EP2713247 - TOUCH OPERATION PROCESSING METHOD AND TERMINAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.08.2020 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 13.09.2019 | ||
Former | Grant of patent is intended Status updated on 29.04.2019 | ||
Former | Examination is in progress Status updated on 15.12.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Huawei Device Co., Ltd. B2-5 of Nanfang Factory No.2 of Xincheng Road Songshan Lake Science and Technology Industrial Zone Dongguan, Guangdong 523808 / CN | [2019/18] |
Former [2017/45] | For all designated states Huawei Device (Dongguan) Co., Ltd. B2-5 of Nanfang Factory No.2 of Xincheng Road Songshan Lake Science and Technology Industrial Zone Dongguan, Guangdong 523808 / CN | ||
Former [2014/14] | For all designated states Huawei Device Co., Ltd. Building B2, Zone B Huawei Industrial Base Bantian Longgang District Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
WANG, Shuoxing Huawei Administration Building, Bantian Longgang Shenzhen Guangdong 518129 / CN | [2014/14] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2019/42] |
Former [2014/14] | Lord, Michael Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | Application number, filing date | 13751782.7 | 20.02.2013 | [2019/42] | WO2013CN71698 | Priority number, date | CN20121040529 | 22.02.2012 Original published format: CN201210040529 | [2014/14] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013123876 | Date: | 29.08.2013 | Language: | ZH | [2013/35] | Type: | A1 Application with search report | No.: | EP2713247 | Date: | 02.04.2014 | Language: | EN | [2014/14] | Type: | B1 Patent specification | No.: | EP2713247 | Date: | 16.10.2019 | Language: | EN | [2019/42] | Search report(s) | International search report - published on: | CN | 29.08.2013 | (Supplementary) European search report - dispatched on: | EP | 09.01.2015 | Classification | IPC: | G06F3/0488, G06F3/041 | [2019/18] | CPC: |
G06F3/04186 (EP,US);
G06F3/04886 (EP,US)
|
Former IPC [2014/14] | G06F3/041 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/14] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERARBEITUNGSVERFAHREN FÜR BERÜHRUNGSOPERATIONEN UND ENDGERÄT | [2014/14] | English: | TOUCH OPERATION PROCESSING METHOD AND TERMINAL | [2014/14] | French: | PROCÉDÉ DE TRAITEMENT D'UNE OPÉRATION TACTILE ET TERMINAL | [2014/14] | Entry into regional phase | 20.12.2013 | Translation filed | 20.12.2013 | National basic fee paid | 20.12.2013 | Search fee paid | 20.12.2013 | Designation fee(s) paid | 20.12.2013 | Examination fee paid | Examination procedure | 20.12.2013 | Examination requested [2014/14] | 03.06.2015 | Amendment by applicant (claims and/or description) | 14.12.2017 | Despatch of a communication from the examining division (Time limit: M04) | 13.04.2018 | Reply to a communication from the examining division | 21.03.2019 | Cancellation of oral proceeding that was planned for 27.03.2019 | 27.03.2019 | Date of oral proceedings (cancelled) | 30.04.2019 | Communication of intention to grant the patent | 09.09.2019 | Fee for grant paid | 09.09.2019 | Fee for publishing/printing paid | 09.09.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.12.2017 | Opposition(s) | 17.07.2020 | No opposition filed within time limit [2020/39] | Fees paid | Renewal fee | 28.02.2015 | Renewal fee patent year 03 | 29.02.2016 | Renewal fee patent year 04 | 28.02.2017 | Renewal fee patent year 05 | 15.02.2018 | Renewal fee patent year 06 | 28.02.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.02.2013 | AL | 16.10.2019 | AT | 16.10.2019 | CY | 16.10.2019 | CZ | 16.10.2019 | DK | 16.10.2019 | EE | 16.10.2019 | ES | 16.10.2019 | FI | 16.10.2019 | HR | 16.10.2019 | IT | 16.10.2019 | LT | 16.10.2019 | LV | 16.10.2019 | MC | 16.10.2019 | MK | 16.10.2019 | MT | 16.10.2019 | PL | 16.10.2019 | RO | 16.10.2019 | RS | 16.10.2019 | SE | 16.10.2019 | SI | 16.10.2019 | SK | 16.10.2019 | SM | 16.10.2019 | TR | 16.10.2019 | BG | 16.01.2020 | NO | 16.01.2020 | GR | 17.01.2020 | IS | 16.02.2020 | PT | 17.02.2020 | IE | 20.02.2020 | LU | 20.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | [2022/32] |
Former [2022/27] | HU | 20.02.2013 | |
AL | 16.10.2019 | ||
AT | 16.10.2019 | ||
CY | 16.10.2019 | ||
CZ | 16.10.2019 | ||
DK | 16.10.2019 | ||
EE | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
IT | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
MC | 16.10.2019 | ||
MT | 16.10.2019 | ||
PL | 16.10.2019 | ||
RO | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
SI | 16.10.2019 | ||
SK | 16.10.2019 | ||
SM | 16.10.2019 | ||
TR | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
IS | 16.02.2020 | ||
PT | 17.02.2020 | ||
IE | 20.02.2020 | ||
LU | 20.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2022/26] | AL | 16.10.2019 | |
AT | 16.10.2019 | ||
CZ | 16.10.2019 | ||
DK | 16.10.2019 | ||
EE | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
IT | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
MC | 16.10.2019 | ||
PL | 16.10.2019 | ||
RO | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
SI | 16.10.2019 | ||
SK | 16.10.2019 | ||
SM | 16.10.2019 | ||
TR | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
IS | 16.02.2020 | ||
PT | 17.02.2020 | ||
IE | 20.02.2020 | ||
LU | 20.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/12] | AL | 16.10.2019 | |
AT | 16.10.2019 | ||
CZ | 16.10.2019 | ||
DK | 16.10.2019 | ||
EE | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
IT | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
MC | 16.10.2019 | ||
PL | 16.10.2019 | ||
RO | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
SI | 16.10.2019 | ||
SK | 16.10.2019 | ||
SM | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
IS | 16.02.2020 | ||
PT | 17.02.2020 | ||
IE | 20.02.2020 | ||
LU | 20.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/08] | AL | 16.10.2019 | |
AT | 16.10.2019 | ||
CZ | 16.10.2019 | ||
DK | 16.10.2019 | ||
EE | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
IT | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
MC | 16.10.2019 | ||
PL | 16.10.2019 | ||
RO | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
SI | 16.10.2019 | ||
SK | 16.10.2019 | ||
SM | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
IS | 16.02.2020 | ||
PT | 17.02.2020 | ||
IE | 20.02.2020 | ||
LU | 20.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/51] | AL | 16.10.2019 | |
AT | 16.10.2019 | ||
CZ | 16.10.2019 | ||
DK | 16.10.2019 | ||
EE | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
IT | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
MC | 16.10.2019 | ||
PL | 16.10.2019 | ||
RO | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
SI | 16.10.2019 | ||
SK | 16.10.2019 | ||
SM | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
IS | 16.02.2020 | ||
PT | 17.02.2020 | ||
LU | 20.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/49] | AL | 16.10.2019 | |
AT | 16.10.2019 | ||
CZ | 16.10.2019 | ||
DK | 16.10.2019 | ||
EE | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
IT | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
MC | 16.10.2019 | ||
PL | 16.10.2019 | ||
RO | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
SK | 16.10.2019 | ||
SM | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
IS | 16.02.2020 | ||
PT | 17.02.2020 | ||
LU | 20.02.2020 | ||
Former [2020/48] | AL | 16.10.2019 | |
AT | 16.10.2019 | ||
CZ | 16.10.2019 | ||
DK | 16.10.2019 | ||
EE | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
IT | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
PL | 16.10.2019 | ||
RO | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
SK | 16.10.2019 | ||
SM | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
IS | 16.02.2020 | ||
PT | 17.02.2020 | ||
LU | 20.02.2020 | ||
Former [2020/38] | AL | 16.10.2019 | |
AT | 16.10.2019 | ||
CZ | 16.10.2019 | ||
DK | 16.10.2019 | ||
EE | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
IT | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
PL | 16.10.2019 | ||
RO | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
SK | 16.10.2019 | ||
SM | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
IS | 16.02.2020 | ||
PT | 17.02.2020 | ||
Former [2020/37] | AL | 16.10.2019 | |
AT | 16.10.2019 | ||
CZ | 16.10.2019 | ||
DK | 16.10.2019 | ||
EE | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
PL | 16.10.2019 | ||
RO | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
SK | 16.10.2019 | ||
SM | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
IS | 16.02.2020 | ||
PT | 17.02.2020 | ||
Former [2020/36] | AL | 16.10.2019 | |
AT | 16.10.2019 | ||
CZ | 16.10.2019 | ||
DK | 16.10.2019 | ||
EE | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
PL | 16.10.2019 | ||
RO | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
IS | 16.02.2020 | ||
PT | 17.02.2020 | ||
Former [2020/35] | AL | 16.10.2019 | |
AT | 16.10.2019 | ||
CZ | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
PL | 16.10.2019 | ||
RO | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
PT | 17.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/32] | AL | 16.10.2019 | |
AT | 16.10.2019 | ||
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
PL | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
PT | 17.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AT | 16.10.2019 | |
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
HR | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
PL | 16.10.2019 | ||
RS | 16.10.2019 | ||
SE | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
PT | 17.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AT | 16.10.2019 | |
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
PL | 16.10.2019 | ||
SE | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
PT | 17.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AT | 16.10.2019 | |
ES | 16.10.2019 | ||
FI | 16.10.2019 | ||
LT | 16.10.2019 | ||
LV | 16.10.2019 | ||
PL | 16.10.2019 | ||
SE | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
GR | 17.01.2020 | ||
PT | 17.02.2020 | ||
Former [2020/22] | FI | 16.10.2019 | |
LT | 16.10.2019 | ||
SE | 16.10.2019 | ||
BG | 16.01.2020 | ||
NO | 16.01.2020 | ||
PT | 17.02.2020 | ||
Former [2020/21] | NO | 16.01.2020 | Documents cited: | Search | [A]US2008098331 (NOVICK GREGORY [US], et al) [A] 1-6 * paragraph [0009] - paragraph [0012] * * paragraph [0035] - paragraph [0036] * * paragraph [0043] - paragraph [0045] * * paragraph [0049] - paragraph [0051] * * paragraph [0059] * * paragraph [0155] - paragraph [0157] * * paragraph [0100] *; | [A]US2009251422 (WU YINGFEI [CN], et al) [A] 1-6 * paragraph [0009] - paragraph [0014] * * paragraph [0029] - paragraph [0033] ** paragraph [0038] - paragraph [0039] *; | [A]US2010302211 (HUANG BIN [CN]) [A] 1-6 * paragraph [0010] * * paragraph [0022] - paragraph [0025] * * paragraph [0026] - paragraph [0029] * * paragraph [0030] - paragraph [0031] * * paragraph [0043] - paragraph [0046] *; | [X]CN102053754 (DONGGUAN YULONG COMM TECH CO, et al) [X] 1-6 * paragraph [0010] - paragraph [0021] * | International search | [A]CN101446872 (VTRON TECHNOLOGIES LTD [CN]); | [A]CN101644978 (VIMICRO CO LTD BEIJING); | [X]CN102053754 (DONGGUAN YULONG COMM TECH CO, et al); | [A]CN102117140 (LENOVO BEIJING CO LTD) |