EP2819456 - METHOD, AND DEVICE FOR CONTROLLING NETWORK CONGESTION [Right-click to bookmark this link] | |||
Former [2015/01] | METHOD, DEVICE AND NETWORK SYSTEM FOR CONTROLLING NETWORK CONGESTION | ||
[2019/04] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 22.05.2024 | |
Former | The patent has been granted Status updated on 24.05.2019 | ||
Former | Grant of patent is intended Status updated on 07.01.2019 | ||
Former | Examination is in progress Status updated on 06.10.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2019/26] |
Former [2015/01] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian, Longgang Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
WU, Tianyu Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | 02 /
CHEN, Chen Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | 03 /
HAO, Shuai Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | [2015/01] | Representative(s) | Isarpatent Patent- und Rechtsanwälte Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | [N/P] |
Former [2019/26] | Isarpatent Patent- und Rechtsanwälte Behnisch Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | ||
Former [2015/01] | Isarpatent Patent- und Rechtsanwälte Friedrichstrasse 31 80801 München / DE | Application number, filing date | 13751226.5 | 25.02.2013 | [2019/26] | WO2013CN71814 | Priority number, date | CN20121044152 | 24.02.2012 Original published format: CN201210044152 | [2015/01] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013123903 | Date: | 29.08.2013 | Language: | ZH | [2013/35] | Type: | A1 Application with search report | No.: | EP2819456 | Date: | 31.12.2014 | Language: | EN | [2015/01] | Type: | B1 Patent specification | No.: | EP2819456 | Date: | 26.06.2019 | Language: | EN | [2019/26] | Search report(s) | International search report - published on: | CN | 29.08.2013 | (Supplementary) European search report - dispatched on: | EP | 05.02.2015 | Classification | IPC: | H04W28/02, H04W28/12 | [2015/01] | CPC: |
H04W28/0289 (EP,US);
H04W74/085 (EP,US);
H04W84/12 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN, UND VORRICHTUNG ZUR NETZWERKÜBERLASTUNGSSTEUERUNG | [2019/04] | English: | METHOD, AND DEVICE FOR CONTROLLING NETWORK CONGESTION | [2019/04] | French: | PROCÉDÉ, ET DISPOSITIF PERMETTANT DE COMMANDER UNE CONGESTION DE RÉSEAU | [2019/04] |
Former [2015/01] | VERFAHREN, VORRICHTUNG UND NETZWERKSYSTEM ZUR NETZWERKÜBERLASTUNGSSTEUERUNG | ||
Former [2015/01] | METHOD, DEVICE AND NETWORK SYSTEM FOR CONTROLLING NETWORK CONGESTION | ||
Former [2015/01] | PROCÉDÉ, DISPOSITIF ET SYSTÈME DE RÉSEAU PERMETTANT DE COMMANDER UNE CONGESTION DE RÉSEAU | Entry into regional phase | 28.08.2014 | Translation filed | 28.08.2014 | National basic fee paid | 28.08.2014 | Search fee paid | 28.08.2014 | Designation fee(s) paid | 28.08.2014 | Examination fee paid | Examination procedure | 28.08.2014 | Examination requested [2015/01] | 12.08.2015 | Amendment by applicant (claims and/or description) | 06.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 25.01.2018 | Reply to a communication from the examining division | 08.01.2019 | Communication of intention to grant the patent | 27.04.2019 | Fee for grant paid | 27.04.2019 | Fee for publishing/printing paid | 16.05.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.10.2017 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 27.02.2015 | Renewal fee patent year 03 | 29.02.2016 | Renewal fee patent year 04 | 28.02.2017 | Renewal fee patent year 05 | 28.02.2018 | Renewal fee patent year 06 | 28.02.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.02.2013 | AL | 26.06.2019 | AT | 26.06.2019 | CY | 26.06.2019 | CZ | 26.06.2019 | DK | 26.06.2019 | EE | 26.06.2019 | ES | 26.06.2019 | FI | 26.06.2019 | HR | 26.06.2019 | IT | 26.06.2019 | LT | 26.06.2019 | LV | 26.06.2019 | MC | 26.06.2019 | MK | 26.06.2019 | MT | 26.06.2019 | NL | 26.06.2019 | PL | 26.06.2019 | RO | 26.06.2019 | RS | 26.06.2019 | SE | 26.06.2019 | SI | 26.06.2019 | SK | 26.06.2019 | SM | 26.06.2019 | TR | 26.06.2019 | BG | 26.09.2019 | NO | 26.09.2019 | GR | 27.09.2019 | IS | 26.10.2019 | PT | 28.10.2019 | GB | 25.02.2020 | IE | 25.02.2020 | LU | 25.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | FR | 29.02.2020 | LI | 29.02.2020 | [2022/32] |
Former [2022/27] | HU | 25.02.2013 | |
AL | 26.06.2019 | ||
AT | 26.06.2019 | ||
CY | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
MT | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
GB | 25.02.2020 | ||
IE | 25.02.2020 | ||
LU | 25.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/10] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
GB | 25.02.2020 | ||
IE | 25.02.2020 | ||
LU | 25.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/08] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
GB | 25.02.2020 | ||
IE | 25.02.2020 | ||
LU | 25.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/07] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
IE | 25.02.2020 | ||
LU | 25.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/52] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
LU | 25.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/49] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
LU | 25.02.2020 | ||
Former [2020/48] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
LU | 25.02.2020 | ||
Former [2020/37] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/36] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/24] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
PT | 28.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/22] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/17] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/13] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/12] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/11] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
PT | 28.10.2019 | ||
Former [2020/10] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
PT | 28.10.2019 | ||
Former [2020/09] | AL | 26.06.2019 | |
CZ | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
Former [2020/07] | AL | 26.06.2019 | |
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
Former [2019/51] | AL | 26.06.2019 | |
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
Former [2019/50] | AL | 26.06.2019 | |
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
Former [2019/49] | AL | 26.06.2019 | |
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
SE | 26.06.2019 | ||
NO | 26.09.2019 | ||
Former [2019/48] | FI | 26.06.2019 | |
LT | 26.06.2019 | ||
SE | 26.06.2019 | ||
NO | 26.09.2019 | ||
Former [2019/47] | FI | 26.06.2019 | |
LT | 26.06.2019 | ||
NO | 26.09.2019 | Documents cited: | Search | [XI]US2005094558 (LU GUANG [CA]) [X] 1,3,7,9,12,14,18,20 * abstract * * paragraph [0039] - paragraph [0045] * [I] 2,4-6,8,10,11,13,15-17,19,21,22; | [XI]EP2180751 (PANTECH CO LTD [KR]) [X] 1,2,7,8,12,13,18,19 * abstract * * paragraph [0013] - paragraph [0014] * * paragraph [0042] - paragraph [0046] * * paragraph [0080] - paragraph [0084] * * paragraph [0099] - paragraph [0107] *[I] 3-6,9-11,14-17,20-22; | [XI]US2011044303 (JI XUQUAN [CN], et al) [X] 1,3,7,9,12,14,18,20 * abstract * * paragraph [0037] - paragraph [0062] * * figure 2 * [I] 2,4-6,8,10,11,13,15-17,19,21,22 | International search | [A]US2002146032 (ATTIMONT LUC [FR], et al); | [X]CN101584234 (KONINKL PHILIPS ELECTRONICS NV [NL]); | [X]CN102111847 (DATANG MOBILE COMM EQUIP CO) |