EP2893373 - HIGH-ENERGY DOSIMETER APPARATUS [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 19.04.2019 Database last updated on 19.10.2024 | |
Former | Examination is in progress Status updated on 18.05.2018 | Most recent event Tooltip | 19.04.2019 | Application deemed to be withdrawn | published on 22.05.2019 [2019/21] | Applicant(s) | For all designated states GSI Helmholtzzentrum für Schwerionenforschung GmbH Planckstrasse 1 64291 Darmstadt / DE | [2015/29] | Inventor(s) | 01 /
FEHRENBACHER, Georg Bohlenmühlenweg 13 64367 Mühltal / DE | 02 /
SOKOLOV, Alexey Arheilger Woogstr. 78 64291 Darmstadt / DE | [2015/29] | Application number, filing date | 13745691.9 | 08.08.2013 | WO2013EP66621 | Priority number, date | DE201210108174 | 04.09.2012 Original published format: DE102012108174 | [2015/29] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2014037184 | Date: | 13.03.2014 | Language: | DE | [2014/11] | Type: | A1 Application with search report | No.: | EP2893373 | Date: | 15.07.2015 | Language: | DE | The application published by WIPO in one of the EPO official languages on 13.03.2014 takes the place of the publication of the European patent application. | [2015/29] | Search report(s) | International search report - published on: | EP | 13.03.2014 | Classification | IPC: | G01T1/10 | [2015/29] | CPC: |
G01T1/10 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/29] | Title | German: | HOCHENERGIEDOSIMETERVORRICHTUNG | [2015/29] | English: | HIGH-ENERGY DOSIMETER APPARATUS | [2015/29] | French: | DISPOSITIF DOSIMÈTRE À HAUTE ÉNERGIE | [2015/29] | Entry into regional phase | 27.03.2015 | National basic fee paid | 27.03.2015 | Designation fee(s) paid | 27.03.2015 | Examination fee paid | Examination procedure | 27.03.2015 | Examination requested [2015/29] | 25.06.2015 | Amendment by applicant (claims and/or description) | 22.05.2018 | Despatch of a communication from the examining division (Time limit: M06) | 04.12.2018 | Application deemed to be withdrawn, date of legal effect [2019/21] | 11.01.2019 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time [2019/21] | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.05.2018 | Fees paid | Renewal fee | 27.08.2015 | Renewal fee patent year 03 | 30.08.2016 | Renewal fee patent year 04 | 31.08.2017 | Renewal fee patent year 05 | 30.08.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [XY]US2006043299 (SMITH LEON E [US] ET AL SMITH LEON ERIC [US] ET AL) [X] 1,2,5,6,8,11-14 * figures 2a, 2b * * paragraph [0018] - paragraph [0022] * * paragraph [0037] * [Y] 4,7,9,10; | [Y]WO2009062639 (GSI HELMHOLTZZENTR SCHWERIONEN [DE]; FEHRENBACHER GEORG [DE]; FESTAG J) [Y] 4,9 * figure 2 * * page 7, line 8 - line 10 * * page 20, line 20 - line 23 *; | [Y]US3789227 (EICHNER F ET AL) [Y] 7 * figure 1 * * column 2, line 57 - line 64 *; | [Y]WO2011125053 (LANDAUER INC [US]; YODER CRAIG R [US]; AKSELROD MARK S [US]; DILLIN KE) [Y] 10 * paragraph [0236]; figures 10,11 * | Examination | US4492872 | WO2004077097 |