EP2890552 - METHOD FOR PRODUCING A ROTOR BLADE AND ROTOR BLADE OF A WIND TURBINE [Right-click to bookmark this link] | Status | Patent maintained as amended Status updated on 19.04.2024 Database last updated on 03.04.2025 | Most recent event Tooltip | 19.04.2024 | Patent maintained (B2 publication) | published on 22.05.2024 [2024/21] | Applicant(s) | For all designated states Siemens Gamesa Renewable Energy Service GmbH Beim Strohhause 17-31 20097 Hamburg / DE | [2022/10] |
Former [2022/07] | For all designated states Siemens Gamesa Renewable Energy Service GmbH Überseering 10 22297 Hamburg / DE | ||
Former [2015/36] | For all designated states Senvion GmbH Überseering 10 22297 Hamburg / DE | ||
Former [2015/28] | For all designated states SENVION SE Überseering 10 22297 Hamburg / DE | Inventor(s) | 01 /
EYB, Enno Kantstraße 80 24116 Kiel / DE | [2015/28] | Representative(s) | Groth, Wieland Patentanwalt Zippelhaus 4 20457 Hamburg / DE | [2016/41] |
Former [2015/28] | Groth, Wieland Schopenstehl 22 20095 Hamburg / DE | Application number, filing date | 13747816.0 | 01.08.2013 | [2016/41] | WO2013EP66173 | Priority number, date | DE201210107932 | 28.08.2012 Original published format: DE102012107932 | [2015/28] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2014032901 | Date: | 06.03.2014 | Language: | DE | [2014/10] | Type: | A1 Application with search report | No.: | EP2890552 | Date: | 08.07.2015 | Language: | DE | The application published by WIPO in one of the EPO official languages on 06.03.2014 takes the place of the publication of the European patent application. | [2015/28] | Type: | B1 Patent specification | No.: | EP2890552 | Date: | 12.10.2016 | Language: | DE | [2016/41] | Type: | B2 New European patent specification | No.: | EP2890552 | Date: | 22.05.2024 | Language: | DE | [2024/21] | Search report(s) | International search report - published on: | EP | 06.03.2014 | Classification | IPC: | B29D99/00, B29C70/44, B29C70/48, B29C70/54, B29C44/56, B29C70/86, B29C67/24, F01D5/28, // B29L31/08, B29K27/06, B29K75/00, B29K25/00 | [2016/17] | CPC: |
B29C70/443 (EP,US);
B29C67/246 (US);
B29C44/5618 (EP,US);
B29C70/865 (EP,US);
B29D99/0025 (EP,US);
F01D5/282 (US);
B29K2025/06 (EP,US);
B29K2025/08 (EP,US);
B29K2027/06 (EP,US);
B29K2075/00 (EP,US);
B29K2625/06 (EP,US);
B29K2715/003 (EP,US);
|
Former IPC [2015/28] | B29D99/00, B29C70/44, B29C70/48, B29C70/54, B29C44/56, B29L31/08, B29K27/06, B29K75/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/28] | Title | German: | VERFAHREN ZUR FERTIGUNG EINES ROTORBLATTES UND EIN ROTORBLATT EINER WINDENERGIEANLAGE | [2015/28] | English: | METHOD FOR PRODUCING A ROTOR BLADE AND ROTOR BLADE OF A WIND TURBINE | [2015/28] | French: | PROCÉDÉ DE RÉALISATION D'UNE PALE DE ROTOR ET PALE DE ROTOR D'ÉOLIENNE | [2015/28] | Entry into regional phase | 25.02.2015 | National basic fee paid | 25.02.2015 | Designation fee(s) paid | 25.02.2015 | Examination fee paid | Examination procedure | 25.02.2015 | Examination requested [2015/28] | 11.04.2016 | Communication of intention to grant the patent | 12.08.2016 | Fee for grant paid | 12.08.2016 | Fee for publishing/printing paid | 12.08.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.04.2016 | Opposition(s) | Opponent(s) | 01
12.07.2017
ADMISSIBLE Vestas Wind Systems A/S Hedeager 44 8200 Aarhus N / DK Opponent's representative Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2017/33] | 18.08.2017 | Invitation to proprietor to file observations on the notice of opposition | 22.12.2017 | Reply of patent proprietor to notice(s) of opposition | 21.02.2019 | Date of oral proceedings | 10.05.2019 | Despatch of interlocutory decision in opposition | 10.05.2019 | Despatch of minutes of oral proceedings | 28.06.2023 | Legal effect of interlocutory decision in opposition | 23.01.2024 | Despatch of communication that the patent will be maintained as amended | 25.01.2024 | Fee for printing new specification paid | Appeal following opposition | 19.07.2019 | Appeal received No. T2106/19 | 17.09.2019 | Statement of grounds filed | 28.06.2023 | Result of appeal procedure: appeal of the opponent was rejected | 21.12.2023 | Despatch of the decision of the Board of Appeal | 28.06.2023 | Date of oral proceedings | Fees paid | Renewal fee | 31.08.2015 | Renewal fee patent year 03 | 30.08.2016 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.08.2013 | AL | 12.10.2016 | CY | 12.10.2016 | CZ | 12.10.2016 | EE | 12.10.2016 | FI | 12.10.2016 | HR | 12.10.2016 | IT | 12.10.2016 | LT | 12.10.2016 | LV | 12.10.2016 | MC | 12.10.2016 | MK | 12.10.2016 | MT | 12.10.2016 | NL | 12.10.2016 | PL | 12.10.2016 | RO | 12.10.2016 | RS | 12.10.2016 | SE | 12.10.2016 | SI | 12.10.2016 | SK | 12.10.2016 | SM | 12.10.2016 | TR | 12.10.2016 | BG | 12.01.2017 | NO | 12.01.2017 | GR | 13.01.2017 | IS | 12.02.2017 | PT | 13.02.2017 | IE | 01.08.2017 | LU | 01.08.2017 | BE | 31.08.2017 | CH | 31.08.2017 | LI | 31.08.2017 | AT | 01.08.2018 | [2020/34] |
Former [2020/15] | HU | 01.08.2013 | |
CY | 12.10.2016 | ||
CZ | 12.10.2016 | ||
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
MC | 12.10.2016 | ||
MK | 12.10.2016 | ||
MT | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SI | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
TR | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
IE | 01.08.2017 | ||
LU | 01.08.2017 | ||
BE | 31.08.2017 | ||
CH | 31.08.2017 | ||
LI | 31.08.2017 | ||
AT | 01.08.2018 | ||
Former [2020/03] | HU | 01.08.2013 | |
CY | 12.10.2016 | ||
CZ | 12.10.2016 | ||
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
MC | 12.10.2016 | ||
MK | 12.10.2016 | ||
MT | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SI | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
IE | 01.08.2017 | ||
LU | 01.08.2017 | ||
BE | 31.08.2017 | ||
CH | 31.08.2017 | ||
LI | 31.08.2017 | ||
AT | 01.08.2018 | ||
Former [2019/51] | HU | 01.08.2013 | |
CY | 12.10.2016 | ||
CZ | 12.10.2016 | ||
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
MC | 12.10.2016 | ||
MK | 12.10.2016 | ||
MT | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SI | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
IE | 01.08.2017 | ||
LU | 01.08.2017 | ||
BE | 31.08.2017 | ||
CH | 31.08.2017 | ||
LI | 31.08.2017 | ||
Former [2019/47] | HU | 01.08.2013 | |
CY | 12.10.2016 | ||
CZ | 12.10.2016 | ||
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
MC | 12.10.2016 | ||
MT | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SI | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
IE | 01.08.2017 | ||
LU | 01.08.2017 | ||
BE | 31.08.2017 | ||
CH | 31.08.2017 | ||
LI | 31.08.2017 | ||
Former [2019/31] | HU | 01.08.2013 | |
CZ | 12.10.2016 | ||
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
MC | 12.10.2016 | ||
MT | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SI | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
IE | 01.08.2017 | ||
LU | 01.08.2017 | ||
BE | 31.08.2017 | ||
CH | 31.08.2017 | ||
LI | 31.08.2017 | ||
Former [2018/43] | CZ | 12.10.2016 | |
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
MC | 12.10.2016 | ||
MT | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SI | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
IE | 01.08.2017 | ||
LU | 01.08.2017 | ||
BE | 31.08.2017 | ||
CH | 31.08.2017 | ||
LI | 31.08.2017 | ||
Former [2018/39] | CZ | 12.10.2016 | |
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
MC | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SI | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
IE | 01.08.2017 | ||
LU | 01.08.2017 | ||
BE | 31.08.2017 | ||
CH | 31.08.2017 | ||
LI | 31.08.2017 | ||
Former [2018/34] | CZ | 12.10.2016 | |
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
MC | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SI | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
IE | 01.08.2017 | ||
LU | 01.08.2017 | ||
CH | 31.08.2017 | ||
LI | 31.08.2017 | ||
Former [2018/21] | CZ | 12.10.2016 | |
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
MC | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SI | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
CH | 31.08.2017 | ||
LI | 31.08.2017 | ||
Former [2018/18] | CZ | 12.10.2016 | |
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
MC | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SI | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
Former [2017/52] | CZ | 12.10.2016 | |
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SI | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
Former [2017/38] | CZ | 12.10.2016 | |
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
BG | 12.01.2017 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
Former [2017/37] | CZ | 12.10.2016 | |
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
IT | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SK | 12.10.2016 | ||
SM | 12.10.2016 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
Former [2017/36] | CZ | 12.10.2016 | |
EE | 12.10.2016 | ||
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RO | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
SK | 12.10.2016 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
Former [2017/34] | CZ | 12.10.2016 | |
FI | 12.10.2016 | ||
HR | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
Former [2017/26] | FI | 12.10.2016 | |
HR | 12.10.2016 | ||
LT | 12.10.2016 | ||
LV | 12.10.2016 | ||
NL | 12.10.2016 | ||
PL | 12.10.2016 | ||
RS | 12.10.2016 | ||
SE | 12.10.2016 | ||
NO | 12.01.2017 | ||
GR | 13.01.2017 | ||
IS | 12.02.2017 | ||
PT | 13.02.2017 | ||
Former [2017/12] | LV | 12.10.2016 | Cited in | International search | [A]GB2410458 (IRVING DAVID [GB]); | [A]EP1779997 (GEN ELECTRIC [US]); | [A]US2010261000 (JONES DANIEL THOMAS [GB]); | [A]WO2011081662 (DOW GOLBAL TECHNOLOGIES INC [US], et al); | [A]DE102010002131 (WOBBEN ALOYS [DE]) | Opposition | DE10156123 | GB2410458 | WO2007038930 | EP1779997 | WO2009003477 | WO2009003476 | WO2009047483 | US2010261000 | US2011076442 | WO2011035541 | EP2309124 | WO2011081662 | DE102010002131 | DE102010013405 |