46] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
LU | 18.01.2022 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/44] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/42] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/36] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/35] | CZ | 15.12.2021 | |
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/34] | EE | 15.12.2021 | |
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/33] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/30] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/25] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/24] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/22] | FI | 15.12.2021 | |
LT | 15.12.2021 | ||
RS | 15.12.2021 | ||
BG | 15.03.2022 | ||
Former [2022/21] | RS | 15.12.2021 | |
BG | 15.03.2022 | ||
Former [2022/19] | BG | 15.03.2022 | Documents cited: | Search | [X] - CATT, "Design of TDD Inter-band Carrier Aggregation", 3GPP DRAFT; R1-113724, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111108), vol. RAN WG1, no. San Francisco; 20111114 - 20111118, XP050561843 [X] 1-18 * Sections 1-2;; figures 1-8; tables 1-3 * | [XI] - SAMSUNG, "Scheduling timing in CA with different TDD UL-DL configurations", 3GPP DRAFT; R1-114219 TDD CA SCHEDULING TIMING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111108), vol. RAN WG1, no. San Francisco, USA; 20111114 - 20111118, XP050562148 [X] 1,2,5-10,13-18 * Sections 1, 3, 4;; figures 4-5; table 1 * [I] 3,4,11,12 | [XI] - LG ELECTRONICS, "Overall structure of TDD CA with different UL-DL configurations based on half-duplex operation", 3GPP DRAFT; R1-113973 HD BASED CA FOR DIFFERENT TDD CONFIG, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111109), vol. RAN WG1, no. San Francisco, USA; 20111114 - 20111118, XP050562286 [X] 1,2,5-10,13-18 * Sections 1-3;; figures 1-3 * [I] 3,4,11,12 | [A] - YIFEI YUAN ET AL, "Relay backhaul subframe allocation in LTE-Advanced for TDD", COMMUNICATIONS AND NETWORKING IN CHINA (CHINACOM), 2010 5TH INTERNATIONAL ICST CONFERENCE ON, IEEE, PISCATAWAY, NJ, USA, (20100825), ISBN 973-963-9799-97-4, pages 1 - 5, XP031847204 [A] 1-18 * Section II.A;; tables 1-2 * | International search | [A]US2011134774 (PELLETIER GHYSLAIN [CA], et al); | [A]KR20110073689 (SAMSUNG ELECTRONICS CO LTD [KR]); | [A]US2011305161 (EKPENYONG ANTHONY EDET [US], et al); | [X] - SAMSUNG, "Data Scheduling in CA with Different TDD UL-DL Configurations", 3GPP TSG RAN WG1 #66BIS, ZHUHAI, CHINA, (20111010), pages 1 - 3, XP050538229 | [A] - SAMSUNG, "DL/UL HARQ-ACK Transmission in CA with Different TDD UL-DL Configu rations", 3GPP TSG RAN WG1 #66BIS, ZHUHAI, CHINA, (20111010), pages 1 - 4, XP050537587 | Examination | - INTEL CORPORATION, "Discussion on HARQ feedback of TDD Inter-band Carrier Aggregation", 3GPP DRAFT; R1-113951, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111109), vol. RAN WG1, no. San Francisco, USA; 20111114 - 20111118, XP050562281 |