blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2861286

EP2861286 - SEALING CUSHION HAVING ANGLED SEALING FLAP [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.01.2021
Database last updated on 03.08.2024
FormerThe patent has been granted
Status updated on  14.02.2020
FormerGrant of patent is intended
Status updated on  08.10.2019
FormerExamination is in progress
Status updated on  10.11.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Koninklijke Philips N.V.
High Tech Campus 52
5656 AG Eindhoven / NL
[2020/12]
Former [2015/17]For all designated states
Koninklijke Philips N.V.
High Tech Campus 5
5656 AE Eindhoven / NL
Inventor(s)01 / EURY, Matthew, Paul
c/o High Tech Campus
Building 5
5656 AE Eindhoven / NL
 [2015/17]
Representative(s)Philips Intellectual Property & Standards
High Tech Campus 52
5656 AG Eindhoven / NL
[N/P]
Former [2020/12]Philips Intellectual Property & Standards
High Tech Campus 5
5656 AE Eindhoven / NL
Former [2015/17]Steffen, Thomas
Philips International B.V.
Intellectual Property & Standards
High Tech Campus 5
5656 AE Eindhoven / NL
Application number, filing date13739289.028.05.2013
[2020/12]
WO2013IB54408
Priority number, dateUS201261658956P13.06.2012         Original published format: US 201261658956 P
[2015/17]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013186654
Date:19.12.2013
Language:EN
[2013/51]
Type: A1 Application with search report 
No.:EP2861286
Date:22.04.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 19.12.2013 takes the place of the publication of the European patent application.
[2015/17]
Type: B1 Patent specification 
No.:EP2861286
Date:18.03.2020
Language:EN
[2020/12]
Search report(s)International search report - published on:EP19.12.2013
ClassificationIPC:A61M16/06
[2015/17]
CPC:
A61M16/06 (EP,US); A61M16/0622 (US); A61M16/0616 (EP,US);
A61M16/0633 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/17]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:DICHTUNGSPOLSTER MIT ABGEWINKELTER DICHTUNGSKLAPPE[2015/17]
English:SEALING CUSHION HAVING ANGLED SEALING FLAP[2015/17]
French:COUSSIN D'ÉTANCHÉITÉ POURVU D'UN RABAT D'ÉTANCHÉITÉ ANGULAIRE[2015/17]
Entry into regional phase13.01.2015National basic fee paid 
13.01.2015Designation fee(s) paid 
13.01.2015Examination fee paid 
Examination procedure13.01.2015Examination requested  [2015/17]
09.04.2015Amendment by applicant (claims and/or description)
09.11.2017Despatch of a communication from the examining division (Time limit: M06)
25.04.2018Reply to a communication from the examining division
09.10.2019Communication of intention to grant the patent
06.02.2020Fee for grant paid
06.02.2020Fee for publishing/printing paid
06.02.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  09.11.2017
Opposition(s)21.12.2020No opposition filed within time limit [2021/08]
Fees paidRenewal fee
01.06.2015Renewal fee patent year 03
31.05.2016Renewal fee patent year 04
31.05.2017Renewal fee patent year 05
01.06.2018Renewal fee patent year 06
31.05.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.05.2013
AL18.03.2020
AT18.03.2020
CY18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MK18.03.2020
MT18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
IE28.05.2020
LU28.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
GB18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
[2022/31]
Former [2022/30]HU28.05.2013
AL18.03.2020
AT18.03.2020
CY18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MT18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
IE28.05.2020
LU28.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
GB18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2022/27]HU28.05.2013
AT18.03.2020
CY18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MT18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
IE28.05.2020
LU28.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
GB18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2022/26]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
IE28.05.2020
LU28.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
GB18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/24]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
IE28.05.2020
LU28.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
GB18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/22]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
IE28.05.2020
LU28.05.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
GB18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/20]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
IE28.05.2020
LU28.05.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/15]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
LU28.05.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/10]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/09]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/08]CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/07]CZ18.03.2020
DK18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
CH31.05.2020
LI31.05.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/50]CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/49]CZ18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/48]FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/47]FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RS18.03.2020
SE18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/46]FI18.03.2020
HR18.03.2020
LV18.03.2020
NL18.03.2020
RS18.03.2020
SE18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/45]FI18.03.2020
HR18.03.2020
LV18.03.2020
NL18.03.2020
RS18.03.2020
SE18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
Former [2020/39]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
SE18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
Former [2020/38]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
SE18.03.2020
NO18.06.2020
GR19.06.2020
Former [2020/37]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
SE18.03.2020
NO18.06.2020
Former [2020/35]FI18.03.2020
NO18.06.2020
Cited inInternational search[X]US2006096598  (HO PETER C F [US], et al) [X] 1-13 * paragraph [0093]; figures 20-23 *;
 [X]US7640933  (HO PETER [US]) [X] 1-13* column 6, line 63 - column 7, line 3; figures 6A, 6B *;
 [XPL]WO2013027144  (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [XP] 1-13 * paragraphs [0041] , [0 42]; figures 2, 6 * [L] 1-13
ExaminationUS2004221850
 US2005155604
 US2012138061
 WO2013171617
 WO2013186650
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.