EP2823653 - SYSTEM AND METHOD FOR HANDLING OF AN UPLINK TRANSMISSION COLLISION WITH AN ACK/NACK SIGNAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.09.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 11.10.2019 | ||
Former | Grant of patent is intended Status updated on 04.06.2019 | ||
Former | Examination is in progress Status updated on 24.11.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states BlackBerry Limited 2200 University Avenue East Waterloo, ON N2K 0A7 / CA | [2015/03] | Inventor(s) | 01 /
EARNSHAW, Andrew Mark 4000 Innovation Drive Ext. 13208 Kanata, Ontario K2K 3K1 / CA | 02 /
CAI, Zhijun 5000 Riverside Drive Ext. 63775 Brazos East Suite 100 Irving, Texas 75039 / US | [2015/03] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2019/46] |
Former [2015/03] | Finnie, Peter John Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | Application number, filing date | 13758115.3 | 05.03.2013 | [2019/46] | WO2013US28991 | Priority number, date | US201213416618 | 09.03.2012 Original published format: US201213416618 | [2015/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013134187 | Date: | 12.09.2013 | Language: | EN | [2013/37] | Type: | A1 Application with search report | No.: | EP2823653 | Date: | 14.01.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.09.2013 takes the place of the publication of the European patent application. | [2015/03] | Type: | B1 Patent specification | No.: | EP2823653 | Date: | 13.11.2019 | Language: | EN | [2019/46] | Search report(s) | International search report - published on: | US | 12.09.2013 | (Supplementary) European search report - dispatched on: | EP | 14.10.2015 | Classification | IPC: | H04L1/18, H04L1/00, H04W4/00 | [2015/46] | CPC: |
H04L1/0003 (EP,US);
H04L1/0009 (EP,US);
H04L1/1887 (EP,US);
H04W72/12 (EP,US);
H04L1/1858 (EP,US);
H04L1/1893 (EP,US)
|
Former IPC [2015/03] | H04W4/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/03] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUM ABWICKELN EINER AUFWÄRTSÜBERTRAGUNGSKOLLISION MIT EINEM ACK/NACK-SIGNAL | [2015/03] | English: | SYSTEM AND METHOD FOR HANDLING OF AN UPLINK TRANSMISSION COLLISION WITH AN ACK/NACK SIGNAL | [2015/03] | French: | SYSTÈME ET PROCÉDÉ DE GESTION D'UNE COLLISION DE TRANSMISSION DE LIAISON MONTANTE AVEC UN SIGNAL ACK/NACK | [2015/03] | Entry into regional phase | 06.10.2014 | National basic fee paid | 06.10.2014 | Search fee paid | 06.10.2014 | Designation fee(s) paid | 06.10.2014 | Examination fee paid | Examination procedure | 06.10.2014 | Examination requested [2015/03] | 29.04.2016 | Amendment by applicant (claims and/or description) | 23.11.2017 | Despatch of a communication from the examining division (Time limit: M04) | 26.02.2018 | Reply to a communication from the examining division | 05.06.2019 | Communication of intention to grant the patent | 01.10.2019 | Fee for grant paid | 01.10.2019 | Fee for publishing/printing paid | 01.10.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.11.2017 | Opposition(s) | 14.08.2020 | No opposition filed within time limit [2020/43] | Fees paid | Renewal fee | 06.01.2015 | Renewal fee patent year 03 | 31.03.2016 | Renewal fee patent year 04 | 27.03.2017 | Renewal fee patent year 05 | 27.03.2018 | Renewal fee patent year 06 | 27.03.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.03.2013 | AL | 13.11.2019 | AT | 13.11.2019 | CY | 13.11.2019 | CZ | 13.11.2019 | DK | 13.11.2019 | EE | 13.11.2019 | ES | 13.11.2019 | FI | 13.11.2019 | HR | 13.11.2019 | IT | 13.11.2019 | LT | 13.11.2019 | LV | 13.11.2019 | MC | 13.11.2019 | MK | 13.11.2019 | MT | 13.11.2019 | NL | 13.11.2019 | PL | 13.11.2019 | RO | 13.11.2019 | RS | 13.11.2019 | SE | 13.11.2019 | SI | 13.11.2019 | SK | 13.11.2019 | SM | 13.11.2019 | TR | 13.11.2019 | BG | 13.02.2020 | NO | 13.02.2020 | GR | 14.02.2020 | IE | 05.03.2020 | LU | 05.03.2020 | IS | 13.03.2020 | PT | 13.03.2020 | BE | 31.03.2020 | CH | 31.03.2020 | LI | 31.03.2020 | [2022/32] |
Former [2022/27] | HU | 05.03.2013 | |
AL | 13.11.2019 | ||
AT | 13.11.2019 | ||
CY | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
IT | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
MT | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
TR | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IE | 05.03.2020 | ||
LU | 05.03.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
BE | 31.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2022/26] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
IT | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
TR | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IE | 05.03.2020 | ||
LU | 05.03.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
BE | 31.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/10] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
IT | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IE | 05.03.2020 | ||
LU | 05.03.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
BE | 31.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/07] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IE | 05.03.2020 | ||
LU | 05.03.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/04] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
LU | 05.03.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/51] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/49] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/37] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/36] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/35] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/32] | AL | 13.11.2019 | |
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/25] | ES | 13.11.2019 | |
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/24] | ES | 13.11.2019 | |
FI | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/23] | ES | 13.11.2019 | |
FI | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
PT | 13.03.2020 | ||
Former [2020/22] | FI | 13.11.2019 | |
LT | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
PT | 13.03.2020 | ||
Former [2020/21] | NO | 13.02.2020 | Documents cited: | Search | [A]EP2184883 (HTC CORP [TW]) [A] 1-15* paragraphs [0001] , [00 3] - [0006] - [0 11] - [0012] - [0 16] *; | [XA]WO2010053982 (NORTEL NETWORKS LTD [CA], et al) [X] 1,7-9,11,12,14,15 * paragraphs [0003] , [0004] , [1022] , [0023] , [0 35] * [A] 2-6,10,13; | [XI]US2010331037 (JEN YU-CHIH [TW]) [X] 1,7-9,11,12,14,15 * paragraphs [0008] - [0010] - [0014] , [0032] - [0043] - [0045] * [I] 2-6,10,13; | [A] - POTEVIO, "Correction to UL-SCH data transfer after PUSCH resource allocation being discarded", 3GPP DRAFT; R2-105372 CR FOR 36 321(V9.3.0), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20101003), vol. RAN WG2, no. Xi'an; 20101011, XP050452414 [A] 1-15 * Sections "Reason for change" and 5.4.2 * | [A] - RESEARCH IN MOTION UK LIMITED, "UCI-only PUSCH transmission", 3GPP DRAFT; R2-115152, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111002), vol. RAN WG2, no. Zhuhai; 20111010, XP050540694 [A] 1-15 * Section "Reason for change" * | International search | [A]US2008311919 (WHINNETT NICK W [GB], et al); | [Y]US2010115367 (HSU CHIA-CHUN [TW]); | [Y]US2010115360 (SEOK JI AE [KR], et al); | [Y]US2011246846 (OJALA JUSSI K [FI], et al) | by applicant | WO2010053982 | US2010331037 |