EP2875571 - ELECTRIC MACHINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.04.2021 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 15.05.2020 | ||
Former | Grant of patent is intended Status updated on 29.01.2020 | ||
Former | Examination is in progress Status updated on 09.12.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states emec prototyping GmbH Würzburger Str. 14 01187 Dresden / DE | [2015/47] |
Former [2015/22] | For all designated states Emec-Prototyping UG Franklinstrasse 20 01069 Dresden / DE | Inventor(s) | 01 /
BECKERT, René Behringstr. 42 01159 Dresden / DE | 02 /
RÜCKEMANN, Andreas Gartenstr. 21 01454 Ullersdorf / DE | 03 /
KAMP, Hendrik Luboldtstr. 11b 01324 Dresden / DE | [2015/22] | Representative(s) | Witte, Weller & Partner Patentanwälte mbB Postfach 10 54 62 70047 Stuttgart / DE | [2015/22] | Application number, filing date | 13742200.2 | 23.07.2013 | [2020/25] | WO2013EP65533 | Priority number, date | DE20121014517 | 23.07.2012 Original published format: DE102012014517 | [2015/22] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2014016305 | Date: | 30.01.2014 | Language: | DE | [2014/05] | Type: | A2 Application without search report | No.: | EP2875571 | Date: | 27.05.2015 | Language: | DE | The application published by WIPO in one of the EPO official languages on 30.01.2014 takes the place of the publication of the European patent application. | [2015/22] | Type: | B1 Patent specification | No.: | EP2875571 | Date: | 17.06.2020 | Language: | DE | [2020/25] | Search report(s) | International search report - published on: | EP | 23.10.2014 | Classification | IPC: | H02K16/04, H02K11/33, H02K11/215, // H02K21/14, H02K21/24, H02K21/22 | [2020/02] | CPC: |
H02K16/04 (EP);
H02K11/215 (EP);
H02K11/33 (EP);
H02K21/14 (EP);
H02K21/22 (EP);
H02K21/24 (EP);
|
Former IPC [2015/22] | H02K11/00, H02K16/04, B62M6/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ELEKTRISCHE MASCHINE | [2015/22] | English: | ELECTRIC MACHINE | [2015/22] | French: | MACHINE ÉLECTRIQUE | [2015/22] | Entry into regional phase | 23.02.2015 | National basic fee paid | 23.02.2015 | Designation fee(s) paid | 23.02.2015 | Examination fee paid | Examination procedure | 23.02.2015 | Examination requested [2015/22] | 05.10.2015 | Amendment by applicant (claims and/or description) | 07.12.2016 | Despatch of a communication from the examining division (Time limit: M06) | 14.06.2017 | Reply to a communication from the examining division | 13.10.2017 | Despatch of a communication from the examining division (Time limit: M06) | 23.04.2018 | Reply to a communication from the examining division | 04.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.01.2019 | Reply to a communication from the examining division | 20.05.2019 | Despatch of a communication from the examining division (Time limit: M06) | 27.11.2019 | Reply to a communication from the examining division | 30.01.2020 | Communication of intention to grant the patent | 08.05.2020 | Fee for grant paid | 08.05.2020 | Fee for publishing/printing paid | 08.05.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.12.2016 | Opposition(s) | 18.03.2021 | No opposition filed within time limit [2021/21] | Fees paid | Renewal fee | 22.07.2015 | Renewal fee patent year 03 | 20.07.2016 | Renewal fee patent year 04 | 26.07.2017 | Renewal fee patent year 05 | 25.07.2018 | Renewal fee patent year 06 | 28.11.2019 | Renewal fee patent year 07 | Penalty fee | Additional fee for renewal fee | 31.07.2019 | 07   M06   Fee paid on   28.11.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.07.2013 | AL | 17.06.2020 | CY | 17.06.2020 | CZ | 17.06.2020 | DK | 17.06.2020 | EE | 17.06.2020 | ES | 17.06.2020 | FI | 17.06.2020 | HR | 17.06.2020 | IT | 17.06.2020 | LT | 17.06.2020 | LV | 17.06.2020 | MC | 17.06.2020 | MK | 17.06.2020 | MT | 17.06.2020 | NL | 17.06.2020 | PL | 17.06.2020 | RO | 17.06.2020 | RS | 17.06.2020 | SE | 17.06.2020 | SI | 17.06.2020 | SK | 17.06.2020 | SM | 17.06.2020 | TR | 17.06.2020 | IE | 23.07.2020 | LU | 23.07.2020 | BE | 31.07.2020 | BG | 17.09.2020 | NO | 17.09.2020 | GR | 18.09.2020 | IS | 17.10.2020 | PT | 19.10.2020 | [2022/32] |
Former [2022/27] | HU | 23.07.2013 | |
AL | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
MT | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
TR | 17.06.2020 | ||
IE | 23.07.2020 | ||
LU | 23.07.2020 | ||
BE | 31.07.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2022/26] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
TR | 17.06.2020 | ||
IE | 23.07.2020 | ||
LU | 23.07.2020 | ||
BE | 31.07.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/37] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
IE | 23.07.2020 | ||
LU | 23.07.2020 | ||
BE | 31.07.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/24] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
LU | 23.07.2020 | ||
BE | 31.07.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/20] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
LU | 23.07.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/18] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/10] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/09] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
PT | 19.10.2020 | ||
Former [2021/04] | AL | 17.06.2020 | |
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2021/01] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/51] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/50] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/48] | FI | 17.06.2020 | |
LT | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
Former [2020/47] | LT | 17.06.2020 | |
NO | 17.09.2020 | Cited in | International search | [XYI]WO2009053520 (ABB OY [FI], et al) [X] 1-3,5,6,8,10,11,13,19,21 * abstract * [Y] 14-17 [I] 4,20,23; | [X]GB2456351 (PML FLIGHTLINK LTD [GB], et al) [X] 1 * abstract *; | [Y]US2009309463 (RITZ JR EDWARD FAILING [US], et al) [Y] 14-17,25-27* abstract *; | [X]GB2462940 (PROTEAN HOLDINGS CORP [US]) [X] 1,7,9,12,18,22,24 * abstract *; | [XY]WO2010055534 (THREE TILTING WHEELS S R L [IT], et al) [X] 24 * abstract * [Y] 25-27 | by applicant | EP1450469 | DE102011050504 |