blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2880077

EP2880077 - METHOD FOR THE PREPARATION OF POLYALKYLENE TEREPHTHALATE RESIN COMPOSITIONS EMPLOYING TITANIUM-CONTAINING CATALYST COMPLEX [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.07.2022
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  23.07.2021
FormerGrant of patent is intended
Status updated on  21.01.2021
FormerExamination is in progress
Status updated on  24.07.2020
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
SABIC Global Technologies B.V.
Plasticslaan 1
4612 PX Bergen op Zoom / NL
[2021/34]
Former [2016/31]For all designated states
SABIC Global Technologies B.V.
Plasticslaan 1
4612 PX Bergen op Zoom / NL
Former [2015/24]For all designated states
SABIC Innovative Plastics IP B.V.
Plasticslaan 1
4612 PX Bergen op Zoom / NL
Inventor(s)01 / KANNAN, Ganesh
1 Lexan Lane
Mt. Vernon, Indiana 47620-9367 / US
02 / DING, Tianhua
1 Lexan Lane
Mt. Vernon, Indiana 47620-9367 / US
03 / TUKARAM, Gunale
Flat F1
783 C Block
AECS Layout
Kundalahalli Bangalore 562107 / IN
 [2015/24]
Representative(s)Sabic Intellectual Property Group
Sabic Intellectual Property Department
P.O. Box 3008
6160 GA Geleen / NL
[2021/34]
Former [2015/24]Stiebe, Lars Magnus, et al
Balder
Paseo de la Castellana 93
28046 Madrid / ES
Application number, filing date13747558.825.07.2013
[2021/34]
WO2013US52057
Priority number, dateUS201261677224P30.07.2012         Original published format: US 201261677224 P
[2015/24]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014022196
Date:06.02.2014
Language:EN
[2014/06]
Type: A1 Application with search report 
No.:EP2880077
Date:10.06.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 06.02.2014 takes the place of the publication of the European patent application.
[2015/24]
Type: B1 Patent specification 
No.:EP2880077
Date:25.08.2021
Language:EN
[2021/34]
Search report(s)International search report - published on:EP06.02.2014
ClassificationIPC:C08G63/85, C08L67/02, C08G63/183
[2015/24]
CPC:
C08G63/183 (EP,KR,US); C08G63/85 (EP,KR,US); C08L67/02 (US);
C08K3/40 (KR,US); C08K5/103 (KR,US); C08L67/06 (KR,US);
C08L69/00 (KR,US); Y02P20/582 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/24]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON POLYALKYLENTEREPHTHALATHARZZUSAMMENSETZUNGEN MIT EINEM TITANHALTIGEN KATALYSATORKOMPLEX[2015/24]
English:METHOD FOR THE PREPARATION OF POLYALKYLENE TEREPHTHALATE RESIN COMPOSITIONS EMPLOYING TITANIUM-CONTAINING CATALYST COMPLEX[2015/24]
French:PROCÉDÉ DE PRÉPARATION DE COMPOSITIONS DE RÉSINE DE POLY(ALKYLÈNE TÉRÉPHTALATE) EMPLOYANT UN COMPLEXE DE CATALYSEUR CONTENANT DU TITANE[2015/24]
Entry into regional phase27.10.2014National basic fee paid 
27.10.2014Designation fee(s) paid 
27.10.2014Examination fee paid 
Examination procedure27.10.2014Examination requested  [2015/24]
27.07.2015Amendment by applicant (claims and/or description)
23.07.2020Despatch of a communication from the examining division (Time limit: M04)
11.11.2020Reply to a communication from the examining division
22.01.2021Communication of intention to grant the patent
25.06.2021Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time
16.07.2021Fee for grant paid
16.07.2021Fee for publishing/printing paid
16.07.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  23.07.2020
Opposition(s)27.05.2022No opposition filed within time limit [2022/31]
Request for further processing for:The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent
16.07.2021Request for further processing filed
16.07.2021Full payment received (date of receipt of payment)
Request granted
27.07.2021Decision despatched
Fees paidRenewal fee
10.07.2015Renewal fee patent year 03
11.07.2016Renewal fee patent year 04
12.07.2017Renewal fee patent year 05
11.07.2018Renewal fee patent year 06
15.07.2019Renewal fee patent year 07
14.07.2020Renewal fee patent year 08
15.07.2021Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.07.2013
AL25.08.2021
AT25.08.2021
CY25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
MK25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
[2024/22]
Former [2024/20]HU25.07.2013
AL25.08.2021
AT25.08.2021
CY25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2024/18]HU25.07.2013
AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2023/11]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/36]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/29]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/26]AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/24]AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/21]AT25.08.2021
DK25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/16]AT25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/10]AT25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
PL25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/09]AT25.08.2021
ES25.08.2021
FI25.08.2021
LT25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
PT27.12.2021
Former [2022/08]AT25.08.2021
ES25.08.2021
FI25.08.2021
LT25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
Former [2022/07]AT25.08.2021
LT25.08.2021
NO25.11.2021
Cited inInternational search[XAI]EP0634435  (GEN ELECTRIC [US]) [X] 1,3,5,16,18-20 * page 6, line 6 - page 7, line 58; examples 3-8; claims 4, 6, 9-11, 15, 16, 27; table 1 * [A] 9,10 [I] 2,4,6-8,11-15,17,21,22;
 [XAI]WO9928033  (TIOXIDE SPECIALTIES LTD [GB], et al) [X] 1-3,5-8,11,16,18-20 * page 7, line 22 - page 8, line 2; examples 3, 5, 15, 17 Sample B; claim 20; table 4 * [A] 9,10,21,22 [I] 4,12-15,17;
 [IA]US6066714  (PUTZIG DONALD EDWARD [US], et al) [I] 1-3,5-8,10-20 * column 1, line 62 - column 6, line 15; examples Procedure B, Procedure C, Control A, 2, 4; claims 1, 7; tables 1, 2 * [A] 4,9,21,22;
 [A]EP1013692  (MITSUI CHEMICALS INC [JP]) [A] 1-22* paragraph [0076] - paragraph [0105]; claims 1-3, 17, 18, 32 *;
 [XAI]US6303738  (PUTZIG DONALD EDWARD [US], et al) [X] 1,3,5-8,16,18,19 * column 5, line 24 - column 5, line 36; example 3 * [A] 9,10,22 [I] 2,4,11-15,17,20,21;
 [XPI]US2013018143  (ALIDEDEOGLU HUSNU ALP [US], et al) [XP] 1-19,22 * examples 1-10; tables 1-12 * [I] 20,21
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.