EP2880266 - DUAL-END DRIVE GAS TURBINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.08.2023 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 09.09.2022 | ||
Former | Grant of patent is intended Status updated on 16.06.2022 | ||
Former | Examination is in progress Status updated on 11.08.2017 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Nuovo Pignone S.r.l. Via Felice Matteucci 2 50127 Florence / IT | [2022/41] |
Former [2015/24] | For all designated states Nuovo Pignone S.r.l. Via Felice Matteucci 2 50127 Florence / IT | Inventor(s) | 01 /
GABELLONI, Marco Davide Via Felice Matteucci 2 I-FI 50127 Firenze / IT | 02 /
ACQUISTI, Gianni Villaggio Gattolino 26 I-AR 52100 Arezzo / IT | [2015/24] | Representative(s) | Novagraaf Group Chemin de l'Echo 3 1213 Onex / CH | [2022/41] |
Former [2015/24] | Illingworth-Law, William Illingworth GPO Europe GE International Inc. The Ark 201 Talgarth Road Hammersmith London W6 8BJ / GB | Application number, filing date | 13745390.8 | 01.08.2013 | [2022/41] | WO2013EP66168 | Priority number, date | IT2012FI00161 | 03.08.2012 Original published format: IT FI20120161 | [2015/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014020104 | Date: | 06.02.2014 | Language: | EN | [2014/06] | Type: | A1 Application with search report | No.: | EP2880266 | Date: | 10.06.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.02.2014 takes the place of the publication of the European patent application. | [2015/24] | Type: | B1 Patent specification | No.: | EP2880266 | Date: | 12.10.2022 | Language: | EN | [2022/41] | Search report(s) | International search report - published on: | EP | 06.02.2014 | Classification | IPC: | F01D15/08, F01D15/10, F02C7/36 | [2015/24] | CPC: |
F01D15/08 (EP,KR,RU,US);
F02C7/36 (EP,KR,RU,US);
F02C3/107 (US);
F01D15/10 (EP,KR,RU);
F02C6/00 (KR);
F25J1/0022 (EP,US);
F25J1/0283 (EP,US);
F05D2240/61 (EP,KR,US);
F05D2250/31 (EP,KR,US);
F05D2250/33 (EP,KR,US);
F25J2230/20 (EP,US);
F25J2270/12 (EP,US);
F25J2270/90 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | GASTURBINE MIT DOPPELENDENANTRIEB | [2015/24] | English: | DUAL-END DRIVE GAS TURBINE | [2015/24] | French: | TURBINE À GAZ À ENTRAÎNEMENT PAR LES DEUX EXTRÉMITÉS | [2015/24] | Entry into regional phase | 03.03.2015 | National basic fee paid | 03.03.2015 | Designation fee(s) paid | 03.03.2015 | Examination fee paid | Examination procedure | 12.02.2015 | Amendment by applicant (claims and/or description) | 03.03.2015 | Examination requested [2015/24] | 09.08.2017 | Despatch of a communication from the examining division (Time limit: M06) | 16.02.2018 | Reply to a communication from the examining division | 24.03.2021 | Despatch of a communication from the examining division (Time limit: M06) | 01.10.2021 | Reply to a communication from the examining division | 17.06.2022 | Communication of intention to grant the patent | 02.09.2022 | Fee for grant paid | 02.09.2022 | Fee for publishing/printing paid | 02.09.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.08.2017 | Opposition(s) | 13.07.2023 | No opposition filed within time limit [2023/38] | Fees paid | Renewal fee | 31.08.2015 | Renewal fee patent year 03 | 31.08.2016 | Renewal fee patent year 04 | 31.08.2017 | Renewal fee patent year 05 | 31.08.2018 | Renewal fee patent year 06 | 20.08.2019 | Renewal fee patent year 07 | 19.08.2020 | Renewal fee patent year 08 | 18.08.2021 | Renewal fee patent year 09 | 19.08.2022 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 12.10.2022 | AT | 12.10.2022 | CZ | 12.10.2022 | DK | 12.10.2022 | EE | 12.10.2022 | ES | 12.10.2022 | FI | 12.10.2022 | HR | 12.10.2022 | IT | 12.10.2022 | LT | 12.10.2022 | LV | 12.10.2022 | MC | 12.10.2022 | NL | 12.10.2022 | PL | 12.10.2022 | RO | 12.10.2022 | RS | 12.10.2022 | SE | 12.10.2022 | SI | 12.10.2022 | SK | 12.10.2022 | SM | 12.10.2022 | NO | 12.01.2023 | GR | 13.01.2023 | IS | 12.02.2023 | PT | 13.02.2023 | [2024/26] |
Former [2024/16] | AL | 12.10.2022 | |
AT | 12.10.2022 | ||
CZ | 12.10.2022 | ||
DK | 12.10.2022 | ||
EE | 12.10.2022 | ||
ES | 12.10.2022 | ||
FI | 12.10.2022 | ||
HR | 12.10.2022 | ||
LT | 12.10.2022 | ||
LV | 12.10.2022 | ||
MC | 12.10.2022 | ||
NL | 12.10.2022 | ||
PL | 12.10.2022 | ||
RO | 12.10.2022 | ||
RS | 12.10.2022 | ||
SE | 12.10.2022 | ||
SI | 12.10.2022 | ||
SK | 12.10.2022 | ||
SM | 12.10.2022 | ||
NO | 12.01.2023 | ||
GR | 13.01.2023 | ||
IS | 12.02.2023 | ||
PT | 13.02.2023 | ||
Former [2023/51] | AL | 12.10.2022 | |
AT | 12.10.2022 | ||
CZ | 12.10.2022 | ||
DK | 12.10.2022 | ||
EE | 12.10.2022 | ||
ES | 12.10.2022 | ||
FI | 12.10.2022 | ||
HR | 12.10.2022 | ||
LT | 12.10.2022 | ||
LV | 12.10.2022 | ||
NL | 12.10.2022 | ||
PL | 12.10.2022 | ||
RO | 12.10.2022 | ||
RS | 12.10.2022 | ||
SE | 12.10.2022 | ||
SI | 12.10.2022 | ||
SK | 12.10.2022 | ||
SM | 12.10.2022 | ||
NO | 12.01.2023 | ||
GR | 13.01.2023 | ||
IS | 12.02.2023 | ||
PT | 13.02.2023 | ||
Former [2023/38] | AL | 12.10.2022 | |
AT | 12.10.2022 | ||
CZ | 12.10.2022 | ||
DK | 12.10.2022 | ||
EE | 12.10.2022 | ||
ES | 12.10.2022 | ||
FI | 12.10.2022 | ||
HR | 12.10.2022 | ||
LT | 12.10.2022 | ||
LV | 12.10.2022 | ||
NL | 12.10.2022 | ||
PL | 12.10.2022 | ||
RO | 12.10.2022 | ||
RS | 12.10.2022 | ||
SE | 12.10.2022 | ||
SK | 12.10.2022 | ||
SM | 12.10.2022 | ||
NO | 12.01.2023 | ||
GR | 13.01.2023 | ||
IS | 12.02.2023 | ||
PT | 13.02.2023 | ||
Former [2023/37] | AL | 12.10.2022 | |
AT | 12.10.2022 | ||
CZ | 12.10.2022 | ||
DK | 12.10.2022 | ||
EE | 12.10.2022 | ||
ES | 12.10.2022 | ||
FI | 12.10.2022 | ||
HR | 12.10.2022 | ||
LT | 12.10.2022 | ||
LV | 12.10.2022 | ||
NL | 12.10.2022 | ||
PL | 12.10.2022 | ||
RO | 12.10.2022 | ||
RS | 12.10.2022 | ||
SE | 12.10.2022 | ||
SM | 12.10.2022 | ||
NO | 12.01.2023 | ||
GR | 13.01.2023 | ||
IS | 12.02.2023 | ||
PT | 13.02.2023 | ||
Former [2023/35] | AT | 12.10.2022 | |
CZ | 12.10.2022 | ||
DK | 12.10.2022 | ||
EE | 12.10.2022 | ||
ES | 12.10.2022 | ||
FI | 12.10.2022 | ||
HR | 12.10.2022 | ||
LT | 12.10.2022 | ||
LV | 12.10.2022 | ||
NL | 12.10.2022 | ||
PL | 12.10.2022 | ||
RO | 12.10.2022 | ||
RS | 12.10.2022 | ||
SE | 12.10.2022 | ||
SM | 12.10.2022 | ||
NO | 12.01.2023 | ||
GR | 13.01.2023 | ||
IS | 12.02.2023 | ||
PT | 13.02.2023 | ||
Former [2023/34] | AT | 12.10.2022 | |
DK | 12.10.2022 | ||
EE | 12.10.2022 | ||
ES | 12.10.2022 | ||
FI | 12.10.2022 | ||
HR | 12.10.2022 | ||
LT | 12.10.2022 | ||
LV | 12.10.2022 | ||
NL | 12.10.2022 | ||
PL | 12.10.2022 | ||
RS | 12.10.2022 | ||
SE | 12.10.2022 | ||
SM | 12.10.2022 | ||
NO | 12.01.2023 | ||
GR | 13.01.2023 | ||
IS | 12.02.2023 | ||
PT | 13.02.2023 | ||
Former [2023/33] | AT | 12.10.2022 | |
DK | 12.10.2022 | ||
ES | 12.10.2022 | ||
FI | 12.10.2022 | ||
HR | 12.10.2022 | ||
LT | 12.10.2022 | ||
LV | 12.10.2022 | ||
NL | 12.10.2022 | ||
PL | 12.10.2022 | ||
RS | 12.10.2022 | ||
SE | 12.10.2022 | ||
SM | 12.10.2022 | ||
NO | 12.01.2023 | ||
GR | 13.01.2023 | ||
IS | 12.02.2023 | ||
PT | 13.02.2023 | ||
Former [2023/26] | AT | 12.10.2022 | |
ES | 12.10.2022 | ||
FI | 12.10.2022 | ||
HR | 12.10.2022 | ||
LT | 12.10.2022 | ||
LV | 12.10.2022 | ||
NL | 12.10.2022 | ||
PL | 12.10.2022 | ||
RS | 12.10.2022 | ||
SE | 12.10.2022 | ||
NO | 12.01.2023 | ||
GR | 13.01.2023 | ||
IS | 12.02.2023 | ||
PT | 13.02.2023 | ||
Former [2023/24] | AT | 12.10.2022 | |
ES | 12.10.2022 | ||
FI | 12.10.2022 | ||
HR | 12.10.2022 | ||
LT | 12.10.2022 | ||
LV | 12.10.2022 | ||
NL | 12.10.2022 | ||
SE | 12.10.2022 | ||
NO | 12.01.2023 | ||
GR | 13.01.2023 | ||
PT | 13.02.2023 | ||
Former [2023/23] | AT | 12.10.2022 | |
ES | 12.10.2022 | ||
FI | 12.10.2022 | ||
LT | 12.10.2022 | ||
LV | 12.10.2022 | ||
NL | 12.10.2022 | ||
SE | 12.10.2022 | ||
NO | 12.01.2023 | ||
GR | 13.01.2023 | ||
PT | 13.02.2023 | ||
Former [2023/22] | AT | 12.10.2022 | |
ES | 12.10.2022 | ||
FI | 12.10.2022 | ||
LT | 12.10.2022 | ||
NL | 12.10.2022 | ||
SE | 12.10.2022 | ||
NO | 12.01.2023 | ||
PT | 13.02.2023 | ||
Former [2023/20] | LT | 12.10.2022 | |
NL | 12.10.2022 | ||
NO | 12.01.2023 | ||
Former [2023/17] | NL | 12.10.2022 | Cited in | International search | [XYI]WO2005003533 (HANFORD N LOCKWOOD JR [US], et al) [X] 1-3,8,11,14-18 * the whole document * * paragraphs [0002] - [0004] - [0048] , [0049] , [0078] * * figure 1 * [Y] 10,12,20 [I] 4-7,9,13,19; | [A]US2007012129 (MATY RONALD P [US], et al) [A] 1-20 * the whole document * * paragraphs [0021] , [0022] ** figures 1,2 *; | [YA]WO2009073838 (DRESSER RAND CO [US], et al) [Y] 10,12,20 * the whole document * * paragraphs [0026] - [0028] - [0048] * * figures 1-3,15 * [A] 1-3,8,16; | [A]EP2241725 (GEN ELECTRIC [US]) [A] 1-20 * the whole document * * paragraphs [0019] , [0020] , [0023] - [0025] * * figures 1,4-6 *; | [XI]US8049353 (ENG DARRYL S [US], et al) [X] 1,2,8,11,14,16,17 * the whole document * * column 3, lines 30-67 * * figures 1,2 * [I] 3,13 |