blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2823653

EP2823653 - SYSTEM AND METHOD FOR HANDLING OF AN UPLINK TRANSMISSION COLLISION WITH AN ACK/NACK SIGNAL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.09.2020
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  11.10.2019
FormerGrant of patent is intended
Status updated on  04.06.2019
FormerExamination is in progress
Status updated on  24.11.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
BlackBerry Limited
2200 University Avenue East
Waterloo, ON N2K 0A7 / CA
[2015/03]
Inventor(s)01 / EARNSHAW, Andrew Mark
4000 Innovation Drive
Ext. 13208
Kanata, Ontario K2K 3K1 / CA
02 / CAI, Zhijun
5000 Riverside Drive
Ext. 63775
Brazos East
Suite 100
Irving, Texas 75039 / US
 [2015/03]
Representative(s)Gill Jennings & Every LLP
The Broadgate Tower
20 Primrose Street
London EC2A 2ES / GB
[2019/46]
Former [2015/03]Finnie, Peter John
Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street
London EC2A 2ES / GB
Application number, filing date13758115.305.03.2013
[2019/46]
WO2013US28991
Priority number, dateUS20121341661809.03.2012         Original published format: US201213416618
[2015/03]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013134187
Date:12.09.2013
Language:EN
[2013/37]
Type: A1 Application with search report 
No.:EP2823653
Date:14.01.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 12.09.2013 takes the place of the publication of the European patent application.
[2015/03]
Type: B1 Patent specification 
No.:EP2823653
Date:13.11.2019
Language:EN
[2019/46]
Search report(s)International search report - published on:US12.09.2013
(Supplementary) European search report - dispatched on:EP14.10.2015
ClassificationIPC:H04L1/18, H04L1/00, H04W4/00
[2015/46]
CPC:
H04L1/0003 (EP,US); H04L1/0009 (EP,US); H04L1/1887 (EP,US);
H04W72/12 (EP,US); H04L1/1858 (EP,US); H04L1/1893 (EP,US)
Former IPC [2015/03]H04W4/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/03]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SYSTEM UND VERFAHREN ZUM ABWICKELN EINER AUFWÄRTSÜBERTRAGUNGSKOLLISION MIT EINEM ACK/NACK-SIGNAL[2015/03]
English:SYSTEM AND METHOD FOR HANDLING OF AN UPLINK TRANSMISSION COLLISION WITH AN ACK/NACK SIGNAL[2015/03]
French:SYSTÈME ET PROCÉDÉ DE GESTION D'UNE COLLISION DE TRANSMISSION DE LIAISON MONTANTE AVEC UN SIGNAL ACK/NACK[2015/03]
Entry into regional phase06.10.2014National basic fee paid 
06.10.2014Search fee paid 
06.10.2014Designation fee(s) paid 
06.10.2014Examination fee paid 
Examination procedure06.10.2014Examination requested  [2015/03]
29.04.2016Amendment by applicant (claims and/or description)
23.11.2017Despatch of a communication from the examining division (Time limit: M04)
26.02.2018Reply to a communication from the examining division
05.06.2019Communication of intention to grant the patent
01.10.2019Fee for grant paid
01.10.2019Fee for publishing/printing paid
01.10.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  23.11.2017
Opposition(s)14.08.2020No opposition filed within time limit [2020/43]
Fees paidRenewal fee
06.01.2015Renewal fee patent year 03
31.03.2016Renewal fee patent year 04
27.03.2017Renewal fee patent year 05
27.03.2018Renewal fee patent year 06
27.03.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.03.2013
AL13.11.2019
AT13.11.2019
CY13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
MK13.11.2019
MT13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
TR13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IE05.03.2020
LU05.03.2020
IS13.03.2020
PT13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
[2022/32]
Former [2022/27]HU05.03.2013
AL13.11.2019
AT13.11.2019
CY13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
MT13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
TR13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IE05.03.2020
LU05.03.2020
IS13.03.2020
PT13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2022/26]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
TR13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IE05.03.2020
LU05.03.2020
IS13.03.2020
PT13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/10]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IE05.03.2020
LU05.03.2020
IS13.03.2020
PT13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/07]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IE05.03.2020
LU05.03.2020
IS13.03.2020
PT13.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/04]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
LU05.03.2020
IS13.03.2020
PT13.03.2020
Former [2020/51]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/49]AL13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/37]AL13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/36]AL13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/35]AL13.11.2019
CZ13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/32]AL13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/25]ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/24]ES13.11.2019
FI13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/23]ES13.11.2019
FI13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
PT13.03.2020
Former [2020/22]FI13.11.2019
LT13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
PT13.03.2020
Former [2020/21]NO13.02.2020
Documents cited:Search[A]EP2184883  (HTC CORP [TW]) [A] 1-15* paragraphs [0001] , [00 3] - [0006] - [0 11] - [0012] - [0 16] *;
 [XA]WO2010053982  (NORTEL NETWORKS LTD [CA], et al) [X] 1,7-9,11,12,14,15 * paragraphs [0003] , [0004] , [1022] , [0023] , [0 35] * [A] 2-6,10,13;
 [XI]US2010331037  (JEN YU-CHIH [TW]) [X] 1,7-9,11,12,14,15 * paragraphs [0008] - [0010] - [0014] , [0032] - [0043] - [0045] * [I] 2-6,10,13;
 [A]  - POTEVIO, "Correction to UL-SCH data transfer after PUSCH resource allocation being discarded", 3GPP DRAFT; R2-105372 CR FOR 36 321(V9.3.0), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20101003), vol. RAN WG2, no. Xi'an; 20101011, XP050452414 [A] 1-15 * Sections "Reason for change" and 5.4.2 *
 [A]  - RESEARCH IN MOTION UK LIMITED, "UCI-only PUSCH transmission", 3GPP DRAFT; R2-115152, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111002), vol. RAN WG2, no. Zhuhai; 20111010, XP050540694 [A] 1-15 * Section "Reason for change" *
International search[A]US2008311919  (WHINNETT NICK W [GB], et al);
 [Y]US2010115367  (HSU CHIA-CHUN [TW]);
 [Y]US2010115360  (SEOK JI AE [KR], et al);
 [Y]US2011246846  (OJALA JUSSI K [FI], et al)
by applicantWO2010053982
 US2010331037
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.