EP2893132 - A TUBULAR CONNECTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.08.2017 Database last updated on 05.07.2024 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Meta Downhole Limited Claymore Drive Aberdeen Energy Park Bridge of Don Aberdeen AB23 8GD / GB | [2015/29] | Inventor(s) | 01 /
O'BRIEN, Daniel 34 Mineralwell View Stonehaven Aberdeenshire AB39 3LA / GB | 02 /
GORRARA, Andrew, John, Joseph 14 Carron Terrace Stonehaven Aberdeenshire AB39 2HX / GB | [2015/29] | Representative(s) | Somervell, Thomas Richard Marks & Clerk LLP Alpha Tower Suffolk Street Queensway Birmingham B1 1TT / GB | [2016/42] |
Former [2015/29] | Campbell, Arlene Meta Downhole Limited Claymore Drive, Aberdeen Energy Park Bridge of Don Aberdeen AB23 8GD / GB | Application number, filing date | 13742676.3 | 27.06.2013 | [2016/42] | WO2013GB51699 | Priority number, date | GB20120012053 | 06.07.2012 Original published format: GB 201212053 | GB20130000442 | 10.01.2013 Original published format: GB 201300442 | [2015/29] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2014006374 | Date: | 09.01.2014 | Language: | EN | [2014/02] | Type: | A2 Application without search report | No.: | EP2893132 | Date: | 15.07.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 09.01.2014 takes the place of the publication of the European patent application. | [2015/29] | Type: | B1 Patent specification | No.: | EP2893132 | Date: | 19.10.2016 | Language: | EN | [2016/42] | Search report(s) | International search report - published on: | EP | 31.12.2014 | Classification | IPC: | E21B43/10 | [2015/29] | CPC: |
E21B43/108 (EP,CN);
E21B43/106 (GB,US);
E21B17/08 (US);
E21B43/101 (GB);
E21B43/103 (GB,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/38] |
Former [2015/29] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ROHRARTIGE VERBINDUNG | [2015/29] | English: | A TUBULAR CONNECTION | [2015/29] | French: | RACCORD TUBULAIRE | [2015/29] | Entry into regional phase | 27.01.2015 | National basic fee paid | 27.01.2015 | Designation fee(s) paid | 27.01.2015 | Examination fee paid | Examination procedure | 27.01.2015 | Examination requested [2015/29] | 20.11.2015 | Amendment by applicant (claims and/or description) | 11.05.2016 | Communication of intention to grant the patent | 09.09.2016 | Fee for grant paid | 09.09.2016 | Fee for publishing/printing paid | 09.09.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.05.2016 | Opposition(s) | 20.07.2017 | No opposition filed within time limit [2017/39] | Fees paid | Renewal fee | 30.06.2015 | Renewal fee patent year 03 | 12.05.2016 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.06.2013 | AL | 19.10.2016 | AT | 19.10.2016 | BE | 19.10.2016 | CY | 19.10.2016 | CZ | 19.10.2016 | EE | 19.10.2016 | ES | 19.10.2016 | FI | 19.10.2016 | HR | 19.10.2016 | IT | 19.10.2016 | LT | 19.10.2016 | LV | 19.10.2016 | MC | 19.10.2016 | MK | 19.10.2016 | PL | 19.10.2016 | RO | 19.10.2016 | RS | 19.10.2016 | SE | 19.10.2016 | SI | 19.10.2016 | SK | 19.10.2016 | SM | 19.10.2016 | TR | 19.10.2016 | BG | 19.01.2017 | GR | 20.01.2017 | IS | 19.02.2017 | PT | 20.02.2017 | LU | 27.06.2017 | MT | 27.06.2017 | CH | 30.06.2017 | DK | 30.06.2017 | FR | 30.06.2017 | LI | 30.06.2017 | NL | 01.07.2017 | [2020/34] |
Former [2020/15] | HU | 27.06.2013 | |
AT | 19.10.2016 | ||
BE | 19.10.2016 | ||
CY | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
MC | 19.10.2016 | ||
MK | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SI | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
TR | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
LU | 27.06.2017 | ||
MT | 27.06.2017 | ||
CH | 30.06.2017 | ||
DK | 30.06.2017 | ||
FR | 30.06.2017 | ||
LI | 30.06.2017 | ||
NL | 01.07.2017 | ||
Former [2019/51] | HU | 27.06.2013 | |
AT | 19.10.2016 | ||
BE | 19.10.2016 | ||
CY | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
MC | 19.10.2016 | ||
MK | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SI | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
LU | 27.06.2017 | ||
MT | 27.06.2017 | ||
CH | 30.06.2017 | ||
DK | 30.06.2017 | ||
FR | 30.06.2017 | ||
LI | 30.06.2017 | ||
NL | 01.07.2017 | ||
Former [2019/48] | HU | 27.06.2013 | |
AT | 19.10.2016 | ||
BE | 19.10.2016 | ||
CY | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
MC | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SI | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
LU | 27.06.2017 | ||
MT | 27.06.2017 | ||
CH | 30.06.2017 | ||
DK | 30.06.2017 | ||
FR | 30.06.2017 | ||
LI | 30.06.2017 | ||
NL | 01.07.2017 | ||
Former [2019/31] | HU | 27.06.2013 | |
AT | 19.10.2016 | ||
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
MC | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SI | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
LU | 27.06.2017 | ||
MT | 27.06.2017 | ||
CH | 30.06.2017 | ||
DK | 30.06.2017 | ||
FR | 30.06.2017 | ||
LI | 30.06.2017 | ||
NL | 01.07.2017 | ||
Former [2018/43] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
MC | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SI | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
LU | 27.06.2017 | ||
MT | 27.06.2017 | ||
CH | 30.06.2017 | ||
DK | 30.06.2017 | ||
FR | 30.06.2017 | ||
LI | 30.06.2017 | ||
NL | 01.07.2017 | ||
Former [2018/35] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
MC | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SI | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
LU | 27.06.2017 | ||
CH | 30.06.2017 | ||
DK | 30.06.2017 | ||
FR | 30.06.2017 | ||
LI | 30.06.2017 | ||
NL | 01.07.2017 | ||
Former [2018/29] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
MC | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SI | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
LU | 27.06.2017 | ||
CH | 30.06.2017 | ||
FR | 30.06.2017 | ||
LI | 30.06.2017 | ||
NL | 01.07.2017 | ||
Former [2018/21] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
MC | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SI | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
LU | 27.06.2017 | ||
CH | 30.06.2017 | ||
LI | 30.06.2017 | ||
NL | 01.07.2017 | ||
Former [2018/17] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
MC | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SI | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
NL | 01.07.2017 | ||
Former [2018/11] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
MC | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SI | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
Former [2017/52] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SI | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
Former [2017/38] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
BG | 19.01.2017 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
Former [2017/37] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
IT | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SK | 19.10.2016 | ||
SM | 19.10.2016 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
Former [2017/36] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
EE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
PL | 19.10.2016 | ||
RO | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
SK | 19.10.2016 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
Former [2017/34] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
CZ | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
PL | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
Former [2017/26] | AT | 19.10.2016 | |
BE | 19.10.2016 | ||
ES | 19.10.2016 | ||
FI | 19.10.2016 | ||
HR | 19.10.2016 | ||
LT | 19.10.2016 | ||
LV | 19.10.2016 | ||
PL | 19.10.2016 | ||
RS | 19.10.2016 | ||
SE | 19.10.2016 | ||
GR | 20.01.2017 | ||
IS | 19.02.2017 | ||
PT | 20.02.2017 | ||
Former [2017/12] | LV | 19.10.2016 | Cited in | International search | [A]US4869319 (SZYMCZAK EDWARD J [US], et al) [A] 1-7,37-55,61-66 * column 3, line 19 - line 23; figures 1,2 *; | [XI]GB2345308 (PETROLINE WELLSYSTEMS LTD [GB], et al) [X] 1-5,37-55,61,64-66 * page 1, line 1 - line 4 * * page 14, line 13 - page 15, line 10 * * figures 1,2 * [I] 6,7,62,63; | [A]US7017670 (HAZEL PAUL RODERICK [GB], et al) [A] 1-7,37-55,61-66* figures 14b,15b,16b *; | [XDI]WO2011048426 (READ WELL SERVICES LTD [GB], et al) [XD] 1-5,37-55,61,64-66 * page 6, line 6 - page 7, line 4; figures 3-5 * [I] 6,7,62,63 | by applicant | WO2011048426 | EP2013445 |